Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Road Construction
Eprocure
Opening Date8 Jan 2025
Closing Soon15 Jan 2025
Tender Amount₹ 4,72,412
Costs
EMD
₹ 10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KMC_796631_1Tender No
KMC/ASPH/GG/SM-22/24-25Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cement concrete with graded jhama khoa (30 mm size) excluding
shuttering In ground floor and foundation.
(a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 &
3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10)
7.31
4761
34814.81
... More
Resetting of Stone Slabs of kerb & channel of road side drain to
correct line and level including cement pointing (1:2).
b) flat channel stone. ( Ref :Rate based on PWD Current SOR.
[PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])
380
18
6954
... More
Supplying and laying factory made flat channel stone of cement
concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm
X 100 mm; making joints with cement mortar (1:4) incldg cost of all
materials and labours but excluding the cost of under bed (for
road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B)
2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II ,
Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it
-18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2
pg-226, )
180
214
38633.4
... More
Supplying and laying factory made Vertical Kerb Stone of cement
concrete M-20 (1:1.5:3) machanicaly vibrated, size 500mm X 450mm
X 150mm tapered at top, making joints with cement mortar (1:4)
incldg cost of all materials and labours but excluding the cost of under
bed (Forr Road-Diveder) ( Ref :Rate based on PWD Current SOR
[PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and
Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 ,
p-191 (i -6)
and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it
-18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2
pg-226, )
180
363
65446.2
... More
Water Bound Macadam Sub Base by consolidating Jhama metal /
Laterite chelly or stone metal / shingles of specific size in hard crust
to requisite thickness (measured after compaction) in layers including
screening of metals etc. as necessary, hand packing, sweeping,
watering and rolling in stages with power roller to proper line, grade
and camber, lighting, guarding & barricading and making necessary
earthen bundh of one metre width on each side where necessary to
protect edges and preparing the bed by necessary cutting or filling
and rolling all complete including the cost of all materials and hire and
labour charges of all men and machineries and compacting to the
required density, as per Clause 404 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal /
Laterite (63 mm to 45 mm) (Moorum replaced with course sand)
( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 &
page-222 sl. No- 1 & 5 (e))
49.88
2596
129516.9
... More
Raising manhole cover and frame with CBW (1:4), 375 mm thick up
to 100mm high with 20mm thick sand and cement plaster including
finishing with neat cement after cutting the asphaltum pavement and
taking out and re-fixing the existing manhole cover and frame with
cement concrete (1:1.5:3) with stone chips all round the frame
surface including removal of surplus spoils. ( Ref :Rate based on
PWD Current SOR,
PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a),
p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226,
PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date
04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60,
sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018,
p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria &
Adda, Page-4, Date 08.01.2018, page-12 (item -13))
9
3045
27406.26
... More
Lowering manhole cover and frame with CBW (1:4), 375 mm thick up
to 100mm high with 20mm thick sand and cement plaster including
finishing with neat cement after cutting the asphaltum pavement and
taking out and re-fixing the existing manhole cover and frame with
cement concrete (1:1.5:3) with stone chips all round the frame
surface including removal of surplus spoils. ( Ref :Rate based on
PWD Current SOR,
PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a),
p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226,
PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date
04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60,
sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018,
p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria &
Adda, Page-4, Date 08.01.2018, page-12 (item -13))
5
2907
14539.35
... More
(23)Supplying, fitting and fixing in positing reinforced cement polymer
concrete manhole /gully pit cover with matching frame as per I.S.
12592 (m.D.) ii) 25 mT load bearing capacity round manhole cover
provided with two lifter hooks fitted with matching frame of size Cover
: 680 mm. X 90 mm. Frame : 800 mm. X 165 mm. Opening : 500 mm.
Weight : 196 Kg. (approx.)
3
3382
10146
... More
Raising gully pit cover and frame with CBW (1:4), 250 mm thick up to
100mm high with 20mm thick sand and cement plaster with neat
cement after dismantiling the existing setting and taking out and
refixing the existing cover and frame with cement concrete (1:1.5:3)
with stone chips all round the frame surface including removal of
surplus spoils. ( Ref :Rate based on PWD Current SOR,
PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a),
p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226,
PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date
04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60,
sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018,
p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria &
Adda, Page-4, Date 08.01.2018, page-12 (item -13))
9
1856
16706.52
... More
(23)Supplying, fitting and fixing in positing reinforced cement polymer
concrete manhole /gully pit cover with matching frame as per I.S.
12592 (m.D.)x) 5 mT load bearing capacity gully pit cover with frame
and hinge arrangement for opening of size Cover : 470 mm. X 420
mm. X 80 mm. Frame : 590 mm. X 550 mm. X 170 mm. Opening :
380 mm. X 305 mm. Weight : 100 Kg. (approx.)
3
2001
6003
... More
(b) Priming one coat on timber or plastered surface with synthetic oil
bound primer of approved quality including smoothening surfaces by
sand papering etc. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No. 200
121.6
38
4620.8
... More
Painting with best quality synthetic enamel paint of approved make
and brand including smoothening surface by sand papering etc.
including using of approved putty etc. on the surface, if necessary :
(a) On timber or plastered surface :
(ii) Two coats (white in shade) ( Ref :PWD (Bldg.)-2017, It. No. 2, Page No. 200)
121.6
78
9484.8
... More
MAZDOOR MAN /WOMAN FOR LABOUR FOR PREPARATION OF
SURFACE BY SCRAPING, CLEANING & BRUSHING SPREADING
HOT MIX INCLUDING LABOUR FOR LAYING TACK COAT
(EMULSION BITUMEN WILL BE SUPPLIED BY DEPTT.) AND ALSO
COMPACTION OF HOT MIX.
45
421
18949.05
... More
Sub Total
-
-
-
... More
GST 18%
1
71349
71349
... More
CESS 1%
1
4677
4677.33
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%