Municipal Affairs Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Municipal Affairs Department - MAD Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date8 Jan 2024
Closing Date25 Jan 2024
Tender Amount₹ 19,19,244 
Notes
Download

Costs

Summary

Nit No- 1060/phe(c) /bmc, Date- 08/01/2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Lifting one no. burnt submersible pump motor set along with column pipe after disconnecting plumbing line and electrical connection etc as per direction of EIC.Lowering the another pump motor set on next day with its column pipe and other accessories and connection plumbing and electrical connection and commissioning etc..As per direction of the EIC

5

26100

5220

... More
Dismantling the 12.5 HP to 17.5HP submersible pump motor assembly along with NRV repairing and through overhauling the submersible pump by replacing GM bush,bearing lock,impeller cooler ring,neck ring,bowel bush.SS bolt,nut,stud,washer,SS key,valve gate etc by supplying new one including necessary machining,turning etc. and reassembling the pump unit including less for unservicable materials.

5

42500

8500

... More
Repairing of 12.5 HP to 17.5 HP submersible pump motor by rewinding and through overhauling by replacing sand guard,thrust bearing,bush bearing oil seal,ss bolt,washer,nut,stud etc by supplying new one including necessary machining,turning etc and reassembling the pump unit including less for unservicable materials.

5

107500

21500

... More
Painting column pipes of each submersible pump motor set with 2 coats of anticorrosive bituminous paint over a coat of RO primer after necessary necessary scrapping as per direction of the EIC,for 3" (80mmdia)/5"(125mm dia) column pipe

10

4360

436

... More
Supplying of following spares for lowering of submersible pump motor unit a)Rubber Gasket @ 10 nos each

50

1250

25

... More
b)Bolts,nuts with washer @5kg each

25

2250

90

... More
c) Motor safety clamp

5

3750

750

... More
Supply of borewell submersible pump,bore well size-200mm total head 41/36 mm pump type: BPD-302/06,Motor type:UMAI-150-9/22,star delta method,motor rating:12.5HP,make KSB

3

244500

81500

... More
Supply and delivery of 125mm dia heavy duty PVC column pipe length 10'-0"(3.10 Mtr) make -Ashirbad/CRI/Raksha

3

21021

7007

... More
Supply and delivery of 3 INCH DIA HEAVY DUTY pvc column pipe length 10'-0"(3.10 Mtr) make -Ashirbad

3

6429

2143

... More
Surging of existing Tube well with chemical treatment and bucket wash (prior to use of compressor machine) and developing the Tube Well with compressor machine at least 3(three) days at 8(eight) hours per day till the yield is obtained at least by 75% of the total specified yield of the tube well (measured by V notch tank) and draw down is within the permissible limit of 10% variation and water so obtained after such washing and developing will be free from sand and bacteria for which test report from the public Analyst is to be obtained(the rate is inclusive of all labour and

3

83586

27862



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.