Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date7 Feb 2025
Closing Date3 Mar 2025
Tender Amount₹ 7,28,789
Costs
EMD
₹ 14,576Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_807042_1Tender No
WBMAD/CMC/COM/XVI/2T1/AM/25/01Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
ii) 150 mm dia
6
126
756
... More
Chamfering the spigot end of C.l./D.l. pipes for fitting with the socket of C.I./D.I pipes and/or specials in tyton jointed water mains or other wise using electric grinder as per specification and direction of the Engineer-in-Charge.
[Ref: UD & MA (WS) 2018, Item No.- 2.1.7, Page-10] i) 100 mm dia
20
74
1480
... More
ii) 150 mm dia
6
113
678
... More
Supplying including cost of installation of C.I. Mechanical joint Tee as dimensionally described in IS:13382/2004. Each Tee consists of One C.I. Body, Two C.I. Follower Glands, Two sealing Rubber Gaskets of EPDM quality (Conforming to IS:5382/1985 Type-4) and Zinc coated M.S. Fasteners. The Branch Flange is drilled as per IS: 1538. The whole assembly is mechanically and hydraulically tested to provisions as laid down in IS: 13382/2004.
[Ref: UD & MA (WS) 2018, Item No.- 7.34, Page-41] i) 100x100x100
16
3965
63440
... More
ii) 150x15x100
4
6135
24540
... More
Cast iron double flanged single door swing Non-Return Valve generally
conforming to IS 14846 having body, door cover in graded cast iron to IS
210 Gr. FG 200, body and door rings and bearing block of leaded tin bronze
to I.S 318 Gr. LTB 2, hinge pin of ST AISI410 valves suitable for maximum
working pressure of 10/16 kg/cm² and body tested 15/24 kg/cm².[Ref: UD & MA (WS) 2018, Item No.- 8.9, Page- 49] i) 100 mm ia
20
7377
147540
... More
ii)150 mm dia
6
23702
142212
... More
Supply of E.R.W.M.S. (Electrical Resistant Welded
M.S.) black pipe of ISI mark as per relevent IS
Specification (heavy quality ) having wall thickness
not less than 8 mm. [N.B.: The rates for supply of
TATA Make pipe will be arrived at by adding 20% of
the corresponding rates ][Ref: UD & MA (WS) 2018, Item No.- 8.16, Page-51] i) 100 mm dia
60
871
52260
... More
ii) 150 mm dia
18
1268
22824
... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)[Ref.: PWD (Bldg.) 2017, Item no- 4(A), Page- 2]
13.73
71181
9773.15
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(a) With earth obtained from excavation of foundation. [Ref.: PWD (Bldg.) 2017, Item no- 3(a), Page-1]
105.25
7754
8161.09
... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powder earth or local sand [Ref: PWD (Bldg.) 2017 (3rd CORRIGENDA & ADDENDA, Dt. 04.06.2018), Item no-1, Page-14]
91.52
357
32672.64
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS Codes.(a) Pakur Variety[Ref: Rate Analysis based on PWD(bldg.) 2017 (3rd CORRIGENDA & ADDENDA, Dt. 04.06.2018)]
13.73
5239
71937.79
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(a) 25 mm to 30 mm shuttering without staging in foundation[Ref: PWD (Bldg.) 2017, Item no-36(f), Page-43]
12.48
209
2608.32
... More
Dewatering by pumps including all leads, lifts and making all arrangements of disposal, where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage, breakage and making wet connections. [Note :- In case of any other situation demanding such emergency dewatering, use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specificdirection duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] [Ref: UD & MA (WS) 2018, Item No.- 7.2, Page- 27]
90
33
2970
... More
Add 18% GST
18
6115
110070.45
... More
Add @ 1% cess
1
7215
7215.73
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%