Kolkata Municipal Corporation Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Eprocure
Opening Date3 Apr 2025
Closing Date24 Apr 2025
Tender Amount₹ 4,93,335
Costs
EMD
₹ 10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Kmc/ Igwtp/365/24-25, Dt-22/03/2025
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KMC_832357_1Tender No
KMC/ IGWTP/365/24-25, DT-22/03/2025Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 8. M.S. works in brackets made from flats, angles, tees etc. to sizes specialy bent, twisted, forged; making holes drilled and fitted to rafter of trusses with necessary bolts, nuts, washer or screws etc. (length of straight not less than 230 mm) (To be used for repair works only)
3.5
7335
25672.5
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
241.5
38
9177
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 3. Cutting to requisite length or shape departmental R.S. joists,channels, angles, tees, plates etc. (Payment to be made on area of cut surface)
3600
8
28800
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (b) Continuous weld.
2200
9
19800
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
241.5
81
19561.5
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 6)Carpenter (Ordinary). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
10
296
2960
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 7)Carpenter (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
20
270
5400
... More
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
36
166
5976
... More
CHAPTER - VII MISCELLANEOUS ITEMS Coating of 'Epoxy' Resin of thickness not less than 160 micron with a lowviscosity,crystallization-resistant epoxy resin base with a reactive diluents combined with high build epoxy amine adducts as per BS 5493 standard and a polyamide or amido polyamine or any other suitable hardener. It shall react with epoxy resin at normal ambient temperature, suitable for solvent-free coatings as per recommended proportion for use on metal,concrete and wood surface to protect from corrosion as well as damagefrom chemical reaction after making the surface free from dust, oil and moisture etc. all complete as per instruction and to the satisfaction of ElC. [This item will be operated on prior permission from the concerned SE/Dy Chief Engineer]
16
449
7184
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
20
245
4900
... More
Sum of Basic Prices (Sl No-1 to12)
-
-
-
... More
GST @ 18% on the Sum of Sl. No-13
1
74509
74509.25
... More
LWC @ 1% on the Sum of Sl. No.- 13 & 14
1
4884
4884.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%