Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Machinery and Tools
Eprocure
Opening Date17 Dec 2024
Closing Date31 Dec 2024
Tender Amount₹ 5,50,356
Costs
EMD
₹ 12,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Kmc/igwtp/257/24-25, Dt-09/12/2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_784010_1Tender No
KMC/IGWTP/257/24-25, DT-09/12/2024Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
SEQUENTIAL DE-ASSEMBLING OF THE INSPECTION COVER/WINDOWS/LOUVERS AND DE-COUPLING OF THE HT PUMP FROM THE DRIVE MOTOR BY REMOVING THE COUPLING BOLTS,WITH CARE & CAUTION AND KEPT IN THE DEPT.GODOWN.(MODE OF MEASUREMENT-DRIVE MOTOR WATTXNO OF POLES/RPM)
20052.48
-
17044.61
... More
DEMOUNTING THE PARTLY DISSEMBLED INSPECTION COVER/ DE-ASSEMBLE INSPECTION COVER/LOUVER ETC,OF THE HT MOTOR FROM SOLE PLATE AND PLACING THE SAME ON THE WORKING FLOOR USING DEPT.OVER HEADCRANE,WITH CARE & CAUITION WITH COMPLIANCE OF THE RELEVANT SAFETY AND PROTECTION NORMS.(MODE OF MEASUREMENT-WEIGHT OF MOTOR WITH HALF COUPLING)
7
1250
8750
... More
PLACING THE COMPLETE ASSEMBLED MOTOR ON THE SOLE PLATE BY UTILIZING THE OVER HEAD CRANES AVAILABLE IN THE PUMPING STATION, TIGHTENING THE FOUNDATION BOLTS,FIXING THE DOWELS PINS(MODE OF MEASUREMENT-GROSS WEIGHT OF THE MOTOR)
7
950
6650
... More
TAKING OUT THE ROTOR(HAVING BUSH-BEARING ATTACHMENTS) FROME THE STATOR AFTER SEQUENTIAL DE-ASSEMBLING OF THE HT MOTOR PARTS WITH NECESSARY DEMARCATION AND PLACING THE ROTOR ON APEDESTAL AT THE WORKING FLOOR BY USING DEPT.OVERHEAD CRANE WITH CARE & CAUITIONAND COMPLIANCE OF THE SAFETY NORMS(MODE OF MEASUREMENT-DRIVE MOTOR WATTXNO OF POLES/RPM)
20052.48
1
25065.6
... More
ASSEMBLEING THE HT RATED MOTOR ?STATOR AND INSERTING THE ROTOR( HAVING BUSH BEARING ATTACHMENT) INTO STATOR WITH THE MAINTENANCE OF THE AIR GAP WITH CARE & CAUTION AND COMPLIANCE OF RELEVANT SAFETY NORMS 7 COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT-GROSES WEIGHT OF THE MOTOR
7
9720
68040
... More
FITTING FIXING OF THE BUSH BEARING BY LAPPING &MATCHINING WITH PROPER CARE & CAUITION AND COMPLETE AS PER DIRECTION OF THE EIC.(MODE OF MEASUREMENT-ENTIRE INTERNAL SURFACE AREA OF THE WHITE METAL OF THE BUSH-BEARING)
3519.04
10
35190.4
... More
CLEANING OF THE BEARING HOUSE & FITING FIXING OF THE OIL RINGS BY PROVIDING MATCHING SCREWS & PINS ETC AND POURING OF THE NEW LUBRICATING OIL AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (NOTE-OIL RINGS & LUBRICATING OIL TO BE SUPPLIED BY THE DEPARTMENT){MODE OF MEASUREMENT-DIA IN CM OF THE OIL RINGS X NO OF OIL RINGS}.
