Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date27 Jun 2024
Closing Date12 Jul 2024
Tender Amount₹ 12,23,850
Costs
EMD
₹ 24,477Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAD_699940_1Bid Award Id
ViewTender No
WBMAD/ULB/RSM/56/24-25Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth
55.16
296088
5367.81
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(i) With 1:6 cement mortar (C) 15 mm thick plaster
15.36
2281
148.53
Neat cement punning about 1.5mm thick in wall, dado, window
sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
15.36
503
32.75
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
140.43
131471
936.21
Hire and labour charges for shuttering with centering and necessary staging
upto 4 m using approved stout props and thick hard wood planks of approved
thickness with required bracing for concrete slabs, beams and columns,
lintels curved or straight including fitting, fixing and striking out after
completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
61.52
12857
209
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm
nominal size) excluding shuttering and reinforcement if any, in ground floor
as per relevant IS codes.
(i) Pakur Variety
55.83
327338
5863.13
Reinforcement for reinforced concrete work in all sorts of structures
including distribution bars, stirrups, binders etc initial straightening and
removal of loose rust (if necessary), cutting to requisite length, hooking and
bending to correct shape, placing in proper position and binding with 16
gauge black annealed wire at every intersection, complete as per drawing
and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL
0.12
6347
55194.51
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation
8.51
659
77.54
GST @ 18%
1026891.9
184840
0.18
Labour Welfare Cess @ 1%
1211732.44
12117
0.01
Total in Figures (including all taxes)
-
1223849
-
Quoted Rate in Figures (including all taxes)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements