Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Machinery and Tools
Eprocure
Opening Date30 Dec 2024
Closing Date11 Jan 2025
Tender Amount₹ 2,41,706
Costs
EMD
₹ 6,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_792214_1Bid Award Id
ViewTender No
KMC/WS/TPS/13(RT)/2024-2025Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
SEQUENTIAL LIFTING OF THE DE-ASSEMBLED COMPONENTS (VIZ WHEELS, AXELS, GEAR,PINION ETC) AND DO NEEDFUL TO REASSEMBLE THE SAME WITH FITTING AND FIXING OF THE SAME AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC
1
7975
7975
... More
.LIFTING,FITING & FIXING THE LOAD CHAIN, HAND CHAIN AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC
1
1705
1705
... More
SEQUENTIAL SERVICING & OVERHAULING OF THE CRAB-TROLLY ASSEMBLY AND ITS CROSS TRAVEL AUGNMENT WITH PROPER CARE & CAUTION IN ALL RESPECT AS PER DIRECTION OF EIC.
1
2035
2035
... More
CHECKING, SERVICING & OVERHAULING OF THE BRAKE-ASSEMBLY AND ITS RATCHET LOCKING ARRANGEMENT OF THE 10 TO 12.5 MT HOT CRANE AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC
1
6050
6050
... More
CHECKING, CLEANING AND OVERHAULING OF THE CRANE RAIL,GRANTRY GIRDER ETC WITH LONG TRAVEL ARRANGEMENT AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC
1
2475
2475
... More
ARRANGEMENT TO REPLACE THE HAND CHAINS AS IS BEING USED TO OPERATE THE LOAD CHAIN OF THE 10 TO 12.5 MT CAPACITY HOT CRANE AND COMPLETE IN ALL RESPECT AS PER DIRECTION.
35
495
17325
... More
ARRANGEMENT TO REPLACE THE HAND CHAINS AS IS BEING USED TO MAKE THE LONG TRAVEL & CROSS TRAVEL OF THE 10 TO 12.5 MT CAPACITY HOT CRANE AND COMPLETE IN ALL RESPECT AS PER DIRECTION
35
495
17325
... More
REPAIRING & OVERHAULING OF THE TROLLEY FITTED WITH THE MAIN CRANE GRIDER OF HOLDING THE 5.0 MT CAPACITY CHAIN PULLY BLOCK WITH REPLACEMENT OF DAMAGED PARTS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC BY PROVIDING ALL REQUIRED ACCESSORIES TOOLS & TACKLES ETC
3
2750
8250
... More
REPAIRING & OVERHAULING & LOAD TESTING OF THE 5.0 MT CAPACITY CHAIN PULLY BLOCK & ITS TROLLEY WITH REPLACEMENT OF DAMAGED PARTS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC BY PROVIDING ALL REQUIREDACCESSORIES,TOOLS & TACKLES ETC)
3
7150
21450
... More
PAINTING THE CRANE, GIRDER TROLLY AND ALL OTHER STEEL STRUCTURE AFTER SCRAPPING AND REMOVING OLD PAINTS WITH TWO COATS OF YELLOW SYNTHETIC PAINT ALL COMPLETE AS PER DIRECTION OF EIC
1
7150
7150
... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster)
50.72
186
9433.92
... More
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(4)Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) :(Two coats)ii) Luxury Quality
50.72
70
3550.4
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc 10?. Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety)
2.5
4482
11205
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive of 10%contractors profit and 1% Labour welfare cess which wouldbeadmissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages
10
326
3260
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 18)Fitter Mechanic (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
10
270
2700
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (a) Tack weld
450
9
4050
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (b) Continuous weld
470
9
4230
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metalarc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolledsteel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight ofstructural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight forfinishedstructuralmembers weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate foreach additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m
0.21
59119
12592.35
... More
SUPPLY DELIVERY ERECTION & COMMISSIONING OF INDEF MAKE TRIPLE SPUR GEAR CHAIN PULLEY BLOCK WITH HOOK SUSPENSIONS TYPE (STANDARD LIFT OF 3 MTRS ) MODLE HEAVY DUTY INDEF- P- CAPACITY- 5 TON.
1
52444
52444.9
... More
Sub Total
-
-
-
... More
GST 18%
1
36506
36506
... More
L.W.Cess @1%
1
2393
2393.14
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements