Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Excavation
Eprocure
Opening Date14 Aug 2024
Closing Date27 Aug 2024
Tender Amount₹ 2,99,952
Costs
EMD
₹ 6,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Kmc/ws/ee/s/091/2024-2025/03/ 1st Call
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_733373_1Bid Award Id
ViewTender No
KMC/WS/EE/S/091/2024-2025/03/ 1st CallTender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as
per IS : 1239 (Part - I). (A) PVC Pipes(Dia) (i)100 mm
36
31464
874
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works 6 Supplying PVC strainer of approved make with adapter conforming to I.S.12818 specifications. (iv) 100 mm dia
26
17628
678
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as
per IS : 1239 (Part - I). (J) Threaded End Cap (Dia) (k) 150 mm
1
302
302
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as
per IS : 1239 (Part - I). (L) Reducing Socket (mm X mm) (v) 150 X 100
1
443
443
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works 26 Providing and fixing bell plug as required upto 250 mm (internal) dia. ERWMS pipe including cost of materials and labour complete
1
431
431
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works Labour for boring through any type of soil for sinking tube well of required dia. with top enlargement by rig boring system (either by reserve circulation or by direct rotary method) including hire charges and labour for rig machine, tools and plants, staging, force pumping set and making arrangement for water required for boring etc. complete and lowering of pipes, strainers, blind pipes etc. complete.(c) For depth upto 250 metre for 150 mm dia. Tube well with
top enlargement of 300 mm dia.(upto 50 metre.) (ii) Next 50 metre Note: (i) For item no. 2, measurement will be taken below G.L. taking G.L. as zero for payment. (ii) For item no. 1 & 2 for bored depth where no lowering of pipe is involved the corresponding rates would be reduced by 30%.
42
44772
1066
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works Labour for boring through any type of soil for sinking tube well of required dia. with top enlargement by rig boring system (either by reserve circulation or by direct rotary method) including hire charges and labour for rig machine, tools and plants, staging, force pumping set and making arrangement for water required for boring etc. complete and lowering of pipes, strainers, blind pipes etc. complete. (a) For depth upto 250 metre for 100 mm dia. Tube well with top enlargement of 200 mm dia.(upto 50 metre). (i) First 50 metre Note:(i) For item no. 2, measurement will be taken below G.L. taking G.L. as zero for payment. (ii) For item no. 1 & 2 for bored depth where no lowering of pipe is involved the corresponding rates would be reduced
by 30%
50
50700
1014
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works Labour for boring through any type of soil for sinking tube well of required dia. with top enlargement by rig boring system (either by reserve circulation or by direct rotary method) including hire charges and labour for rig machine, tools and plants, staging, force pumping set and making arrangement for water required for boring etc. complete and lowering of pipes, strainers, blind pipes etc. complete.(a) For depth upto 250 metre for 100 mm dia. Tube well with top enlargement of 200 mm dia.(upto 50 metre). (ii) Next 50 metre Note: (i) For item no. 2, measurement will be taken below G.L. taking G.L. as zero for payment. (ii) For item no. 1 & 2 for bored depth
where no lowering of pipe is involved the corresponding rates would be reduced by 30%
13
11479
883
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works 24 Packing the annular space between the outside of the tube well pipes & strainers and the bore with pea size washed gravel of approved quality having size from 2 mm to 5 mm or the size approved
by the Engineer-incharge including cost of all materials labour and equipment complete. Note: Initial 6 m. of Annular space between the housing pipe and the bore should not be shrouded with Pea size gravel to avoid contamination with surface water.
2.53
5133
2029
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL(a) Original Works 20 Washing and developing tube well with air compressor pump and engine for 8 (eight) hours continuous pumping per day with
necessary arrangements for testing the yield in gallons per hour with 'V' notch including hire and labour charges for all tools and plants and
scaffolding as required
4
30152
7538
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works 23 Collecting sample of water for bacteriological and chemical test from any depth at any time during execution of work including hire and labour charges for tools and plants and sterilising the equipments, paying all charges and fees, testing etc. complete in all respect as per direction.
1
1231
1231
Estimate amount
-
-
-
GST 18%
1
45302
45302
CESS 1%
1
2969
2969.83
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements