Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date24 Dec 2024
Closing Date8 Jan 2025
Tender Amount₹ 7,72,553 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.

5.37

119

640.03

... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.

1.07

77

83.22

... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

1.29

936

1205.96

... More
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018)

22.02

361

7949.22

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion

1.89

4572

8623.94

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion

5.51

4373

24100.42

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS  7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth

2.41

5575

13442.72

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor

5.81

5798

33700.88

... More
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(1).25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface). [Note: - Waterproofing as per item 9, polymer based paint as per item 8 (a) of subhead C of Section (C).

1.58

186

294.11

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS  16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.

74.14

724

53675.55

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.

43.23

335

14482.05

... More
ORDINARY CEMENT CONCRETE ( MIX  1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018)

9.99

6216

62069.87

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I. SAIL/ TATA/RINL. (10th Corrigenda & addenda dated 22.01.2020)

0.78

60580

47486.34

... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (c) 10 mm thick plaster

20.25

129

2612.25

... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster

50.4

161

8114.4

... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster

43.2

186

8035.2

... More
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(17)18 mm. to 22 mm. thick, kota stone slab set in 20 mm thick (avg) cement mortar (1:4) in floor, stair & lobby including pointing in cement slurry with admixture of pigment matching the stone shade, including grinding & polishing as per direction of Engineer - in - charge to match with the existing work. [Slurry for bedding @ 4.4 kg/Sq.m and pointing @2.0 kg/Sq.m](Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m

15.48

1016

15732.25

... More
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(20)Supplying, fitting and fixing 18 mm. to 22 mm. thick kota stone slab in wall, dado in 15 mm thick [avg] cement mortar (1:3) including making suitable arrangement to hold the stone properly by brass / copper hooks including pointing in cement mortar (1:2) (1 cement : 2 marble dust) with admixture of pigments matching the stone shade, including grinding and polishing all complete as per direction of Engineer-in-charge including cost of materials, labour, scaffolding, staging, curing complete. [Using cement slurry for bedding @4.4 kg/Sq.m and for jointing @1.8 kg/Sq.m](Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m

7.43

1154

8568.45

... More
BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall. With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m (i) Coloured decorative. Note: 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A. (i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m

117.51

749

88012.18

... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

22.8

34

775.2

... More
(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(4)Supplying, fitting and fixing Orissa pattern water closet in white glazed vitreous chinaware of approved make in position complete excluding 'P' or 'S' trap (excluding cost of concrete for fixing).(ii) 530 mm X 410 mm

10

1522

15220

... More
SECTION (A) - PLUMBING WORKS (A)-(IV) CISTERN, G.I.TANKS WITH PARTS Item No. (a) Original Works Supplying, fitting and fixing 10 litre porcelain low-down cistern of approved make without fittings and brackets.

10

1015

10150

... More
(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(11) Supplying,fitting and fixing 32 mm dia. Flush Pipe of approved make with necessary fixing materials and clamps complete.ii) C. P. Flush Pipe

10

295

2950

... More
SECTION(A) PLUMBINGWORKS (A)(V) BASIN AND SINKS WITH PARTS (a) Original Works 9 Supplying,fitting and fixing approved brand P.V.C. CONNECTOR white flexible, with both ends coupling with heavy brass C.P. nut, 15 mm dia. (v) 900 mm long

10

147

1470

... More
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(14)Supplying,fitting and fixing cast iron 'P' or 'S' trap conformimg to I.S. 3989/ 2009 and 1729/ 2002 including lead caulked joints and painting two coats to the exposed surface. (Painting to be paid seperately).(A) 'P' Trap.(iii) 100 mm.

20

948

18960

... More
BUILDING WORKS(M) DRAIN, DOWN PIPES, CHIMNEY ETC?.(C). ADDITIONAL RATE?(21)Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.A) UPVC Pipes:(ii) 110 mm. Dia.

40

251

10040

... More
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC. (a) Original Works 1.Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm(depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling, 15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L. and 20 mm.thick (1:4) plaster to bottom of the pit, providing necessary invert with cement concrete (1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6 mm thick cement plaster (1:4) in all external surfaces of the slab and one 560 mm dia. R.C.C. manhole cover of approved make supplied, fitted and fixed in the slab with necessary fittings, necessary earthwork in excavation in all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials.iii) Extra for each additional depth of 150 mm or part thereof beyond initial 600 mm depth.

20

1515

30300

... More
(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(7)Supplying, fitting and fixing Squating plate with integral flushing in white vitreous chinaware of approved make in cement concrete (6:3:1) with jhama chips complete. (Payment of concrete will be paid seperately). (i) 450 mm X 350 mm

2

881

1762

... More
(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(8)Supplying, fitting and fixing Half round channel with or without outlet as required set in cement concrete (6:3:1) with jhama chips complete. (Payment of concrete will be paid seperately).(ii) 600 mm X 150 mm.(b) White vitreous chinaware

10

579

5790

... More
BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 14. Supplying, fitting & fixing fibre reinforced polymer (FRP) Composite door shutters as per approved design with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) to satisfy IS:4020 door testing performance criteria. In ground floor (i) 32 mm thick. (For upper floors refer to item H(4) also)

