Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date17 Dec 2024
Closing Date28 Dec 2024
Tender Amount₹ 2,99,120 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 5. Brick work with 1st class bricks in lime and surki mortar (1:2) (1 lime putty/paste: 2 surki) lime to be slaked at site and the mortar to be prepared with such lime putty and first class surki made from kiln burnt bricks having its fineness modulus between 2 and 2.5 and which passes through B.S. sieve No 8 with correspondes to I.S sieve No 200 with considerable grinding and pugging it complete. a) In foundation and plinth

0.51

5609

2860.59

... More
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(26)Supplying fitting and fixing 15 to 18 mm thick Marble slab/Tile in riser of step or skirting (upto 300 mm ht) over 15mm (avg) thick base of Cement mortar (1:2) laid with white cement slurry @ 4.4 kg/ Sq.m at back side of marble and jointed with white cement slurry @ 2.2 kg/ Sq.m with necessary pigments including grinding and Granite Polishing. [White cement and Pigment to be supplied by the Agency] (a) With Makrana plain pink / Adranga Pink / Garbh Gulabi / Udaypur Pink / Udaypur green / Black Bhalsana (i) Area of each Slab/tile upto 0.3 sq.m..Note:- Plain Polish may be accepted with approval of Engineer-in-charge with reduction Rs. 50/- per Sq.m for item 23, 24 and 26 of subhead A.(Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m

56.39

1591

89716.49

... More
BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (A) Floor With Sand Cement Mortar (1:4) 20 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m (i) Coloured decorative Note: 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A.(i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m (3rd Corrigenda & addenda dated 04.06.2018)

119.16

755

89965.8

... More
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(23)Extra cost of labour for prefinished and premoulded Nosing to treads of steps, railing, window sill etc. of Marble Stone.Note:- Plain Polish may be accepted with approval of Engineer-in-charge with reduction Rs. 50/- per Sq.m for item 23, 24 and 26 of subhead A.

64

258

16512

... More
BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR WINDOW FRAME 1. Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (f) Sishu, Gamar, Champ, Badam, Bhola, Mogra, Hallak Note: Extra for Lifting Charges for each additional floor, i) Rs. 200/- per Cu.m (upto 4th floor) ii) Rs.250/-(above 4th floor)

0.04

76096

2992.45

... More
BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 25. Supplying, Fitting & Fixing 30 mm thick Factory made moulded Door shutter, consisting of solid core single leaf flash door of 30 mm thickness lipped with 15mm [5mmx3] thick x 30 mm wide on one style and top rail and 10 mm [5mmx2] thick x 30 mm wide of the other style and bottom rail. The inner panel laminated with 2 mm thick termite proof water proof and fire resistant moulded PVC sheet with raised panel designed in different plain/ or Prelam colour on one side after routing the moulded design on flash door and 2mm plain and or Prelam PVC sheet on other side using rubber adhesive on flash door and solvent cement adhesive on the PVC lipping etc. complete excluding hardwares as necessary as per direction of Engineer-in Charge, Manufacturer?s Specification and drawing.. In ground floor (b) Moulded door using 2 mm Prelam moulded PVC sheet on both side.(For upper floors refer to item H(4) also)

2.09

3636

7599.24

... More
SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 15 Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. In Ground floor: iii) Two coats.

88.56

49

4339.44

... More
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 7. Supplying, fitting and fixing bib cock or stop cock. (a) (i) Chromium plated Bib Cock short body (Equivalent to Code No. 511 & Model - Tropical / Sumthing Special of ESSCO or similar brand).

22

539

11858

... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 22. Supplying, fitting and fixing Stainless Steel railing consist of 38mm dia and 900mm height vertical balustrade at every two alternative steps, 50mm dia top rail, 3 (three) nos 19mm dia horizontal Strainless steel pipe and base/cover plate with Strainless Steel GRADE 304 containing 7.5% nickle (Interior Grade) Brushed/Mat finish, complete as per direction of the Engineer-in-charge.Weight of Strainless Steel railing per metre 6.5 Kg (approx)

2.4

5974

14337.6

... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25%for each addl. floor above 4th floor) (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. (MODE OF MEASUREMENT):-The weight of grill per sq.m. will be determined by taking thephysical weight of fabricated grill and dividing the same by covered area of the same. N.B. No shop priming will be allowed to facilitate inspection of workmanship. Weight of grill is to be taken after final grinding and finishing the weld.

0.38

7238

2750.44

... More
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

2.74

166

454.84

... More
Estimated amount

-

-

-

... More
Add: 9%SGST

1

13091

22588.32

... More
Add: 9%CGST

1

13091

22588.32

... More
1% LWC

1

2443

2961.58



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.