Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Machinery and Tools
Eprocure
Opening Date22 Dec 2023
Closing Date2 Jan 2024
Tender Amount₹ 1,40,071 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PAINTING OF THE INSIDE VALVE BODY & DISC WITH TWO COATS OF ANTI CORROSIVE PAINTS OF APPROVED QUALITY AS REQUIRED AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (MODE OF MEASUREMENT- DIAMETER OF VALVE DISC IN CM).

68

4216

62

... More
ARRANGEMENT FOR SURFACE DEVELOPMENT BY METAL (MOC-SS) DEPOSITION/MACHINEABLE ELECTRODE ON THE PITTED/ERODED PORTION OF THE TOP SHAFT AND BOTTOM SHAFT OF BUTTERFLY VALVE FOR RECLAMATION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (MODE OF MEASUREMENT- ERODED SURFACE AREA OF THE SHAFT- 2*(3.14 X DIA X ERODED LENGTH OF THE SHAFT) = 2X3.14X7.5X7

329.7

9231

28

... More
SUPPLY FITTING & FIXING OF THE PHOSPHOR BRONZE BUSH FOR THE TOP SHAFT OF BUTTERFLY VALVE AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (MODE OF MEASUREMENT-2 X DIAMETER OF VALVE SHAFT IN CM). = 2X7.5 CM

15

10095

673

... More
SUPPLY FITTING & FIXING OF THE PHOSPHOR BRONZE BUSH FOR THE BOTTOM SHAFT OF BUTTERFLY VALVE AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (MODE OF MEASUREMENT-2 X DIAMETER OF VALVE SHAFT IN CM).= 2X7.5 CM

15

10095

673

... More
SUPPLY, FITTING & FIXING OF O RING SET (MOC-EPDM) FOR THE TOP SHAFT BUTTERFLY VALVE AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (MODE OF MEASUREMENT-3 X DIAMETER OF VALVE SHAFT IN CM).=3X7.5 CM

22.5

7065

314

... More
SUPPLY, FITTING & FIXING OF SPYRET  EPDM SEAL FOR THE DISC OF THE B/F VALVE AND SUPPLY OF NEW BOLTS  AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (MODE OF MEASUREMENT- DIAMETER OF VALVE DISC IN CM). DIA OF VALVE DISC= 68 CM

68

10540

155

... More
SEQUENTIAL REASSEMBLING OF THE VALVES AND MAKE IT READY FOR FITTING & FIXING WITH EXISTING PIPELINE SYSTEM AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (MODE OF MEASUREMENT- DIAMETER OF VALVE DISC IN CM).DIA OF VALVE DISC = 68 CM

68

8364

123

... More
FITTING & FIXING OF THE BUTTERFLY VALVE WITH THE EXISTING PIPE LINE SYSTEM WITH NEW GASKET AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (MODE OF MEASUREMENT- DIAMETER OF VALVE DISC IN CM).DIA OF VALVE DISC = 68 CM

68

7344

108

... More
DISMANTLING THE GEARBOX FROM THE B/F VALVE USING NECESSARY ATTACHMENT, CHAIN PULLEY, PULLER , TOOLS & TACKLES ETC. AS PER DIRECTION OF EIC.

1

2300

2300

... More
TO & FRO TRANSPORTATION OF GEARBOX FROM THE WORKING SITE TO THE CONTRACTOR WORKSHOP AND VICE VERSA AFTER REPAIRING AS PER DIRECTION OF EIC.

1

3600

3600

... More
DISMANTLING THE GEARBOX COMPONENTS SUCH AS WORM GEAR , SECTOR PINION , SPUR GEAR ATTACHMENTS, KEY, BEARINGS USING PULLER AND OTHER NECESSARY ARRANGEMENT WITH DAMAGING ANY COMPONENT WITH NECESSARY WORKS ETC. COMPLETE AS PER DIRECTION OF EIC.

1

2740

2740

... More
REASSEMBLING THE GEARBOX VIZ.  WORM GEAR , SECTOR PINION , SPUR GEAR ATTACHMENTS, KEY, BEARINGS USING PULLER AND OTHER NECESSARY ARRANGEMENT WITHOUT DAMAGING ANY COMPONENT ,CLEANING AND GREASING ETC. COMPLETE AS PER DIRECTION OF EIC.

1

5450

5450

... More
FITTING FIXING THE GEARBOX WITH THE EXISTING VALVE SHAFT MAINTAINING PROPER ALIGNMENT AND ADJUSTMENT OF THE SECTOR PINION, FITTING OF KEY, TIGHTENING THE MOUNTING BOLTS, ADJUSTMENT AND FIXING STOPPER BOLT ETC. AND TO ENSURE FULL OPEN / CLOSE AT 90 DEGREE ROTATION.

1

2600

2600

... More
SUPPLY AND DELIVERY OF NEW WORM GEAR WITH NEW WORM SHAFT.

1

4880

4880

... More
SUPPLY AND DELIVERY OF NEW SECTOR PINION.

1

3550

3550

... More
CLEANING , GREASING AND PAINTING OF GEARBOX .

1

1780

1780

... More
SUPPLY AND DELIVERY OF NEW STAINLESS STEEL STOPPER BOLTS .

1

1850

1850



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.