Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date8 Jan 2024
Closing DateCancelled
Tender Amount₹ 11,60,429
Costs
EMD
₹ 23,209Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Nit No- 1060/phe(c) /bmc, Date- 08/01/2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAD_641113_8Tender No
NIT No- 1060/PHE(C) /BMC, Date- 08/01/2024Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Lifting one no. burnt submersible pump motor set along with column pipe after disconnecting plumbing line and electrical connection etc as per direction of EIC.Lowering the another pump motor set on next day with its column pipe and other accessories and connection plumbing and electrical connection and commissioning etc..As per direction of the EIC
3
15660
5220
... More
Dismantling the 12.5 HP to 17.5HP submersible pump motor assembly along with NRV repairing and through overhauling the submersible pump by replacing GM bush,bearing lock,impeller cooler ring,neck ring,bowel bush.SS bolt,nut,stud,washer,SS key,valve gate etc by supplying new one including necessary machining,turning etc. and reassembling the pump unit including less for unservicable materials.
2
17000
8500
... More
Repairing of 12.5 HP to 17.5 HP submersible pump motor by rewinding and through overhauling by replacing sand guard,thrust bearing,bush bearing oil seal,ss bolt,washer,nut,stud etc by supplying new one including necessary machining,turning etc and reassembling the pump unit including less for unservicable materials.
2
43000
21500
... More
Painting column pipes of each submersible pump motor set with 2 coats of anticorrosive bituminous paint over a coat of RO primer after necessary necessary scrapping as per direction of the EIC,for 3" (80mmdia)/5"(125mm dia) column pipe
5
2180
436
... More
Supplying of following spares for lowering of submersible pump motor unit
a)Rubber Gasket @ 10 nos each
30
750
25
... More
b)Bolts,nuts with washer @5kg each
15
1350
90
... More
c) Motor safety clamp
3
2250
750
... More
Supply of borewell submersible pump,bore well size-200mm total head 41/36 mm pump type: BPD-302/06,Motor type:UMAI-150-9/22,star delta method,motor rating:12.5HP,make KSB
1
81500
81500
... More
Supply and delivery of 125mm dia heavy duty PVC column pipe length 10'-0"(3.10 Mtr) make -Ashirbad/CRI/Raksha
2
14014
7007
... More
Supply and delivery of 3 INCH DIA HEAVY DUTY pvc column pipe length 10'-0"(3.10 Mtr) make -Ashirbad
1
2143
2143
... More
Surging of existing Tube well with chemical treatment and bucket wash (prior to use of compressor machine) and developing the Tube Well with compressor machine at least 3(three) days at 8(eight) hours per day till the yield is obtained at least by 75% of the total specified yield of the tube well (measured by V notch tank) and draw down is within the permissible limit of 10% variation and water so obtained after such washing and developing will be free from sand and bacteria for which test report from the public Analyst is to be obtained(the rate is inclusive of all labour and
2
55724
27862
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements