Kolkata Municipal Corporation Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date25 Jun 2024
Closing Date4 Jul 2024
Tender Amount₹ 2,81,644
Costs
EMD
₹ 5,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_699015_1Bid Award Id
ViewTender No
KMC/PBPS/AD/M-1/2024-2025Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
FABRICATION, SUPPLY,STORING AT SITE, INSTALLATION & COMMISSIONING OF TRASHRACK/BAR SCREEN / GRATING CONFORMONG TO RELEVENT IS CODES(IS:11388, IS:800, IS:2062) FABRICATED WITH STRUCTURAL STEEL SECTIONS SUCH AS MS FLAT,CHANNELS,ANGLES ETC. INCLUDING COST OF MATERIALS, MACHINARY,LABOUR,CUTTING,ALIGING,WELDING AS PER APPROVED DRAWING INCLUDING TRANSPORTATION CHARGES AS PER DIRECTION. IRRIGATION & WATERWAYS DEPTT, USOR(M & E) SCHEDULE 2022. PAGE NO.-100, SL. NO.-5.2.15
901.26
114460
127
... More
BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT . A. ROOFING & SHEETWALLING 14. Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side)
steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm &
25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work). (i) In Roof:- a) With 0.5 mm thick sheet
42.58
33510
787
... More
M.S PLATE HAVING THICKNESS ABOVE 2 MM. UPTO 10 MM. CONSIDERING THICKNESS 3.55 MM FOR M.S ENTRANCE GATE @ RS. 73.00 PER KG.[FROM IRRIGATION & WATERWAYS DEPARTMENT/ MECHANICAL & ELECTRICAL
DIRECTORATE/USOR (M&E)-2022/CHAPTER -4.1/SL. NO. -1(B)/P-67] TOTAL PLATE AREA FOR M.S ENTRANCE GATE M.S GATE = 3.6576 MTR. X 2.4384 MTR.= 8.9187 SQ. MTR. CONSIDERING
PLATE THICKNESS 3.55 MM. WEIGHT=27.87/SQ.MTR. NOW TOTAL AREA OF THE PLATE =8.9187X27.87 KG.= 248.5642 KG. COST INVOLVEMENT FOR M.S. PLATE =RS. 248.5642X 73 =RS. 18145.1866
248.56
18145
73
... More
CHEQUERED PLATE ABOVE 4 MM. THICKNESS FOR THE SUMP INSPECTION COVER AND PUMP ROOM@ RS. 71.93 PER KG.[FROM IRRIGATION & WATERWAYS DEPARTMENT/ MECHANICAL & ELECTRICAL DIRECTORATE/USOR (M&E)-2022/CHAPTER -4.1/SL. NO. -1(B)/P-67
418.06
30071
71.93
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc 10?. Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety
1.44
6454
4482
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 5. Labour for hoisting and placing in proper position (up to 1st floor level) departmental R.S. joists, channels, angles. Tees, plates etc. including fitting and fixing
same with bolts and nuts, if necessary (but excluding cost of such bolts and nuts)
14.32
5899
412
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
95
2755
29
... More
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
95
7505
79
... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including
throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
16.25
3022
186
... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
16.25
552
34
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
15
3675
245
... More
Estimated amount
-
-
-
... More
Add: 9%SGST
1
21269
1
... More
Add: 9%CGST
1
21269
1
... More
1% LWC
1
2788
1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements