Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date18 Dec 2024
Closing Date10 Jan 2025
Tender Amount₹ 28,39,286
Costs
EMD
₹ 56,786Document Cost
₹ 2,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAD_786303_1Bid Award Id
ViewTender No
33/WBMAD/SMC/PW/2024-2025Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Repairing pot-holes and making up small depressions with ramming or power rolling including screening, cleaning chips or metals and washing, dryingas necessary and heating the chips or metal where necessary, cutting pot holes to regular shapes with vertical edges, cleaning the disintegrated materials,heating matrix and applying tack coat (including sides),finishing the top of repaired surface levelled with adjoining area, including cost and carriage of stone aggregates and matrix, excluding cost of applying tackcoat. [Tack coat is to be considered separately]
-
-
-
... More
By grouting method using matrix @ 70 kg / m3 ofloose net volume of course aggregate. Requirementof key aggregate may be taken as 10% of coarseaggregate and size 11.2 mm.
267.25
5136
1372823.16
... More
Bituminous Macadam using Hot Mix Plant (HMP) Providing and laying bituminous macadam with Hot Mix Plant using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over apreviously prepared surface at specified laying temperature with paver finisher to the required grade,level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired -compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Clause 504 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
-
-
-
... More
For Grading II(19 mm nominal size, 50-75 mm thick.)
-
-
-
... More
Using Batch type HMP of minimum capacity 60-90 TPH
133.63
6139
820448.11
... More
Seal Coat
-
-
-
... More
Providing and laying Premixed Seal Coat (Type B)with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges,cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H(5th Revision).
-
-
-
... More
By Manual MeansWith Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)
2672.5
38
104040.43
... More
Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete asper Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
-
-
-
... More
On Bituminous Surface (Using Bitumen Emulsion at the rate of 0.20 to0.30 kg per sqm.)
2672.5
9
24640.45
... More
GST18%
1
428823
428823
... More
1% L W CESS
1
28112
28112
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements