Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Construction Material
Eprocure
Opening Date9 Sep 2022
Closing Date17 Sep 2022
Tender Amount₹ 3,54,285
Costs
EMD
₹ 7,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_KMC_403406_1Tender No
KMC/EE(C)/VIII/90/12/22-23/RTender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.
1.62
-
335
... More
ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES
6.28
-
5498
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor
1.1
-
5798
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.II. Other than SAIL/ TATA/RINL
0.14
-
55776
... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster
9.35
-
161
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) ((ii) Grill weighing above 16 Kg./sq.mtr and above. (MODE OF MEASUREMENT):-The weight of grill per sq.m. will be determined by taking the physical weight of fabricated grill and dividing the same by covered area of the same. N.B. No shop priming will be allowed to facilitate inspection of workmanship. Weight of grill is to be taken after final grinding and finishing the weld.
1.68
-
7046
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
9.9
-
29
... More
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
9.9
-
79
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
9.35
-
38
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :With super gloss (hi-gloss) -(ii) Two coats (white in shade)
4.68
-
78
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
4.68
-
81
... More
SUPPLYING FIBRE GLASS RELIEF WORK OF ARTISTIC NATURE (TWO DIMENSIONAL MURAL WORK OR THREE DIMENSIONAL MODEL) INCLUDING ALL MATERIALS LIKE FIBRE GLASS, IRON OR METAL FRAME INSIDE FIBRE GLASS FOR RIGIDITY, APPLYING N.C. COAT PAINT, ETC COMPLETE AND FIXING THE SAME TO WALL OR ON GROUND/OTHER BASE INCLUDING GROUTING WITH CEMENT CONCRETE WORK COMPLETE IN ALL RESPECTS AS PER DIRECTION OF EIC (THE RATE IS EXCLUDING GST & 1% L.W. CESS)
10.5
-
10399.84
... More
BUILDING WORKS (D) FLOORING A. ORIGINAL WORKS 48. SUPPLYING & LAYING AS PER IRC-SP:063-2004 PAVER UNIT OF ANY SHADE OF APPROVED QUALITY AS PER RELEVANT IS CODE, LAID IN PATTERN AS DIRECTED IN PAVEMENT, FOOTPATH, DRIVEWAY (PAVER BLOCK ONLY), ETC INCLUDING NECESSARY UNDERLAY COMPLETE IN ALL RESPECT WITH ALL LABOUR AND MATERIAL. [BORDER CONCRETE IF NECESSARY TO BE PAID SEPARATELY]. NOTE: SUB-GRADE CBR SHOULD NOT BE LESS THAN 5. (B) 50 MM THICK INTERLOCKING DESIGNER CONCRETE PAVER BLOCK M- 30 GRADE FOR NON-TRAFFIC ZONE,BUIDING PREMISES,GARDEN,PARKS,DOME STIC DRIVE AS PER IS: 15658- 2006(OVER 20-30 MM MEDIUM SAND BED ON 200MM THK BOUND GNAULAR /GRANULAR BASE COURSE INCLUDING COST OF SAND FOR SAND BED BUT EXCLUDING COST OF BASE COURSE & SUBGRADE PREPARATION.) (II) COLOURED DECORATIVE
125.55
-
875
... More
Estimated amount
-
-
-
... More
Add: 9%SGST
1
-
13091.41
... More
Add: 9%CGST
1
-
13091.41
... More
1% LWC
1
-
2443.73
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements