Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date29 Dec 2022
Closing Date19 Jan 2023
Tender Amount₹ 72,79,315
Costs
EMD
₹ 1,45,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MAD_438765_5Bid Award Id
ViewTender No
04/BM/2022-23Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidation the same by through saturation with water ramming complete including the cost of supply of sand.
(Payment to be made on measurement of finished quantity)
PWD SOR Vol-I, P-02, It-4
79.14
-
599.61
... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches
PWD SOR Vol-I, P-47, It-3
422
-
24
... More
Cement concrete with graded stone ballast (40 mm size excluding shuttering)
In ground floor, Pakur Variety
PWD SOR Vol-I, P-34, It-22
42.2
-
5060.3
... More
Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 320 Kg of cement with super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula.
In ground floor and foundation. [using concrete mixture], M 25 Grade Pakur Variety
PWD SOR Vol-I, P-25, It-6
377.18
-
6191.98
... More
Reinforcement for reinforced concrete work in the all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial strightening and removal of loose rust (if necessary), cutting requisite length, hooking and binding to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement and upto roof of ground floor /upto 4 m.
Tor steel/Mild Steel - JSW/JSPL/SAM/SRMB/BMASL/ELECTROSTEEL/SSL
PWD SOR Vol-I, P-43, It-40
35.53
-
55254.92
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood plank of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
PWD SOR Vol-I, P-42, It-36
2578.6
-
365
... More
Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.
PWD SOR Vol-I, P-12, It-13
874.26
-
166
... More
Artificial stone in floor, dado, staircase etc. with cement concrete (4:2:1) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (2:1) including smooth finishing and rounding off corners and including application of cement slurry before flooring works, using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm thick topping (High polishing grinding on this item is not permited) with ordinary grey cement. 25 mm thick.
PWD SOR Vol-I, P-48, It-6
264
-
256.96
... More
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
a) In ground floor including roof.
PWD SOR Vol-I, P-10, It-1
140.8
-
447
... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
In ground floor including roof. (a) upto 150 mm. thick PWD SOR Vol-I, P-10, It-2
8.45
-
939
... More
Dismantling R.C. floor, roof, beams etc. includingcutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
(a) In ground floor including roof. PWD SOR Vol-I, P-10, It-3
8.8
-
1956
... More
Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cementmortar (1 :4) on all sides, bottom of the pit consisting of 100 mm thickcement concrete (1 :3:6) with stone chips
over a layer of jhama brickflat soling, 15 mm thick (1 :4) cement plaster to inside wallsand out-sidewalls upto G.L. and 20 mm.thick (1 :4) plaster to bottom of the pit,providingnecessary invert with cement concrete (1 :3:6) with stonechips as per direction, neatcement finishing to entire internal surfaces_ top of the pit covered with 100 mm thickR.C.C. slab (1 :1.5:3) with stonechips and necessary einforcements upto 1 % andshuttering including 6mm thick cement plaster (1 :4) in all external surfaces of the slaband one 560 mm dia. R.C.C. manhole cover of approved make supplied.fitted and fixed inthe slab with cessary fittings, necessary earth working xcavation in all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials. With pakur variety other than SAIL/TATA/RlNL
2
-
6728
... More
Light duty gully pit cover (yard gully) with with frame and hinge arrangement for opening of size Cover: 300 mm X 275 mm X 30 mm
Frame: 450 min X 375 mm X 75 mm
opening: 300mm x 225mm
Weight: 43 kg (approx)
15
-
1233
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement morter including rounding off or chamfering corner as directed and raking out joints or roughening of concrete surface, including throating, nosing and drip course where necessary
PWD SOR Vol-I, P-189, It-1
352
-
124.53
... More
Neat cement punning about 1.5mm thk in wall, dado, window sills floors, drains etc.
PWD SOR Vol-I, P-192, It-15
352
-
32.75
... More
M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. Grill weighing above 16 Kg./sq.mtr and above
PWD SOR Vol-I, P-104, It-13
4.5
-
9696
... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
PWD SOR Vol-I, P-200, It-1
10
-
29
... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary.
On steel or other metal surface - With super gloss (hi-gloss) Two coats (with any shade except white)
PWD SOR Vol-I, P-200, It-2
10
-
79
... More
GST @18%
1
-
1
... More
Labour Welfare Cess @1%
1
-
1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements