Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Machinery and Tools
Eprocure
Opening Date25 Oct 2024
Closing Date14 Nov 2024
Tender Amount₹ 9,76,468 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
TAKING OUT OF THE SHAFT-IMPELLER ASSEMBLY FROM THE BOTTOM VOLUTE OF THE HT PUMP AND KEPT ON THE PEDESTAL WITH CARE & CAUTION &  COMPLETE AS PER DIRECTION OF  EIC(MODE OF MEASUREMENT -WEIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING.)

1500

8

12750

... More
TO & FRO TRANSPORTATION OF COMPLETE SHAFT IMPELLER ASSEMBLEY FROM PUMP-HOUSE WORK SITE TO THE CONTRACTOR'S WORKSHOP AND VICE- VERSA INCLUDING LOADING AND UNLOADING WITH PROPER CARE AS PER DIRECTION OF EIC(MODE OF MEASUREMENT- WEIGHT OF  IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING )

1350

9

12825

... More
REMOVAL OF HALF COUPLING USING THE HYDRAULIC PULLER & FIXTURES ETC VERY CAUTIOUSLY FROM THE SHAFT AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC(MODE OF MEASUREMENT -DRIVE MOTOR WATT X NO OF POLES/RPM) )

14298.34

-

7864.09

... More
TAKING OUT THE BEARINGS (HAVING ID-75MM TO 200MM) WITH PROPER CARE & CAUTION BY  PROVIDING ALL RELEVANT TOOLS & FIXTURES AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC(MODE OF MEASUREMENT-{NO. OF BEARING [THICKNESS OF BEARING MULTIPLIED BY SUM OF ID & OD OF THE BEARING]}).

594

50

29700

... More
REMOVAL OF SLEEVE BUSHES/ STUFFING BOX BUSH /JAM NUTS ETC FROM THE SHAFT WITH REQUIRED ARRENGEMENT ETC  COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC(MODE OF MEASUREMENT -WEIGHT OF SLEEVES/ JAMNUTS/ STUFFING BOX BUSH ETC WITH SHAFT.)

460

36

16560

... More
PREPARATION OF SURFACE FOR METAL DEPOSITION/MACHINEABLE ELECTRODE ON THE PITTED/WORN OUT PORTION OF THE IMPELLER BY SUITABLE METHOD  ETC. COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC .(MODE OF MEASUREMENT - DIAMETER OF THE IMPELLER IN METER X DISTANCE BETWEEN THE IMPELLER EYE IN METER X NOS  OF VANES,TO BE CONSIDERED X MAXIMUM DEPTH IN MM OF THE ERODED PORTION OF THE IMPELLER SURFACE)

16.2

975

15795

... More
SURFACE DEVELOPMENT BY METAL(MOC- GM) DEPOSITION/ MACHINEABLE ELECTRODE ON THE  PITTED/ERODED PORTION OF THE CONVEX SIDE AND LEADING EDGES OF ALL VANES OF IMPELLER SURFACE ( SAME MATERIAL TO BE USED FOR METAL DEPOSITION AS PER EXISTING IMPELLER) WITH COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT - (DIAMETER OF THE IMPELLER) X( DISTANCE BETWEEN THE IMPELLER EYE IN METER) X (NO OF VANES) X (MAXIMUM DEPTH IN MM OF THE ERODED PORTION OF THE IMPELLER SURFACE), TO BE CONSIDERED.

16.2

3350

54270

... More
MANUFACTURING,FITTING & FIXING OF SLEEVE BUSH(MOC-GUN METAL-CU-85%, ZN- 4 TO 6%, SN- 4 TO 6%) AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.

128

2265

289920

... More
MANUFACTURING,FITTING & FIXING OF JAM NUT(MOC-SS 304) AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.

6

1275

7650

... More
MANUFACTURING,FITTING & FIXING OF COUPLING PIN BUSH (MOC- NEOPRENE RUBBER MOULDED HAVING GUN METAL LINER ON INNER SIDE) AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.

25.6

2550

65280

... More
FITTING & FIXING OF THE SLEEVE /JAM NUTS/ STUFFING BOX BUSH/ WEARING RING BY HYDRAULIC JACK & SPECILIZED FIXTURES ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT - WEIGHT OF THE SLEEVES/ JAM NUTS/ STUFFING BOX BUSH/WEARING RING WITH THE SHAFT.

326

22

7172

... More
REMOVAL OF IMPELLER USING REQUIRED HYDRAULIC PULLER & FIXTURES ETC VERY CAUTIOUSLY WITHOUT ANY DAMAGED EITHER TO THE SHAFT SURFACE OR TO THE KEY ETC WITH REQUIRED ARRANGEMENT ETC COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT- WEIGHT OFTHE IMPELLER WITH SHAFT).

1065

38

40470

... More
FITTING & FIXING OF THE IMPELLER BY HYDRAULIC JACK & SPECILIZED FIXTURES ETC & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC ( MODE OF MEASUREMENT- WEIGHT OF THE SHAFT-IMPELLER ASSEMBLY).

1065

27

28755

... More
FITTING FIXING OF THE BALL/ROLLER BEARING(HAVING ID-75 MM TO 200 MM)BY APPLYING THE METHOD OF EXPANSION OF INNER RACE IN HOT OIL DIPPING OR OTHER SUITABLE METHOD OF EXPANSION WITH PROPER CARE AND CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.[MODE OF MEASUREMENT(NO OF BEARING*THICKNESS OF THE BEARING MULTIPLIED BY SUM OF ID & OD OF THE BEARINGS)]

594

85

50490

... More
FITTING & FIXING OF THE  HALF COUPLING BY HYDRAULIC JACK & SPECILIZED FIXTURES ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT - DRIVE MOTOR WATT*NO OF POLES/RPM)

14298.34

-

7149.17

... More
TRUENESS  AND ECCENTRICITY CHECKING OF THE SHAFT IMPELLER ASSEMBLY, TRUENESS CHECKING OF THE COUPLING AND DYNAMIC BALANCING THE COMPLETE ASSEMBLY  BY ADDING OR REMOVING THE UNBALANCED MASS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. THE BALANCING CERTIFICATE MUST BE FURNISHED TO THE DEPARTMENT.  (MODE OF MEASUREMENT- WEIGHT  ROTATING ASSEMBLY)

1065

27

28755

... More
POSITIONING ,FITTING &,FIXING THE COMPLETE ROTATING ASSEMBLY ON THE PUMP BOTTOM VOLUTE WITH ALL SEQUENTIAL PROCEEDINGS AND KEEPING UTMOST CARE & CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASURMENT-WEIGHT OF IMPELLER,SHAFT,JAM NUT & HALF COUPLING)

1500

25

37500

... More
MAKING ALIGNMENT OF THE SHAFTS OF PUMP & MOTOR BY USING DIAL GAUGE ETC,  INCLUDING   INSERTION OF REQUISITE DIMENTIONED BRASS SHEETS & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.  (MODE OF MEASUREMENT-DRIVE MOTOR WATT*NO OF POLES/RPM)

14298.34

2

32171.27

... More
SEQUENTIAL INSERTION OF PACKING {PTFE HYDRAULIC PACKING- STYLE-374 (SIZE-15.5 TO 25 MM)} AT BOTH END (DE & NDE SIDES) & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC ( MODE OF MEASUREMENT- INSERTED PACKING LENGHT IN M X NO OF TURNS).

8.4

3350

28140

... More
MAKING COUPLING OF THE HT PUMP WITH THE DRIVE MOTOR BY INSERTING THE COUPLING PINS ETC WITH CARE & CAUTION & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASURMENT-DRIVE MOTOR WATT*NO OF POLES/RPM)

14298.34

-

7149.17

... More
COMMISSIONING THE HT PUMP WITH THE DRIVE MOTOR WITH SEQUENTIAL PROCESS WITH PROPER CARE & CAUTION & DO NEEDFUL OBSERVATION FOR TRIAL RUN TO ACHIEVE THE SATISFACTORY OPERATION OF THE PUMP & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC(MODE OF MEASURMENT-PER DAY BASIS)

1

7500

7500

... More
Sum of Basic Prices (Sl No-1 to 23)

-

-

-

... More
GST @ 18% on the Sum of Sl. No-24

1

147477

147477.97

... More
LWC @ 1% on the Sum of Sl. No.- 24 & 25

1

9668

9668



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.