140
125
17500
... More
DUSTING OF THE ROTOR OF HT MOTOR BY SUITABLE BRUSH AND MOIST FREE GAS(OXYGEN)/CLEAN DRY AIR JETTING ARRANGEMENT (PRESSURE IS NOT SO LONG AS TO DAMAGED THE INSULATION) AND SUBSEQUENT HEATING AND CLEANING WITH PETROLEUM BASE ORGANIC COMPOUND(MODE OF MEASUREMENT-{MEASURED SURFACE INNER AREA {I.E. STATOR CORE INNER DIAXIIX{LENTH OF CORE)+(2X OVERHANG LENTH OF THE COIL) OF THE CORE OF THE COMPLETE STATOR)
3.5
4000
14000
... More
DUSTING OF THE STATOR WINDINGS OF HT MOTOR BY SUITABLE BRUSH AND MOIST FREE GAS(OXYGEN)/CLEAN DRY AIR JETTING ARRANGEMENT (PRESSURE IS NOT SO LONG AS TO DAMAGED THE INSULATION) AND SUBSEQUENT HEATING AND CLEANING WITH PETROLEUM BASE ORGANIC COMPOUND.(MODE OF MEASUREMENT-{{MEASURED SURFACE INNER AREA {IE. STATOR CORE INNER DIA.XIIX(LENTH OF CORE)+(2XOVERHANG LENTH OF THE COIL)}OF THE CORE OF THE COMPLETE STATOR)}}
3.7
5345
19776.5
... More
HEAT VARNISHING OF THE ROTOR OF THE HT MOTOR WITH TWO COATS OF DR.BECK HTF-50 VRNISH AND SUBSEQUENT HEATING TO SUITABLE TEMPERATURE TILL REQUISITE RESULT IS OBTAINED (MODE OF MEASUREMENT-{{MEASURED SURFACE INNER AREA{I.E.STATOR CORE INNERDIAXIIX(LENTH OF CORE)+(2X OVERHANG LENTH OF THECOIL)}OF THE CORE OF THE COMPLETE STATOR)
3.5
9830
34405
... More
HEAT VARNISHING OF THE STATOR WINDING OF THE HT MOTOR WITH TWO COATS OF DR.BECK HTF-50 VRNISH AND SUBSEQUENT HEATING TO SUITABLE TEMPERATURE TILL REQUISITE RESULT IS OBTAINED TO GET THE SATISFACTORY IR VALUE,PI VALUE,INDUCTANCE/RESISTANCE MEASUREMENT & HIGH VOLTAGE TEST (MODE OF MEASUREMENT-MEASURED SURFACE INNER AREA{I.E. STATOR CORE INNER DIA.XIIX{LENTH OF CORE)+(2XOVERHANG LENTH OF THE COIL) OF THE CORE OF THE COMPLETE STATOR)}}
3.7
10530
38961
... More
DE-COUPLING OF THE HT PUMP FORM THE DRIVE MOTOR BY REMOVING THE COUPLING BOLTS ETC WITH CARE & CAUTION AND KEPT THE COUPLING BOLTS IN THE DEPARTMENTAL GO-DOWN & COMPLETE AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT-DRIVE MOTOR WATT X NO. OF POLES/RPM)
20052.48
-
9023.62
... More
MAKING COUPLING THE HT PUMP WITH THE DRIVE MOTOR BY INSERTING THE COUPLING PINS ETC,WITH CARE AND CAUTION AND COMPLETE AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT-DRIVE MOTOR WATTXNO OF POLE/RPM
20052.48
-
10026.24
... More
STATUTORY REQUISITE PRE-COMMISSIONING HIGH VOLTAGE TESTS OF THE HT MOTOR TO BE DONE BY ENGAGING THE EQUIPPED AUTHORIZED AGENCY OF DIRECTORATE OF ELECTRICITY,HAVING ALL RELEVANT CALIBRATED HIGH VOLTAGE TESTING SET WITH ITS ALLIED ACCESSORIES AND DO NEEDFUL FOR A NO-LOAD TRIAL RUN OF THE HT MOTOR AND HG TEST RESUILT TO BE FURNISHED TO THE EIC.
1
22500
22500
... More
MAKING HT CONNECTION OF THE MOTOR TERMINALS WITH ALL EXISTING CABLES CONNECTED WITH THE FEEDERBREKER/CAPACITOR,& LT CONNECTIONS AS EXISTS OF THE MOTOR SPACE HEATER AND EARTING TERMINALS.
1
4375
4375
... More
COMMISSIONING OF THE HT MOTOR WITH LOAD & DO NEEDFUL OBSERVATION UNDER TRIAL RUN TO ACHIEVE THE SATISFACTORY OPERATION OF THE HT MOTOR WITH LOAD AND COMPLETE IN ALLRESPECT WITH PROPER CARE AND CAUTION AS PER DIRECTION OF THE EIC(MODE OF MEASUREMENT-PER DAY BASIS)
1
7500
7500
... More
MAKING ALIGNMENT OF THE MOTOR WITH THE PUMP SHAFT BY USING DIAL GAUGE, INCLUDING INSERTION OF REQUISITE DIMENTIONED BRASS SHEETS ON THE SOLE PLATE WITH THE MAINTANANCE OF THE AIR-GAP & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
20052.48
1
36094.46
... More
SUPPLY FITTING & FIXING OF CARBON BRUSH WITH PIG TAIL (GRADE M16E) AS PER THE REQUIRED SIZE AND SHAPE OF THE EXISTING CARBON BRASS OF THE 6KV RATED MOTOR AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
18
2525
45450
... More
Sum of Basic Prices (Sl No-1 to 20)
-
-
-
... More
GST @ 18% on the Sum of Sl. No-21
1
83121
83121.23
... More
LWC @ 1% on the Sum of Sl. No.21 and 22
1
5449
5449.06