20.25

2763

55950.75

... More
BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR WINDOW FRAME 3. Supplying, fitting and fixing fibre reinforced polymer (FRP) Composite door frame as per approved section with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) to safisfy IS: 4020 door testing performance criteria (i) 66mm x 90mm

40.95

497

20352.15

... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)

113.85

38

4326.3

... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS  2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)

93.6

81

7581.6

... More
BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 47. Supplying& laying 20 mm designer chequered tiles of any shade and of approved quality as per IS: 1237: 1980 laid in patterns as directed in pavement, footpath including necessary underlay 25 mm thick average cement mortar (1:3) complete in all respect with all labour and materials [using cement slurry @ 4.4 kg/Sq.m at back side of tiles. Cement of mortar &slurry will be supplied by the Department. Border concrete if necessary to be paid separately].

21.6

828

17884.8

... More
SECTION(A) PLUMBINGWORKS (A)(IV) CISTERN,G.I.TANKS WITH PARTS (a) Original Works 6 Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer a) 500 litre capacity

1

2584

2584

... More
SECTION(A) PLUMBINGWORKS (A)(IV) CISTERN,G.I.TANKS WITH PARTS (a) Original Works 6  Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer (b) 1000 litre capacity

1

5128

5128

... More
SECTION(A) PLUMBINGWORKS (A)(IV) CISTERN,G.I.TANKS WITH PARTS 9  (b) original work Hoisting G.I. tank (upto and including 1812 litre capacity).

2

144

288

... More
PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS (A)-(III) CPVC PIPE WORKS AND FITTINGS Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories,specials viz. socket,bend,tee,union,cross,elbo,nipple,longscrew, reducing socket,reducing tee, short piece etc.fitted with holder bats clamps, including cutting pipes,fitting, fixing etc.complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (b) For Concealed Work (i) CPVC Pipes Class-1,SDR-11(Dia) (a)15mm

26

140

3640

... More
PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS (A)-(III) CPVC PIPE WORKS AND FITTINGS Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories,specials viz. socket,bend,tee,union,cross,elbo,nipple,longscrew, reducing socket,reducing tee, short piece etc.fitted with holder bats clamps, including cutting pipes,fitting, fixing etc.complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (b) For Concealed Work (i) CPVC Pipes Class-1,SDR-11(Dia) (b)20mm

20

171

3420

... More
PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS (A)-(III) CPVC PIPE WORKS AND FITTINGS Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories,specials viz. socket,bend,tee,union,cross,elbo,nipple,longscrew, reducing socket,reducing tee, short piece etc.fitted with holder bats clamps, including cutting pipes,fitting, fixing etc.complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (b) For Concealed Work (i) CPVC Pipes Class-1,SDR-11(Dia) (c)25mm

18

235

4230

... More
(A)-(III) CPVC PIPE WORKS AND FITTINGS SECTION (A) - PLUMBING WORKS  2 Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 (B) Socket (Dia) (a) 15mm 2B-a

10

8

80

... More
(A)-(III) CPVC PIPE WORKS AND FITTINGS SECTION (A) - PLUMBING WORKS  2 Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 (B) Socket (Dia)  20mm

12

11

132

... More
(A)-(III) CPVC PIPE WORKS AND FITTINGS SECTION (A) - PLUMBING WORKS  2 Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 (B) Socket (Dia)  25mm

5

20

100

... More
(A)-(III) CPVC PIPE WORKS AND FITTINGS SECTION (A) - PLUMBING WORKS  2 Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 (c) Equal Tee (Dia)(a) 15 mm 2C-a

6

12

72

... More
(A)-(III) CPVC PIPE WORKS AND FITTINGS SECTION (A) - PLUMBING WORKS  2 Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 (c) Equal Tee (Dia)(a) 20 mm 2C-b

5

21

105

... More
(A)-(III) CPVC PIPE WORKS AND FITTINGS SECTION (A) - PLUMBING WORKS  2 Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007( D) Reducing Socket Size (a) 20mm X 15mm 2(D)-a

5

12

60

... More
(A)-(III) CPVC PIPE WORKS AND FITTINGS SECTION (A) - PLUMBING WORKS  2 Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007( D) Reducing Socket Size (b) 25 mm X20 mm 2(D)-b

4

17

68

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007(E) Reducing Elbow (a) 20mm X 15mm

3

16

48

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 (G)End Cap (Dia) (a) 15 mm

4

6

24

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 (I) Tank connecting nipple(Dia)  (a) 20mm

4

73

292

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007  ((K) Elbow (90...) (Dia) (a)15mm

12

10

120

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 (K) Elbow (90...) (Dia) (b)20mm

6

15

90

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 (K) Elbow (90...) (Dia) (c)25mm

4

29

116

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007(O) Reducing Tee Size (a) 15 mm x 15mm x20mm

8

32

256

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007(P) Pipe Clip (Dia) (a)15mm

22

5

110

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007(P) Pipe Clip (Dia) (b) 20mm

12

4

48

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007(P) Pipe Clip (Dia) (c)25mm

6

5

30

... More
Sub Total

-

-

-

... More
GST 18%

1

116680

116680

... More
CESS 1%

1

7649

7649.04



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.