Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date7 Aug 2024
Closing Date23 Aug 2024
Tender Amount₹ 22,67,411
Costs
EMD
₹ 45,348Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAD_729130_8Tender No
12/WBMAD/SMC/PW/2024-2025Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Water Bound Macadam Base Course, Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with vibratory roller 8-10 tonnesin stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate,watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting orfilling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404of Specifications for Road & Bridge Works of MoRT&H(5th Revision).
-
-
-
Grading-II Aggregate (53 mm to 22.4 mm) Using Stone Screening Type B (11.2 mm)
-
-
-
Manual Means
65.63
132696
2021.89
Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete asper Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
-
-
-
On Granular surfaces treated with primer (Using Bitumen emulsion at the rate of 0.25 to0.30 kg per sqm.)
875
9598
10.97
Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete asper Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
-
-
-
On Bituminous Surface (Using Bitumen Emulsion at the rate of 0.20 to0.30 kg per sqm.)
2425
22358
9.22
Bituminous Macadam using Mobile Hot Mix Plant (Light Duty)Providing and laying bituminous macadam with Mobile Hot Mix Plant (Light Duty) using approved crushed aggregates of specified grading as per Table 500.7premixed with bituminous binder, transported to sitelaid over a previously prepared surface at specified laying temperature by means of approved and suitable arrangements to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment,cost of fuel and lubricants and wages of operational staff, quality control complete as per Specifications for Road & Bridge Works of MoRT&H (5th Revision).
-
-
-
For Grading II(19 mm nominal size, 50-75 mm thick.)
165
1013050
6139.7
Mastic Asphalt Providing and laying Mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29 using approved coarse aggregate,fine aggregate, filler material and bitumen, prepared by using Mastic cooker including cost and carriage ofall ingredients, cost of heating aggregates and binder,mixing in specified proportions conforming to approved Job Mix Formula and laid to required level and slopeafter cleaning the surface, compacting, sealing the construction joints and surface finishing conforming to specifications including providing antiskid surface with bitumen pre-coated fine-grained hard stone chipping of13.2 mm nominal size at the rate of 0.005 cum per 10sqm and at an approximate spacing of 10 cm center tocenter in both directions, pressed into surface when the temperature of surfaces not less than 100°C, protruding1 mm to 4 mm over mastic surface, including the hire charges of all tools and plants and machinery, pay of operators, cost of
-
-
-
25 mm thickness
1200
624768
520.64
Seal Coat
-
-
-
Providing and laying Premixed Seal Coat (Type B)with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges,cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H(5th Revision).
-
-
-
By Manual MeansWith Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)
2100
80262
38.22
18% GST
1
342452
342452
1% LW CESS
1
22450
22450
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements