Municipal Affairs Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Municipal Affairs Department - MAD Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date2 Dec 2024
Closing Soon13 Dec 2024
Tender Amount₹ 3,63,766.23 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Wbmad/ulb/hm/5144/nit-1769/2nd Call Dt-26.11.2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No. 4 / P - 24/4 Ordinary Cement concrete ( mix 1:2:4) with graded stone chips ( 20 mm nominal size ) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes. a) Pakur Variety

9

5124

46118.34

... More
Item No. 5 / Page No. - 42/36 Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fittings, fixing and striking out after completion of works. ( upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height. shall be taken as 4 m and extra for woks beyond the initial 4 m. ht. shall be allowed under 12(e) for every 4 m or part thereof. ) f) 25 mm to 30 mm shuttering without staging in foundation.

22

205

4510

... More
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work

220

359

78980

... More
Item No. 6 / Page No. - 26/10 (i ) ( Analysis rate ) Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety

17

5623

95603.58

... More
Item No. 7 / Page No. - 43/40 (ii) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. SHYAM / SRMB

1

55087

55087.97

... More
Item No. 8 / Page No. - 1/3 Earth work in filling in foundation trenches or plinth with good earth. in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete. ( Payment to be made on basis of measurement of fiinished quantity of work ) a) With earth obtained from excavation of foundation.

32

77

2481.28

... More
GST Item (Effect from 01.11.2017) 18 % GST on Estimated Cost of Sl No- 1 to 8

1

54940

54940.36

... More
Labour Welfare Cess Item (Effect from 01.11.2017) 1% Labour Welfare Cess on Estmated Cost of Sl No -1 to 9

1

3601

3601.65



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.