Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Aug 2024
Closing Date12 Aug 2024
Tender Amount₹ 4,00,169
Costs
EMD
₹ 8,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_727005_1Bid Award Id
ViewTender No
KMC/ASPH/PB/SJ.M-03/24-25Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supplying and laying factory made vertical kerb stone of cement
concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 300mm
X 150mm tapered at top, making joints with cement mortar (1:4)
incldg cost of all materials and labours but excluding the cost of under
bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current
SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3
and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 ,
p-191 (i -6)
and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it
-18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2
pg-226, )
63
16729
265.54
Box cutting or filling in Road embankment in all sorts of soil including
spreading the spoils properly over the flank as necessary or on berm
to approximate grade & camber and rolling the sub-grade with power
roller to proper camber and grade as per direction and satisfaction of
Engineer-in-charge including uprooting and removing plants and
jungles when and where necessary.
(a) Depth up to 150 mm. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16
Page No.240)
14.18
204
14.4
Water Bound Macadam Sub Base by consolidating Jhama metal /
Laterite chelly or stone metal / shingles of specific size in hard crust
to requisite thickness (measured after compaction) in layers including
screening of metals etc. as necessary, hand packing, sweeping,
watering and rolling in stages with power roller to proper line, grade
and camber, lighting, guarding & barricading and making necessary
earthen bundh of one metre width on each side where necessary to
protect edges and preparing the bed by necessary cutting or filling
and rolling all complete including the cost of all materials and hire and
labour charges of all men and machineries and compacting to the
required density, as per Clause 404 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal /
Laterite (63 mm to 45 mm) (Moorum replaced with course sand)
34.39
89298
2596.83
Raising manhole cover and frame with CBW (1:4), 375 mm thick up
to 100mm high with 20mm thick sand and cement plaster including
finishing with neat cement after cutting the asphaltum pavement and
taking out and re-fixing the existing manhole cover and frame with
cement concrete (1:1.5:3) with stone chips all round the frame
surface including removal of surplus spoils. ( Ref :Rate based on
PWD Current SOR,
4
12180
3045.14
Lowering manhole cover and frame with CBW (1:4), 375 mm thick up
to 100mm high with 20mm thick sand and cement plaster including
finishing with neat cement after cutting the asphaltum pavement and
taking out and re-fixing the existing manhole cover and frame with
cement concrete (1:1.5:3) with stone chips all round the frame
surface including removal of surplus spoils. ( Ref :Rate based on
PWD Current SOR,
27
78512
2907.87
(23)Supplying, fitting and fixing in positing reinforced cement polymer
concrete manhole /gully pit cover with matching frame as per I.S.
12592 (m.D.) ii) 25 mT load bearing capacity round manhole cover
provided with two lifter hooks fitted with matching frame of size Cover
: 680 mm. X 90 mm. Frame : 800 mm. X 165 mm. Opening : 500 mm.
Weight : 196 Kg. (approx.)
9
30438
3382
Raising gully pit cover and frame with CBW (1:4), 250 mm thick up to
100mm high with 20mm thick sand and cement plaster with neat
cement after dismantiling the existing setting and taking out and
refixing the existing cover and frame with cement concrete (1:1.5:3)
with stone chips all round the frame surface including removal of
surplus spoils. ( Ref :Rate based on PWD Current SOR,
PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a),
p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226,
PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date
04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60,
sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018,
p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria &
Adda, Page-4, Date 08.01.2018, page-12 (item -13))
13
24131
1856.28
(23)Supplying, fitting and fixing in positing reinforced cement polymer
concrete manhole /gully pit cover with matching frame as per I.S.
12592 (m.D.)x) 5 mT load bearing capacity gully pit cover with frame
and hinge arrangement for opening of size Cover : 470 mm. X 420
mm. X 80 mm. Frame : 590 mm. X 550 mm. X 170 mm. Opening :
380 mm. X 305 mm. Weight : 100 Kg. (approx.)
6
12006
2001
(b) Priming one coat on timber or plastered surface with synthetic oil
bound primer of approved quality including smoothening surfaces bysand papering etc. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No. 200
9.83
373
38
Painting with best quality synthetic enamel paint of approved make
and brand including smoothening surface by sand papering etc.
including using of approved putty etc. on the surface, if necessary :
(a) On timber or plastered surface :
(ii) Two coats (white in shade) ( Ref :PWD (Bldg.)-2017, It. No. 2,
Page No. 200)
4.91
383
78
Painting with best quality synthetic enamel paint of approved make
and brand including smoothening surface by sand papering etc.
including using of approved putty etc. on the surface, if necessary :
(a) On timber or plastered surface :
(iv) Two coats (with any shade except white) ( Ref :PWD
(Bldg.)-2017, It. No. 2, Page No. 200)
4.91
398
81
Removal of rubbish,earth etc. from the working site and disposal of
the same beyond the compound, in conformity with the Municipal /
Corporation Rules for such disposal, loading into truck and cleaning
the site in all respect as per direction of Engineer in charge. ( Ref
:PWD (Bldg.)-2017, It. No. 13, Page No.12)
79.67
13225
166
LABOUR FOR PREPARATION OF SURFACE BY SCRAPING
CLEANING & BRSHING SPREADING HOT MIX INCLUDING
LABOUR FOR LAYING TACK COAT (EMULSION BITUMEN WILL
BE SUPPLIED BY DEPTT.) AND ALSO COMPACTION OF HOT
MIX.
1040
16151
15.53
Sub Total
-
-
-
GST 18%
1
60438
60438
CESS 1%
1
3962
3962.07
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements