Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 48,85,779 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

3

34

102

... More
Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post work

0.68

79

54.33

... More
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.

2794

24

67056

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion

139.92

4373

611870.16

... More
PWD ( BLDG )_12_TH_CORRIGENDA_ADDENDA_16 _ DT_14-10-2020_PAGE 2, SL.NO(2)(B) SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF INTERLOCKING CONCRETE BLOCK PAVEMENTS (ICBP) WITH CONCRETE BLOCKS (WITH CONCRETE GRADE AS SPECIFIED AS PER TABLE I OF IS 15658 : 2006) MANUFACTURED FROM BIS LICENSEE MANUFACTURE, WITH SPACER NIB (SMALL PROTRUDING PROFILES ON THE VERTICAL FACE OF A PAVER BLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP IN BETWEEN THE PAVING BLOCKS, AS PER CI. NO. 3.26 OF IS: 15658)AND OF SPECIFIED SIZE AND SHAPE WITH ASPECT RATIO(THE RATIO OF LENGTH TO THICKNESS OF A PAVER BLOCK, AS PER STRENGTH/BREAKING LOAD AS PER ANNEXURE G OF IS:15658, ON THE PREPARED BASE COURSE OF SPECIFIED CBR AS PER TABLE 1 OF IRC SP63(20018) OR ELSE AS MENTIONED IN DESIGN AND DRAWING WITH A CUSHION OF COMPACTED BEDDING SAND OF 25 -35MM THICK (GRADING OF THE BEDDING SAND AS PER CLAUSE 6.5.1 OF IRC SP 63) AND FILLING UP THE GAPS IN BETWEEN PAVER BLOCKS WITH JOINT FILLING SAND ( THE GRADING OF THE JOINT FILLING SAND WILL BE AS PER CLAUSE 6.5.2 OF IRC SP63) AND COMPLETING THE EDGES WITH CUT BLOCKS AS PER CL.NO. 8.7 OF IRC SP63(2018) WITH PROPER CONFINEMENT OF BEDDING AND JOINT FILLING SAND, COMPACTION LEVELING AND FILLING UP OF THE EDGE GAP. 50MM THICK, (II) COLORED DECORATIVE.

3576

875

3129000

... More
Taking out stone slab of kerb & channel of road side drain and stacking as directed.a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303])

10

8

81.7

... More
Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303])

10

8

81.7

... More
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).a) Vertical Kerb ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])

5

21

107.15

... More
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])

5

18

91.5

... More
Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 300mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017,  p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 ,    p-191 (i -6)and 3rd Corr. & Adda, page-52,   PWD-2018(R & B)  p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )

10

265

2655.4

... More
Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017,  p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 ,    p-191 (i -6)and 3rd Corr. & Adda, page-52,   PWD-2018(R & B)  p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )

10

214

2146.3

... More
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(i) For Construction of Sub Base by consolidating Jhama metal  / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & page-222 sl. No- 1 & 5 (e))

0.08

2596

207.75

... More
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.

1

1956

1956

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36.Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(f) 25 mm to 30 mm shuttering without staging in foundation.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.

6

209

1254

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.II. Other than SAIL/ TATA/RINL

0.01

55776

557.76

... More
ORDINARY CEMENT CONCRETE ( MIX  1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES

1

5498

5498

... More
MATERIALS AND LABOUR  1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.

200

245

49000

... More
Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete

1270

124

157480

... More
LOADING, UNLOADING AND STACKING BY MANUAL MEANS

76.2

62

4724.4

... More
CARRIAGE

76.2

124

9448.8

... More
Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 ,    p-191 (i -6)and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13))

20

1758

35178

... More
Sub Total

-

-

-

... More
GST 18%

1

737709

737709.02

... More
CESS 1%

1

48374

48374.05



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.