Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date14 Aug 2024
Closing Date27 Aug 2024
Tender Amount₹ 2,99,952 
Notes
Download

Costs

Summary

Kmc/ws/ee/s/091/2024-2025/03/ 1st Call

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). (A) PVC Pipes(Dia) (i)100 mm

36

31464

874

... More
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works 6 Supplying PVC strainer of approved make with adapter conforming to I.S.12818 specifications. (iv) 100 mm dia

26

17628

678

... More
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). (J) Threaded End Cap (Dia) (k) 150 mm

1

302

302

... More
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(III) Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). (L) Reducing Socket (mm X mm) (v) 150 X 100

1

443

443

... More
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works 26 Providing and fixing bell plug as required upto 250 mm (internal) dia. ERWMS pipe including cost of materials and labour complete

1

431

431

... More
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works Labour for boring through any type of soil for sinking tube well of required dia. with top enlargement by rig boring system (either by reserve circulation or by direct rotary method) including hire charges and labour for rig machine, tools and plants, staging, force pumping set and making arrangement for water required for boring etc. complete and lowering of pipes, strainers, blind pipes etc. complete.(c) For depth upto 250 metre for 150 mm dia. Tube well with top enlargement of 300 mm dia.(upto 50 metre.) (ii) Next 50 metre Note: (i) For item no. 2, measurement will be taken below G.L. taking G.L. as zero for payment. (ii) For item no. 1 & 2 for bored depth where no lowering of pipe is involved the corresponding rates would be reduced by 30%.

42

44772

1066

... More
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works Labour for boring through any type of soil for sinking tube well of required dia. with top enlargement by rig boring system (either by reserve circulation or by direct rotary method) including hire charges and labour for rig machine, tools and plants, staging, force pumping set and making arrangement for water required for boring etc. complete and lowering of pipes, strainers, blind pipes etc. complete. (a) For depth upto 250 metre for 100 mm dia. Tube well with top enlargement of 200 mm dia.(upto 50 metre). (i) First 50 metre Note:(i) For item no. 2, measurement will be taken below G.L. taking G.L. as zero for payment. (ii) For item no. 1 & 2 for bored depth where no lowering of pipe is involved the corresponding rates would be reduced by 30%

50

50700

1014

... More
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works Labour for boring through any type of soil for sinking tube well of required dia. with top enlargement by rig boring system (either by reserve circulation or by direct rotary method) including hire charges and labour for rig machine, tools and plants, staging, force pumping set and making arrangement for water required for boring etc. complete and lowering of pipes, strainers, blind pipes etc. complete.(a) For depth upto 250 metre for 100 mm dia. Tube well with top enlargement of 200 mm dia.(upto 50 metre). (ii) Next 50 metre Note: (i) For item no. 2, measurement will be taken below G.L. taking G.L. as zero for payment. (ii) For item no. 1 & 2 for bored depth where no lowering of pipe is involved the corresponding rates would be reduced by 30%

13

11479

883

... More
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works 24 Packing the annular space between the outside of the tube well pipes & strainers and the bore with pea size washed gravel of approved quality having size from 2 mm to 5 mm or the size approved by the Engineer-incharge including cost of all materials labour and equipment complete. Note: Initial 6 m. of Annular space between the housing pipe and the bore should not be shrouded with Pea size gravel to avoid contamination with surface water.

2.53

5133

2029

... More
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL(a) Original Works 20 Washing and developing tube well with air compressor pump and engine for 8 (eight) hours continuous pumping per day with necessary arrangements for testing the yield in gallons per hour with 'V' notch including hire and labour charges for all tools and plants and scaffolding as required

4

30152

7538

... More
SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (a) Original Works 23 Collecting sample of water for bacteriological and chemical test from any depth at any time during execution of work including hire and labour charges for tools and plants and sterilising the equipments, paying all charges and fees, testing etc. complete in all respect as per direction.

1

1231

1231

... More
Estimate amount

-

-

-

... More
GST 18%

1

45302

45302

... More
CESS 1%

1

2969

2969.83



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.