Military Engineer Services Tender

... More
The MES has issued a formal invitation for competitive bids for the Military Engineer Services project, for Provn Of Single Officer Accn (capt And Equivalent) In South Zone At Binnaguri Mil Stn Under Ge (south) Binnaguri in Jalpaiguri, West Bengal, with an estimated contract value of Rs. 23,00,000. The bid opening date for this tender is 02-05-2025 and the last date for bid submission is 20-06-2025. Interested bidders for Military Engineer Services tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Military Engineer Services - MES Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date2 May 2025
Closing Date20 Jun 2025
Tender Amount₹ 23,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 27 to 32.

1

-

-

... More
S&F of wall bracket decorative LED light fitting with Lamp 5 Watt warm white wooden finish fixture with necessary connection, complete all as specified and as directed by Engineer-in-charge.

4

-

-

... More
SCHEDULE 'A' PART-XI (MISCELLANEOUS ITEMS REQUIRED FOR B/R & E/M SERVICES (TO BE QUOTED BY CONTRACTOR))

-

-

-

... More
SCHEDULE 'A' PART-IV (AREA DRAINAGE)

-

-

-

... More
SCHEDULE 'A' PART-VI (HOT WATER SUPPLY)

-

-

-

... More
SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE)

-

-

-

... More
Lump sum price worked out by the contractor for SEWAGE DISPOSAL as listed in Schedule ‘A’ Part-VII of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VII on Serial Page No. 34 to 35.

1

-

-

... More
SCHEDULE 'A' PART-VIII (EXTERNAL WATER SUPPLY)

-

-

-

... More
Lump sum price worked out by the contractor for (HOT WATER SUPPLY) as listed in Schedule ‘A’ Part-VI of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VI on Serial Page No. 33.

1

-

-

... More
Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-VIII of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VIII on Serial Page No. 36.

1

-

-

... More
Lump sum price worked out by the contractor for (EXTERNAL ELECTRIFICATION) as listed in Schedule ‘A’ Part-X of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-X on Serial Page No. 41.

1

-

-

... More
S&F of Modular TV socket, 1 module 6 Amp one way including back plate and top cover fixed flushed to wall, ISI marked, complete all as specified and as directed by Engineer-in-charge.

1

-

-

... More
M & L for horizontal boring across the existing road without disturbing the road surface for inserting GI pipe, Complete all as specified and directed by Engineer-in-Charge. Note :- GI pipe Shall be measured and paid respective

3

-

-

... More
SCHEDULE 'A' PART-VII (SEWAGE DISPOSAL)

-

-

-

... More
SCHEDULE 'A' PART-III (ROAD PATH AND CULVERT)

-

-

-

... More
Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of RCC framed structure for single officer living accn (Capt & equivalent) (single storey) in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc including scooter shed complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22.

1

-

-

... More
SCHEDULE 'A' PART-I (BUILDING & STRUCTURE)

-

-

-

... More
S&F of LED bed side light fitting of 3 Watt 3000K with necessary connection, complete all as specified and as directed by Engineer-in-charge.

2

-

-

... More
S&F of modular white cover plate with frame 12 module inclusive of inner & outer plate, complete all as specified and as directed by Engineer-in-charge.

2

-

-

... More
Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of Rock framed structure single officer Garrage in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc including scooter shed complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22.

1

-

-

... More
SCHEDULE 'A' PART-X (EXTERNAL ELECTRIFICATION)

-

-

-

... More
SCHEDULE 'A' PART-IX (INTERNAL WATER SUPPLY)

-

-

-

... More
Lump sum price worked out by the contractor for ROAD PATH AND CULVERT as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 25.

1

-

-

... More
S&F non-metallic rigid PVC medium grade 20mm dia conduit and conduit accessories (ISI Marked) concealed in wall, complete all as specified and as directed by Engineer-in-charge.

5

-

-

... More
Lump sum price worked out by the contractor for AREA DRAINAGE as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 26.

1

-

-

... More
Lump sum price worked out by the contractor for (INTERNAL WATER SUPPLY) as listed in Schedule ‘A’ Part-IX of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IX on Serial Page No. 37 to 40.

1

-

-

... More
Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 to 24.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.