Ministry Of Road Transport And Highways Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Ministry Of Road Transport And Highways - MORTH Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date11 Jun 2024
Closing Date11 Jul 2024
Tender Amount₹ 41,44,939
Costs
EMD
₹ 83,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Repair And Rehabilitation Of Samsi Bridge And Kanua Bridge
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MoRTH_811228_1Bid Award Id
ViewTender No
01(2nd Call) of 2024-25 of SE, NHC-IITender Authority
Ministry Of Road Transport And Highways ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specification (Reference to MORT&H's specification 2807).
67.5
-
-
... More
Epoxy bonding of new concrete to old concrete ( crack/spalling shall be sealed with epoxy injection/grouting coating of epoxy resin @ 0.80kg /sqm should be applied ) (Reference to MORT&H's specification 2805).
13.5
-
-
... More
Providing anti-corrosive protective coating to inhibit the corrosion to HYSD reinforcements including two coats of anti-corrosive coatings of consumption as per manufacturer's specification, cleaning etc. complete as per the direction of the Engineer-in-Charge.
1.69
-
-
... More
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy (Reference to MORT&H's specification 2800).
68
-
-
... More
Sealing of cracks/porous concrete (within the limits of practical pressure 100kpa -400kpa until refusal ) by injection process through nipples/Grouting complete as per Technical Specification (Reference to MORT&H's specification 2806).
Cement Grout
95.2
-
-
... More
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1
(Reference to MORT&H's specification 2803).
30.6
-
-
... More
Excavation in Soil by Manual Means
Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 1000 metres (Reference to MoRT&H's specification clause 301).
224.25
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete all including vibrating and compacting, finishing, curing, sampling, testing etc. by mechanically mixed as per drawing and Technical Specifications
(Reference to MORT&H's specifications 1500, 1700 & 2200).
RCC Grade M20
Height upto 5m
Using concrete Mixer
24.64
-
-
... More
Supplying, binding, fixing etc. including initial straightening, cutting to requisite length, hooking and bending to correct shape, placing in proper postion of uncoated HYSD reinforcement bar in super-structure complete as per drawing and technical specifications (Reference to MORT&H's specification 1600)
2.03
-
-
... More
Flexible Apron :(Shall be provided beyond curtain walls for a min distance of 3m on u/s and 6m on d/s side ) Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall (Reference to MORT&H's specification 2507.2).
75.9
-
-
... More
Drainage Spouts not less than 100 mm dia of corrosive resistance material ,spacing not exceeding 10 m. complete as per drawing and Technical specification (Reference to MORT&H's specification 2705).
6
-
-
... More
Hire and labour charges for staging with sal bullah for super structure of bridge (Major and Minor) including stripping off and removing clearing on completion of work as per design and drawing approved by the Engineer-in-charge.
135
-
-
... More
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm (Reference to MORT&H's specification 800).
43.56
-
-
... More
Plain/Reinforced cement concrete in open foundation complete all including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 & 2200).
PCC Grade M15
67.96
-
-
... More
Brick masonry work with 1st class full size bricks except when necessary to complete the bond in
cement morter 1:3 in sub-structure complete, including thoroughly soaking the bricks in a tank filled with
water for a minimum period of one hour prior to being laid, protecting the green structure from rain by
suitable covering and with a minimum Seven days curing etc., but excluding pointing and plastering, as per drawing and Technical. Specifications.(Reference to MORT&H's specifications 1300 & 2200)..
3.79
-
-
... More
Plastering with cement mortar (1:3) on brick work in sub-structure complete all including raking out joints curing, etc as per Technical Specifications (Reference to MORT&H's specifications 1300 & 2200).
136
-
-
... More
(B) KANUA BRIDGE (KM 38.400) OF NH-31
Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Reference to MORT&H's specification clause 202)
80
-
-
... More
Cleaning the exposed corroded Reinforcement as well as worn out concrete by sand blasting with air compressor including all materials, hire charges of machineries and labour etc. all complete as per technical specification and direction of the Engineer-in-Charge.
95.58
-
-
... More
Patching of damaged concrete surface with polymer concrete and
curing compounds, initiator and promoter, available in present
formulations, to be applied as per instructions of manufacturer and as approved by the Engineer (Reference to MORT&H's specification 2800). Thickness of patching = 25mm
23.9
-
-
... More
Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specification (Reference to MORT&H's specification 2807).
95.58
-
-
... More
Epoxy bonding of new concrete to old concrete ( crack/spalling shall be sealed with epoxy injection/grouting coating of epoxy resin @ 0.80kg /sqm should be applied ) (Reference to MORT&H's specification 2805).
23.9
-
-
... More
Providing anti-corrosive protective coating to inhibit the corrosion to HYSD reinforcements including two coats of anti-corrosive coatings of consumption as per manufacturer's specification, cleaning etc. complete as per the direction of the Engineer-in-Charge.
3.35
-
-
... More
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy (Reference to MORT&H's specification 2800).
89
-
-
... More
Sealing of cracks/porous concrete (within the limits of practical pressure 100kpa -400kpa until refusal ) by injection process through nipples/Grouting complete as per Technical Specification (Reference to MORT&H's specification 2806).
Cement Grout
155.75
-
-
... More
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1 (Reference to MORT&H's specification 2803).
53.4
-
-
... More
Excavation in Soil by Manual Means
Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 1000 metres (Reference to MoRT&H's specification clause 301).
278.88
-
-
... More
Supplying, binding, fixing etc. including initial straightening, cutting to requisite length, hooking and bending to correct shape, placing in proper postion of uncoated HYSD reinforcement bar in super-structure complete as per drawing and technical specifications (Reference to MORT&H's specification 1600)
0.5
-
-
... More
Flexible Apron :(Shall be provided beyond curtain walls for a min distance of 3m on u/s and 6m on d/s side ) Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall (Reference to MORT&H's specification 2507.2).
75.9
-
-
... More
Drainage Spouts not less than 100 mm dia of corrosive resistance material ,spacing not exceeding 10 m. complete as per drawing and Technical specification (Reference to MORT&H's specification 2705).
4
-
-
... More
Hire and labour charges for staging with sal bullah for super structure of bridge (Major and Minor) including stripping off and removing clearing on completion of work as per design and drawing approved by the Engineer-in-charge.
191.16
-
-
... More
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm (Reference to MORT&H's specification 800).
62.92
-
-
... More
Plain/Reinforced cement concrete in open foundation complete all including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 & 2200).
PCC Grade M15
89.57
-
-
... More
Brick masonry work with 1st class full size bricks except when necessary to complete the bond in cement morter 1:3 in sub-structure complete, including thoroughly soaking the bricks in a tank filled with water for a minimum period of one hour prior to being laid, protecting the green structure from rain by suitable covering and with a minimum Seven days curing etc., but excluding pointing and plastering, as per drawing and Technical. Specifications.(Reference to MORT&H's specifications 1300 & 2200)..
5.88
-
-
... More
Plastering with cement mortar (1:3) on brick work in sub-structure complete all including raking out joints curing, etc as per Technical Specifications (Reference to MORT&H's specifications 1300 & 2200).
220
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements