Kolkata Municipal Corporation Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Housekeeping Services
Eprocure
Opening Date7 Mar 2025
Closing Date28 Mar 2025
Tender Amount₹ 10,99,689
Costs
EMD
₹ 22,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KMC_822989_1Tender No
KMC/DGC/BR-VIII/88/41/24-25/RTender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. ( 3rd Corrigenda & addenda dated 04.06.2018)
2.98
736
2189.6
... More
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
15.6
19
296.31
... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster
46.69
161
7516.29
... More
BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 1. Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment)
32.78
306
10030.68
... More
BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 3.Spreading of sludge, dump manure,/farm yard manure/animel dung manure and good earth in required thickness. This includes supply of labour, tools & plants excluding materials.
0.36
175
63
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25%for each addl. floor above 4th floor) (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. (MODE OF MEASUREMENT):-The weight of grill per sq.m. will be determined by taking thephysical weight of fabricated grill and dividing the same by covered area of the same. N.B. No shop priming will be allowed to facilitate inspection of workmanship. Weight of grill is to be taken after final grinding and finishing the weld. (3rd Corrigenda & addenda dated 04.06.2018)
6.7
9888
66249.6
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
78.16
29
2266.64
... More
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface : With other than hi-gloss of approved quality-(iv) Two coats (with any shade except white)
39.09
72
2814.12
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(ii) Two coats (white in shade)
39.09
77
3009.78
... More
Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-divider / footpath)
46
292
13454.08
... More
ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES
0.74
5498
4090.51
... More
Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone.
23
8
187.91
... More
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone.
23
18
419.52
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved makeand brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : With other than hi-gloss of approved quality-(i) One coat (white in shade)
11.95
47
561.74
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : With other than hi-gloss of approved quality-(iii) One coat (with any shade except white)
11.55
48
554.4
... More
BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 38. Supplying, fitting & fixing Glass mosaic tiles at finished plain wall surface of size 20 mm x 20 mm x 4 mm in all colour,design, fixing in customize design as per direction of Engineerin- Charge. The glass mosaic tiles to be fixed on the wall surface with the help of approved adhesive applied at the rate of 2.5 kg per sqm and grouting of the same. The rate is inclusive of all operation, material and required pattern approved by Engineer-in-Charge. [At Ground Floor] i) Plain Type/ Random Mix
43.82
1302
57053.64
... More
SUPPLYING FIBRE GLASS RELIEF WORKS OF ARTS IC NATURE ( TWO DIMENSIONAL MURAL WORK OR THREE DIMENSIONAL MODEL) INCLUDING ALL MATERIALS LIKE FIBRE GLASS, IRON OR METAL FRAME INSIDE FIBRE GLASS FOR RIGIDITY, APPLYING N.C COAT PAINT, ETC. COMPLETE AND FIXING THE SAME TO WALL OR ON GROUND/ OTHER BASE INCLUDING GROUTING WITH CEMENT CONCRETE WORK COMPLETE IN ALL RESPECTS AS PER DIRECTION OF E.I.C ( THE RATE IS EXCLUDING GST & 1% LABOUR WELFARE CESS)
67.23
10399
699191.64
... More
Sub Total
-
-
-
... More
GST 18%
1
166088
166088.39
... More
CESS 1%
1
10888
10888.02
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements