Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Machinery and Tools
Eprocure
Opening Date14 Jun 2024
Closing Date5 Jul 2024
Tender Amount₹ 9,76,468
Costs
EMD
₹ 20,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_694076_1Bid Award Id
ViewTender No
KMC/IGWTP/003/24-25Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
TAKING OUT OF THE SHAFT-IMPELLER ASSEMBLY FROM THE BOTTOM VOLUTE OF THE HT PUMP AND KEPT ON THE PEDESTAL WITH CARE & CAUTION & COMPLETE AS PER DIRECTION OF EIC(MODE OF MEASUREMENT -WEIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING.)
1500
12750
8.5
... More
TO & FRO TRANSPORTATION OF COMPLETE SHAFT IMPELLER ASSEMBLEY FROM PUMP-HOUSE WORK SITE TO THE CONTRACTOR'S WORKSHOP AND VICE- VERSA INCLUDING LOADING AND UNLOADING WITH PROPER CARE AS PER DIRECTION OF EIC(MODE OF MEASUREMENT- WEIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING )
1350
12825
9.5
... More
REMOVAL OF HALF COUPLING USING THE HYDRAULIC PULLER & FIXTURES ETC VERY CAUTIOUSLY FROM THE SHAFT AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC(MODE OF MEASUREMENT -DRIVE MOTOR WATT X NO OF POLES/RPM) )
14298.34
7864
0.55
... More
TAKING OUT THE BEARINGS (HAVING ID-75MM TO 200MM) WITH PROPER CARE & CAUTION BY PROVIDING ALL RELEVANT TOOLS & FIXTURES AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC(MODE OF MEASUREMENT-{NO. OF BEARING [THICKNESS OF BEARING MULTIPLIED BY SUM OF ID & OD OF THE BEARING]}).
594
29700
50
... More
REMOVAL OF SLEEVE BUSHES/ STUFFING BOX BUSH /JAM NUTS ETC FROM THE SHAFT WITH REQUIRED ARRENGEMENT ETC COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC(MODE OF MEASUREMENT -WEIGHT OF SLEEVES/ JAMNUTS/ STUFFING BOX BUSH ETC WITH SHAFT.)
460
16560
36
... More
PREPARATION OF SURFACE FOR METAL DEPOSITION/MACHINEABLE ELECTRODE ON THE PITTED/WORN OUT PORTION OF THE IMPELLER BY SUITABLE METHOD ETC. COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC .(MODE OF MEASUREMENT - DIAMETER OF THE IMPELLER IN METER X DISTANCE BETWEEN THE IMPELLER EYE IN METER X NOS OF VANES,TO BE CONSIDERED X MAXIMUM DEPTH IN MM OF THE ERODED PORTION OF THE IMPELLER SURFACE)
16.2
15795
975
... More
SURFACE DEVELOPMENT BY METAL(MOC- GM) DEPOSITION/ MACHINEABLE ELECTRODE ON THE PITTED/ERODED PORTION OF THE CONVEX SIDE AND LEADING EDGES OF ALL VANES OF IMPELLER SURFACE ( SAME MATERIAL TO BE USED FOR METAL DEPOSITION AS PER EXISTING IMPELLER) WITH COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT - (DIAMETER OF THE IMPELLER) X( DISTANCE BETWEEN THE IMPELLER EYE IN METER) X (NO OF VANES) X (MAXIMUM DEPTH IN MM OF THE ERODED PORTION OF THE IMPELLER SURFACE), TO BE CONSIDERED.
16.2
54270
3350
... More
MANUFACTURING,FITTING & FIXING OF SLEEVE BUSH(MOC-GUN METAL-CU-85%, ZN- 4 TO 6%, SN- 4 TO 6%) AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
128
289920
2265
... More
MANUFACTURING,FITTING & FIXING OF JAM NUT(MOC-SS 304) AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
6
7650
1275
... More
MANUFACTURING,FITTING & FIXING OF COUPLING PIN BUSH (MOC- NEOPRENE RUBBER MOULDED HAVING GUN METAL LINER ON INNER SIDE) AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
25.6
65280
2550
... More
FITTING & FIXING OF THE SLEEVE /JAM NUTS/ STUFFING BOX BUSH/ WEARING RING BY HYDRAULIC JACK & SPECILIZED FIXTURES ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT - WEIGHT OF THE SLEEVES/ JAM NUTS/ STUFFING BOX BUSH/WEARING RING WITH THE SHAFT.
326
7172
22
... More
REMOVAL OF IMPELLER USING REQUIRED HYDRAULIC PULLER & FIXTURES ETC VERY CAUTIOUSLY WITHOUT ANY DAMAGED EITHER TO THE SHAFT SURFACE OR TO THE KEY ETC WITH REQUIRED ARRANGEMENT ETC COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT- WEIGHT OFTHE IMPELLER WITH SHAFT).
1065
40470
38
... More
FITTING & FIXING OF THE IMPELLER BY HYDRAULIC JACK & SPECILIZED FIXTURES ETC & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC ( MODE OF MEASUREMENT- WEIGHT OF THE SHAFT-IMPELLER ASSEMBLY).
1065
28755
27
... More
FITTING FIXING OF THE BALL/ROLLER BEARING(HAVING ID-75 MM TO 200 MM)BY APPLYING THE METHOD OF EXPANSION OF INNER RACE IN HOT OIL DIPPING OR OTHER SUITABLE METHOD OF EXPANSION WITH PROPER CARE AND CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.[MODE OF MEASUREMENT(NO OF BEARING*THICKNESS OF THE BEARING MULTIPLIED BY SUM OF ID & OD OF THE BEARINGS)]
594
50490
85
... More
FITTING & FIXING OF THE HALF COUPLING BY HYDRAULIC JACK & SPECILIZED FIXTURES ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT - DRIVE MOTOR WATT*NO OF POLES/RPM)
14298.34
7149
0.5
... More
TRUENESS AND ECCENTRICITY CHECKING OF THE SHAFT IMPELLER ASSEMBLY, TRUENESS CHECKING OF THE COUPLING AND DYNAMIC BALANCING THE COMPLETE ASSEMBLY BY ADDING OR REMOVING THE UNBALANCED MASS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. THE BALANCING CERTIFICATE MUST BE FURNISHED TO THE DEPARTMENT. (MODE OF MEASUREMENT- WEIGHT ROTATING ASSEMBLY)
1065
28755
27
... More
POSITIONING ,FITTING &,FIXING THE COMPLETE ROTATING ASSEMBLY ON THE PUMP BOTTOM VOLUTE WITH ALL SEQUENTIAL PROCEEDINGS AND KEEPING UTMOST CARE & CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASURMENT-WEIGHT OF IMPELLER,SHAFT,JAM NUT & HALF COUPLING)
1500
37500
25
... More
MAKING ALIGNMENT OF THE SHAFTS OF PUMP & MOTOR BY USING DIAL GAUGE ETC, INCLUDING INSERTION OF REQUISITE DIMENTIONED BRASS SHEETS & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT-DRIVE MOTOR WATT*NO OF POLES/RPM)
14298.34
32171
2.25
... More
SEQUENTIAL INSERTION OF PACKING {PTFE HYDRAULIC PACKING- STYLE-374 (SIZE-15.5 TO 25 MM)} AT BOTH END (DE & NDE SIDES) & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC ( MODE OF MEASUREMENT- INSERTED PACKING LENGHT IN M X NO OF TURNS).
8.4
28140
3350
... More
MAKING COUPLING OF THE HT PUMP WITH THE DRIVE MOTOR BY INSERTING THE COUPLING PINS ETC WITH CARE & CAUTION & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASURMENT-DRIVE MOTOR WATT*NO OF POLES/RPM)
14298.34
7149
0.5
... More
COMMISSIONING THE HT PUMP WITH THE DRIVE MOTOR WITH SEQUENTIAL PROCESS WITH PROPER CARE & CAUTION & DO NEEDFUL OBSERVATION FOR TRIAL RUN TO ACHIEVE THE SATISFACTORY OPERATION OF THE PUMP & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC(MODE OF MEASURMENT-PER DAY BASIS)
1
7500
7500
... More
Sum of Basic Prices (Sl No-1 to 23)
-
-
-
... More
GST @ 18% on the Sum of Sl. No-24
1
147477
147477.97
... More
LWC @ 1% on the Sum of Sl. No.- 24 & 25
1
9668
9668
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements