Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date19 Feb 2024
Closing Date8 Mar 2024
Tender Amount₹ 17,75,971
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_669366_1Bid Award Id
ViewTender No
KMC/WS/ARSM/42/2023-24Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
TAKING OUT THE BEARINGS HAVING ID (70 MM -200MM) WITH" "PROPER CARE AND CAUTION BY PROVIDING ALL RELEVANT" "TOOLS AND FIXTURES AND COMPLETE IN ALL RESPECT AS" "PER DIRECTION OF EIC. [ MODE OF MESURENT :{ NUMBER OF" "BEARING *(THICKNESS OF BEARING MULTIPLIED BY SUM OF ID" "& OD OF THE BEARINGS.)}]" "3X5.5X(12+26)= 627
627
31350
50
... More
TAKING OUT THE ROTOR (HAVING BALL AND ROLLER" "BEARINGS) FROM THE STATOR AFTER SEQUENTIAL" "DE-ASSEMBLING OF THE HT MOTOR PART BY PART & AFTER" "NECESSARY MEASUREMENT AND DEMARCATION AND" "PLACING THE SAME ON THE PEDESTAL AT THE WORKING" "FLOOR BY USING DEPARTMENTAL OVER HEAD CRANE" "ETCWITH CARE AND CAUTION WITH THECOMPLIANCE OF THE" "RELEVANT SAFETY NORMS & COMPLETE AS PER DIRECTION" "OF EIC.(MODE OF MEASUREMENT-DRIVE MOTOR WATT X NO" "OF POLES / RPM)" "400X1000X6 / 989= 2426.6
2426.6
5095
2.1
... More
TO AND FRO TRANSPORTATION OF ROTOR ASSEMBLY FROM" "WORK SITE TO THE ROTOR REPAIRING /SERVICING WORK" "SHOP AND VICE VERSA INCLUDING LOADING AND UNLOADING" "WITH PROPER CARE AND CAUTION OF ROTOR ASSEMBLY AS" "PER DIRECTION OF EIC.(MODE OF MEASUREMENT- WT OF" "ROTOR WITH HALF COUPLING) =1.2 MT (MOTOR) + 0.05 MT" "(HALF COUPLING) =1.25
1.25
4725
3780
... More
TO AND FRO TRANSPORTATION OF STATOR ASSEMBLY FROM" "WORK SITE TO THE STATOR REPAIRING /SERVICING WORK" "SHOP AND VICE VERSA INCLUDING LOADING AND UNLOADING" "WITH PROPER CARE AND CAUTION AS PER DIRECTION OF" "EIC.(MODE OF MEASUREMENT- WT OF STATOR OF THE" "MOTOR ) = 2.8 MT
2.8
10584
3780
... More
REMOVAL OF HALF COUPLING USING HYDRAULIC PULLER" "AND FIXTURES ETC VERY CAUTIOUSLY WITHOUT DAMAGING" "THE SHAFT AND COMPLETE AS PER DIRECTION OF EIC (" "MODE OF MESURMENT : DRIVE MOTOR WATT X NUMBER OF" "POLES / RPM)" "= 400 X 1000 X 6 / 989 = 2426.6
2426.6
1334
0.55
... More
FITTING AND FIXING OF HALF COUPLING BY HYDRAULIC JACK" "AND SPECILIZED FIXTURES AND COMPLETE IN ALL RESPECT" "AS PER DIRECTION OF EIC (MODE OF MEASUREMENT- DRIVE" "MOTOR WATT * NO. OF POLES / RPM)" "= 400*1000*6/989 = 2426.6
2426.6
1213
0.5
... More
TAKING OUT ALL STATOR COILS AFTER TAKING NECESSARY" "PARAMETER FROM STATOR SLOTS VERY CAUTIOUSLY BY" "ARRANGING ALLTHE MACHINERIES, SKILLED MAN POWER," "TOOLS AND TACKLES AS INVOLVED WITH PROPER CARE AND" "COMPLETE CAREFULLY AS PER DIRECTION OF EIC ( MODE OF" "MEASUREMENT- LENGHT OF COIL -{2X( SLOT LENGHT X" "NUMBER OF COILS)}X 1.05 [ MULTIPLYING FACTOR FOR" "OVERHANG PORTION]. { 2X(0.582X72)} X1.05 = 87.99
87.99
15398
175
... More
THOROUGH CLEANING THE 6KV RATED STATOR SLOTS FROM" "DUST DIRT LOOSE PARTICLES ETC AND DRYING THE STATOR" "SLOTS COMPLETE CAREFULLY AS PER DIRECTION OF EIC." "(HOT SPOT TEST TO BE CARRIED OUT FOR CHECKING THE" "HEALTHINESS OF STATOR CORE) (MODE OF MEASUREMENTMEASURED" "SURFACE INNER AREA{I.E. STATOR CORE INNER" "DIA X 3.142 X LENGTH OF THE CORE} OF THE CORE OF THE" "COMPLETE STATOR) 0.560 X 3.142 X 5.82 =1.02
1.02
15366
15065
... More
MAKING DEFECTIVE CORES AFRESH BY REPAIRING OF" "LAMINATIONS, STAMPING ETC, WITH INSULATION AND" "COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION" "AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT -" "MEASURED SURFACE INNER AREA {I.E. STATOR CORE INNER" "DIA X 3.142 XLENGTH OF CORE} OF THE CORE OF THE" "COMPLETE STATOR) 0.560 X 3.142 X 5.82 =1.02
1.02
34899
34215
... More
REPLACEMENT OF DAMAGED COILS AS IDENTIFIED BY EIC, BY" "NEW IDENTICAL COILS WITH PROPER CROSS SECTION ," "INSULATION, WITH CARE AND CAUTION AND COMPLETE IN ALL" "RESPECT AS PER DIRECTION OF EIC. (THE RATE IS AFTER" "DEDUCTING THE SALVAGE VALE OF OLD DAMAGED COPPER" "COILS) (MODE OF MEASUREMENT - GROSS WEIGHT OF" "COILS)=EACH COIL WEIGHT 5KG *72 COIL= 360KG.
360
1013400
2815
... More
HEAT VARNISHING THE HT RATED STATOR WINDING WITH" "TWO COATS OF DR BECK HTF50 VARNISH AND SUBSEQUENT" "HEATING TO A SUITABLE TEMPERATURE TILL REQUISITE" "RESULT IS OBTAINED TO GET THE SATISFACTORY IR VALUE," "PI VALUE, INDUCTANCE/RESISTANCE MEASUREMENT AND HV" "TEST AND COMPLETE IN ALL RESPECT WITH PROPER CARE" "AND CAUTION AS PER DIRECTION OF EIC. (ALL TEST" "CERTIFICATE TO BE FURNISHED) ( MODE OF MEASUREMENTMEASURED" "SURFACE INNER AREA {I.E. STATOR CORE INNER" "DIA X 3.142X {(LENGTH OF CORE )+(2X OVER HANG LENGTH" "OF THE COIL )} OF THE CORE OF THE COMPLETE STATOR)" "0.56 X 3.142 X {(0.585) + 2 X 0.29} = 2.04
2.04
21481
10530
... More
MAKING THE DEFECTIVE ROTOR CORES AFRESH BY" "REPAIRING OF LAMINATIONS, STAMPINGS ETC WITH" "INSULATION AND COMPLEYTE IN ALL RESPECT WITH PROPER" "CARE AND CAUTION AS PER DIRECTION OF EIC.[MODE OF" "MEASUREMENT- MEASURED SURFACE PERIMETER OF THE" "ROTOR AREA{I.E. CORE OUTER DIA X3.142 X LENGTH OF" "CORE} OF THE COMPLETE ROTOR]. 0.557 X 3.142 X 0.582 =1.01
1.01
9817
9720
... More
REPLACEMENT OF THE DAMAGED STATOR END TERMINAL" "(COPPER CONDUCTOR) FROM HT RATED STATOR WINDING TO TERMINAL BOARD AND MAKE NECESSARY CONNECTIONCS BY" "PROVIDING ALL SOCKETS, SLEEVES ETC AND COMPLETE IN" "ALL RESPECT WITH PROPER CARE AND CAUTION AS PER" "DIRECTION OF EIC. [MODE OF MEASUREMENT- WEIGHT OF" "THE COMPLETE CONDUCTOR, SOCKETS & SLEEVES ETC]
5
29150
5830
... More
HEAT VARNISHING OF THE ROTOR OF THE HT RATED MOTOR" "WITH TWO COATS DR. BECK HTF-50 VARNISH AND" "SUBSEQUENT HEATING TO SUITABLE TEMPERATURE TILL" "REQUISITE RESULT IS OBTAINED AND COMPLETE IN ALL" "RESPECT WITH PROPER CARE AND CAUTION AS PER" "DIRECTION OF EIC.[ MODE OF MEASUREMENT-MEASURED" "SURFACE INNER AREA {I.E. STATOR CORE INNER DIAX" "3.142X{[LENGTH OF CORE)+(2X OVERHANG LENGTH OF THE" "COIL)} OF THE CORE OF THE COMPLETE STATOR)" "0.56 X 3.142 X {(0.585) + 2 X 0.29} = 2.04
2.04
20053
9830
... More
TRUENESS AND ECCENTRICITY CHECKING OF THE ROTOR" "ASSEMBELY OF HT MOTOR AND DYNAMIC BALANCING OF THE" "COMPLETE ASSEMBELY AT RATED SPEED BY ADDING OR" "REMOVING THE UNBALANCED MASS AT A REPUTED" "WORKSHOP & COMPLETE IN ALL RESPECT WITH PROPER" "CARE & CAUTION AS PER DIRECTION OF EIC. (DYNAMIC" "BALANCING CERTIFICATES TO BE FURNISHED) [MODE OF" "MEASUREMENT - WEIGHT OF THE COMPLETE ROTOR] = 1200" "KG
1200
32400
27
... More
FITTING FIXING OF BALL /ROLLER BEARING (HAVING MINIMUM" "ID-75 MM TO 200 MM) BY APPLYING THE METHOD OF" "EXPANSION OF INNER RACE IN HOT OIL DIPPING OR OTHER" "SUITABLE METHOD OF EXPANSION WITH PROPER CARE AND" "CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION" "OF EIC [ MODE OF MEASUREMENT- NO. OF BEARING *(THICK" "NESS OF BEARING MULTIPLIED BY SUM OF ID & OD OF THE" "BEARINGS) = 3*5.5*(12+26) = 627
627
53295
85
... More
