Kolkata Municipal Corporation Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date15 Feb 2024
Closing Date29 Feb 2024
Tender Amount₹ 9,97,830
Costs
EMD
₹ 19,957Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_667192_1Bid Award Id
ViewTender No
KMC/WS/PROJECT/80/2023-24Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or sandstone)
including removing, spreading or stacking the spoils within a lead of
75 m. as directed. The item includes necessary trimming the sides of
trenches levelling, dressing and ramming the bottom, bailing out
water as required complete. (a) Depth of excavation not exceeding
1,500 mm.
0.23
2683
11927
... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or sandstone)
including removing, spreading or stacking the spoils within a lead of
75 m. as directed. The item includes necessary trimming the sides of
trenches levelling, dressing and ramming the bottom, bailing out
water as required complete (b) Depth of excavation for additional
depth beyond 1,500 mm. and upto 3,000 mm. but not requiring
shoring
0.16
3051
19238
... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
6. Hire and labour charges for shoring work (including necessary
close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting
etc) complete as per direction of the Engineer-in charge for
foundation excavation (vertical surface are in contact with supported
earth is to be measured.) (This item should be executed on specific
direction of the Enginner in charge).(a) Depth upto 1.5 m.
33
12738
386
... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
6. Hire and labour charges for shoring work (including necessary
close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting
etc) complete as per direction of the Engineer-in charge for
foundation excavation (vertical surface are in contact with supported
earth is to be measured.) (This item should be executed on specific
direction of the Enginner in charge). (b) For additional depth beyond
1.5 m. and upto 3.00 m
27.2
11939
439
... More
Labour for diving Sal_bullah/Eucalyptus bullah piles by monkey in
sorts of soil including hoisting and placing piles in position ,protecting
the pile head with iron ring and cutting and shapping heads before
and after driving and including hire and labour for necessary driving
appiances and all tackles. (iii)150 mm diameter
140
14700
105
... More
Supplying Eucalyptus-bullah piles at work site,including dressing and
maiking one end pointed iii)150mm dia meter
140
30380
217
... More
CHAPTER - VII MISCELLANEOUS ITEMS Coating of 'Epoxy' Resin
of thickness not less than 160 micron with a
lowviscosity,crystallization-resistant epoxy resin base with a reactive
diluents combined with high build epoxy amine adducts as per BS
5493 standard and a polyamide or amido polyamine or any other
suitable hardener. It shall react with epoxy resin at normal ambient
temperature, suitable for solvent-free coatings as per recommended
proportion for use on metal,concrete and wood surface to protect
from corrosion as well as damagefrom chemical reaction after making
the surface free from dust, oil and moisture etc. all complete as per
instruction and to the satisfaction of ElC. [This item will be operated
on prior permission from the concerned SE/Dy Chief Engineer]
66.56
29885
449
... More
CHAPTER - VII MISCELLANEOUS ITEMS Application of two coats of
Epoxy primer as per BS 5493 by brush on the cleaned dry concrete
surface with epoxy resin primer with reactive suitable hardener
mixture as per specification and direction of EIC all complete. [This
item will be operated on prior permission from the concerned SE/DyChief Engineer]
66.56
26358
396
... More
CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps
including all leads, lifts and making all arrangements of disposal.
where continuous flow of water from a source other than natural or
ground water is encountered in case of emergency maintenance
works related to leakage. breakage and making wet connections.
[Note ;- In case of any other situation demanding such emergency
dewatering. use of this item is to be approved by the Superintending
Engineer/Tender Accepting Authority. This item shall be executed on
the specific direction duly supported by proper clarification of the
E.I.C. who will be satisfied in absolute discretion that such work has
not been necessitated due to any natural source of water or any fault
of the Contractor]
85
2805
33
... More
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF
MACHINERIES 8.26 Hire charges of moveable crane with fuel &
manpower having load handling capacity upto 14MT with the 45 deg.
moveable arrangement & the boom length of 40 feets for loading &
unloading of various materials / accessories of water supply works.
For minimum engagement of 8 hrs. In a day
7
55552
7936
... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
3. Earth work in filling in foundation trenches or plinth with good earth,
in layers not exceeding 150 mm. including watering and ramming etc.
layer by layer complete. (Payment to be made on the basis of
measurement of finished quantity of work) (a) With earth obtained
from excavation of foundation.
0.37
2898
7754
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,
GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in
columns, beams etc. with simple rolled structural members (e.g.
joists, angle, channel sections conforming to IS: 226, IS: 808 & SP
(6)- 1964 connected to one another with bracket, gussets, cleats as
per design, direction of Engineer-incharge complete including cutting
to requisite shape and length,fabrication with necessary bolting, metal
arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes
of approved make and brand conforming to IS:814- 2004, haulage,
hoisting and erection all complete. The rate includes the cost of rolled
steel section, consumables such as electrodes, gas and hire charge
of all tools and plants and labour required for the work including all
incidental chages such as electricity charges, labour insurance
charges etc. Payment to be made on the basis of calculated weight of
structural members only in finished work as per IS specified weight.
Payment for gusset, bracket, cleat, rivets, bolts and nuts may be
make by adding the actual weight of such items with the weight of
finished structural members or 7% of weight for finished structural
members weighing not less than 22.5 Kg. / m. or 15 % of weight for
finished structal members weighing less than 22.5 Kg. / m. may be
increased allow for bracket, cleat, rivet, bolts and nuts etc. and no
seperate payment being made for these items, as per direction of
Engineer In Charge. The rates are considered for a height of erection
8m. / 2nd floor level from the ground. Add 1.5% extra over the rate forKg./m
each additional floor or 4m. beyond initiial 8m. or part thereof. I) For
structural members of specified sections weighing less than 22.5
1.69
99816
59119
... More
Estimated amount
-
-
-
... More
GST 18%
1
150704
150704
... More
CESS 1%
1
9879
9879.51
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements