Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Eprocure
Opening Date11 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 3,65,983
Costs
EMD
₹ 7,320Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KMC_798177_1Tender No
KMC/ WS/PATULI/BPS/23-24/03Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
CHAPTER - VIII SUPPLYING OF MATERIALS E. E. R. W. MS BLACK PIPE 8.15 Sypply of E.R.W.M.S. (Electrical Resistant Welded M.S.) black pipe of ISI Mark as per relevent IS Specification ( heavy quality ) having wall thickness not less than 5 mm. [N.B.: The rates for supply of TATA Make pipe will be arrived at by adding 20% of the corresponding rates ] Diameter in mm (Internal)150
29
1268
36772
... More
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3 M.S. Pipes 2.3.1 Gas cutting of M.S. pipes and/or M.S. plates of different thickness all complete as per specification and direction of the Engineer-in- Charge. Thikness in mm 5mm to 8mm thick plate
26.39
213
5621.67
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (b) Continuous weld.
5278.56
9
47507.04
... More
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.4Valves 2.4.1 Lowering, fitting and fixing of all types of valves in proper position and alignment using chain pully block or crane(for diameter above 250 mm) by providing temporary support,as required,gaskets,nuts& bolts etc.all cornplete as per specification and direction of the Engineer-in-Charge.[The rate Includes cost of flange joints]150mm dia.
13
1510
19630
... More
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.
0.06
1956
120.03
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?33..Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per
relevant IS codes. Pakur variety?
0.03
5275
145.02
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
4.01
29
116.18
... More
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
4.01
79
316.48
... More
CHAPTER - VIII SUPPLYING OF MATERIALS 8.6Cost iron double flanged manually operated sluice valves generally conforming to IS 14846 : 2000, having four faces and spindle nut of gunmetal. inside screw non- rising type quality gunmetal /AISI 410 spindle: seat tested to 10kg/CM... and body tested to 15kg/CM..., flanges flat faced and drilled to 1.S.: 1538 : 1993. Painted black all over with asphalt base paint. Valves tested by closed end method. NB Diameter in mm 150
10
7487
74870
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 18)Fitter Mechanic (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
14
270
3780
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
35
245
8575
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 13)Santras. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
8
326
2608
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
14
326
4564
... More
Estimated amount
-
-
-
... More
GST 9%
1
27638
27638
... More
GST 9%
1
27638
27638
... More
CESS 1%
1
3623
3623.59
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%