STATUTORY TESTING SUCH AS HV TESTING, SURGE" "COMPENSATION TESTING, CAPACITANCE TESTING," "RESISTANCE TESTING, PI VALUE MEASUREMENT, TAN DELTA" "ETC AS PER RELEVANT IS OF HT MOTOR & COMPLETE IN ALL" "RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION" "OF EIC. (ALL TEST CERTIFICATES TO BE FURNISHED)
1
25270
25270
... More
ASSEMBLING THE HT RATED MOTOR AFTER INSERTING THE" "ROTOR (HAVING BALL OR ROLAR BEARINGS ATTACHMENT" "ETC) INTO STATOR MAINTAINING THE PROPER AIR GAP WITH" "CARE AND CAUTION & COMPLIANCE OF THE RELEVANT" "SAFETY NORMS & COMPLETE IN ALL RESPECT AS PER" "DIRECTION OF EIC. ( MODE OF MEASUREMENT - GROSS" "WEIGHT OF THE MOTOR) = 4 MT
4
19440
4860
... More
PLACING THE COMPLETE ASSEMBLED MOTOR ON THE SOLE" "PLATE BY UTILIZING THE OVERHEAD CRANES AVAILABLE IN" "THE PUMPING STATIONS, TIGHTENING THE FOUNDATION" "BOLTS, FIXING THE DOWELS PINS, AND COMPLETE IN ALL" "RESPECT AS PER DIRECTION OF EIC. [MODE OF MEASUREMENT - GROSS WEIGHT OF THE MOTOR] 4MT.
4
3800
950
... More
MAKING ALIGNMENT OF THE MOTOR WITH THE PUMP SHAFT" "BY USING DIAL GAUGE ETC INCLUDING INSERTION OF" "REQUSIT DIMENTIONED BRASS SHEETS ON SOLE PLATE WITH" "THE MAINTANENCE OF THE AIR GAP AND COMPLETE IN ALL" "REAPECT AS PER VDIRECTION OF EIC. [MODE OF" "MEASUREMENT - WATTAGE OF THE DRIVE MOTOR X NO OF" "POLES/RPM] 400 X1000X6 /989 = 2426.6
2426.6
4367
1.8
... More
MAKING HT CONNECTIONS OF MOTOR TERMINALS WITH ALL" "EXISTING CABLES CONNECTED WITH THE FEEDER BREAKER/" "CAPACITOR/SOFT STARTER AND LT CONNECTIONS AS EXISTS" "OF THE MOTOR SPACE HEATER/ MOTOR TEMPERATURE" "SCANNER AND EARTHING TERMINALS ETC COMPLETE IN ALL" "RESPECT AS PER DIRECTION OF EIC.
1
4375
4375
... More
MAKING COUPLING THE HT PUMP WITH THE DRIVE MOTOR BY" "INSERTING THE COUPLING PINS ETC WITH CARE & CAUTION" "AND COMPLETE AS PER DIRECTION OF EIC.[ MODE OF" "MEASUREMENT- DRIVE MOTOR WATT X NO OF POLES /RPM]" "400 X1000 X6 / 989 = 2426.6
2426.6
1213
0.5
... More
COMMISSIONING THE HT MOTOR WITH LOAD AND DO" "NEEDFULL OBSERVATION UNDER TRIAL RUN TO ACHIVE THE" "SATISFACTORY OPERATION OF THE HT MOTOR WITH LOAD" "AND COMPLETE IN ALL RESPECT WITH PROPER CARE &" "CAUTION AS PER DIRECTION OF EIC.[MODE OF" "MEASUREMENT-PER DAY BASIS]
1
7500
7500
... More
PREPARATION OF ERODED SURFACE OF THE SHAFT AND DO" "NEEDFUL FOR SURFACE DEVELOPMENT BY METAL" "DEPOSITION/ MACHINEABLE ELECTRODE ON THE PITTED/" "ERODED PORTION AND MACHINING AND FINISHING THE" "SHAFT AND COMPLETE AS PER DIRECTION OF EIC ( MODE OF" "MEASUREMENT : AREA OF THE ERODED PORTION, I.E 3.142 X" "D X AXIAL ERODED LENGTH X MAXIMUM DEPTH OF EROSION" "OF SHAFT SURFACE ) = 3.142 X 12 X 11 X 0.3 = 124.4
124.4
40430
325
... More
BEARING NO NU324 AS PER CATALOGUE
3
75255
25085
... More
Sub Total
-
-
-
... More
GST 18%
1
268228
268228
... More
L.W.Cess @1%
1
17583
17583.87
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements