Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date4 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 1,91,35,909 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.

16

11927

190887.16

... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring

10.37

19238

199586.07

... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (c)Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary.

0.12

23470

2816.4

... More
HHire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for excavation works (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charg(e).With 5.0 cm. thick timber planks. For depth upto 6.00 M below G.L. a) Beyond 1.0 M. upto 2.0 M trench width .

3515.93

727

2556080.3

... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for excavation works (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charg(e).With 5.0 cm. thick timber planks. For depth upto 6.00 M below G.L b) Beyond 2.0 M. and upto 4.0 M. trench width

557.2

754

420128.8

... More
BUILDING WORKS(P) SOLING, EDGING AND METALLING??(1)Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(a) Single brick flat soling (thickness 75 mm.)

2508.98

339

850542.53

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion

164.43

4572

751771.67

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion

72.6

4373

317479.8

... More
Construction of manhole with chamber of size as given below as per requirement without shaft with cement brick work (1:4) over 150mm. thick jhama cement conc. (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber chamber, brick on edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plastering (1:4) finished fine with neat cement 1.50 mm. thick in the inside walls and invert, including supplying, fitting and fixing R.C.P.C. manhole cover & frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) & C.I. steps (4kg. Each) including cutting hard crust, excavation, dewatering, back filling and removal of spoils but excluding shoring complete as per standard drawing . (Depth of invert shall be between 1.25 m. and 1.80 m. below G.L.) i) Average depth of invert 1.25 m. below G.L with 250 mm. thick brick work a) 150 mm to 400 mm dia having internal size (1500mmx750mm)

11

26898

295878

... More
Construction of manhole with chamber of size as given below as per requirement without shaft with cement brick work (1:4) over 150mm. thick jhama cement conc. (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber chamber, brick on edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plastering (1:4) finished fine with neat cement 1.50 mm. thick in the inside walls and invert, including supplying, fitting and fixing R.C.P.C. manhole cover & frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) & C.I. steps (4kg. Each) including cutting hard crust, excavation, dewatering, back filling and removal of spoils but excluding shoring complete as per standard drawing . (Depth of invert shall be between 1.25 m. and 1.80 m. below G.L.) ii) Addition to rate of manhole chamber without shaft as per above item for each addition in depth of 150 mm. or part thereof. With 250 mm. thick brick work a) 150 mm to 400 mm dia having internal size (1500mmx750mm)

31

3228

100068

... More
CONSTRUCTION OF MANHOLE WITH CHAMBER OF SIZE AS GIVEN BELOW AS PER REQUIREMENT AND 600MM X 600MM. (INSIDE MEASUREMENT) SQUARE SHAFT, WITH CEMENT BRICK WORK (1:4) OVER 150 MM. THICK JHAMA CEMENT CONCRETE (1:4:8) BED, OVER A LAYER OF BRICK FLAT SOLING INCLUDING PROVIDING 150MM. THICK R.C.C.SLAB WITH ORDINARY CONCRETE (MIX 1:1.5:3) WITH REINFORCEMENT AS PER STANDARD DRAWING OVER THE CHAMBER, BRICK-ON-EDGE FLOORING WITH ORDINARY CEMENT CONCRETE (MIX 1:2:4) IN THE INVERT WITH 20MM. THICK CEMENT PLASTER (1:4) FINISHED FINE WITH 1.5MM. THICK NEAT CEMENT IN THE INSIDE WALLS AND INVERT INCLUDING SUPPLYING, FITTING AND FIXING R.C.P.C. COVER AND FRAME (35 M.T.LOAD BEARING CAPACITY) WITH ORDINARY CEMENT CONCRETE (MIX 1:2:4) AND C.I.STEPS (4 KG. EACH) INCLUDING CUTTING HARD CRUST, EXCAVATION, DE-WATERING, BACK FILLING AND REMOVAL OF SPOILS BUT EXCLUDING SHORING COMPLETE AS PER STANDARD DRAWING.(DEPTH OF INVERT SHALL NOT BE LESS THAN 1.80M BELOW G.L.)AVERAGE DEPTH OF INVERT 2.5M. BELOW G.L.I) WITH 250MM. THICK BRICK WORK A) 150 MM TO 400 MM DIA HAVING INTERNAL SIZE (1500MMX750MM)

30

33394

1001820

... More
Construction of manhole with chamber of size as given below as per requirement and 600mm X 600mm. (inside measurement) square shaft, with cement brick work (1:4) over 150 mm. thick jhama cement concrete (1:4:8) bed, over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick-on-edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing R.C.P.C. cover and frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 Kg. each) including cutting hard crust, excavation, de-watering, back filling and removal of spoils but excluding shoring complete as per standard drawing. (Depth of invert shall not be less than 1.80M below G.L.) Average depth of invert 2.5m. below G.L ii) Addition or reduction to rate of manhole as per above item for each addition or reduction in depth of 150 mm. or part thereof. With 250mm. thick brick work (Depth of invert should not exceed 3.00M.) a) 150 mm to 400 mm dia having internal size (1500mmx750mm)

90

947

85230

... More
25.CONSTRUCTION OF MANHOLE WITH CHAMBER OF SIZE AS GIVEN BELOW AS PER REQUIREMENT AND 600MM X 600MM. (INSIDE MEASUREMENT) SQUARE SHAFT, WITH CEMENT BRICK WORK (1:4) OVER 150 MM. THICK JHAMA CEMENT CONCRETE (1:4:8) BED, OVER A LAYER OF BRICK FLAT SOLING INCLUDING PROVIDING 150MM. THICK R.C.C.SLAB WITH ORDINARY CONCRETE (MIX 1:1.5:3) WITH REINFORCEMENT AS PER STANDARDDRAWING OVER THE CHAMBER, BRICK-ON-EDGE FLOORING WITH ORDINARY CEMENT CONCRETE (MIX 1:2:4) IN THE INVERT WITH 20MM. THICK CEMENT PLASTER (1:4) FINISHED FINE WITH 1.5MM. THICK NEAT CEMENT IN THE INSIDE WALLS AND INVERT INCLUDING SUPPLYING, FITTING AND FIXING R.C.P.C. COVER AND FRAME (35 M.T.LOAD BEARING CAPACITY) WITH ORDINARY CEMENT CONCRETE (MIX 1:2:4) AND C.I.STEPS (4 KG. EACH) INCLUDING CUTTING HARD CRUST, EXCAVATION, DE-WATERING, BACK FILLING AND REMOVAL OF SPOILS BUT EXCLUDING SHORING COMPLETE AS PER STANDARD DRAWING.(DEPTH OF INVERT SHALL NOT BE LESS THAN 1.80M BELOW G.L.)AVERAGE DEPTH OF INVERT 2.5M. BELOW G.L. I) WITH 250MM. THICK BRICK WORK B) ABOVE 400 MM TO 600 MM DIA HAVING INTERNAL SIZE (1500MMX1100MM)

35

38658

1353030

... More
Construction of manhole with chamber of size as given below as per requirement and 600mm X 600mm. (inside measurement) square shaft, with cement brick work (1:4) over 150 mm. thick jhama cement concrete (1:4:8) bed, over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick-on-edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing R.C.P.C. cover and frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 Kg. each) including cutting hard crust, excavation, de-watering, back filling and removal of spoils but excluding shoring complete as per standard drawing. (Depth of invert shall not be less than 1.80M below G.L.) Average depth of invert 2.5m. below G.L ii) Addition or reduction to rate of manhole as per above item for each addition or reduction in depth of 150 mm. or part thereof. With 250mm. thick brick work (Depth of invert should not exceed 3.00M.) b) Above 400 mm to 600 mm dia having internal size (1500mmx1100mm)

76.53

978

74850.6

... More
Construction of manhole with chamber of size as given below as per requirement and 600mm X 600mm. (inside measurement) square shaft, with cement brick work (1:4) over 150 mm. thick jhama cement concrete (1:4:8) bed, over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick-on-edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing R.C.P.C. cover and frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 Kg. each) including cutting hard crust, excavation, de-watering, back filling and removal of spoils but excluding shoring complete as per standard drawing. (Depth of invert shall not be less than 1.80M below G.L.)Average depth of invert 2.5m. below G.L.iii) Average depth of invert 2.5m. below G.L With 375 mm. thick brick work b) Above 400 mm to 600 mm dia having internal size (1500mmx1100mm)

3

57264

171792

... More
Construction of manhole with chamber of size as given below as per requirement and 600mm X 600mm. (inside measurement) square shaft, with cement brick work (1:4) over 150 mm. thick jhama cement concrete (1:4:8) bed, over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick-on-edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing R.C.P.C. cover and frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 Kg. each) including cutting hard crust, excavation, de-watering, back filling and removal of spoils but excluding shoring complete as per standard drawing. (Depth of invert shall not be less than 1.80M below G.L.)Average depth of invert 2.5m. below G.L. iv) Addition or reduction to rate of manhole as per above item for each addition or reduction in depth of 150 mm. or part thereof. With 375 mm. thick brick work (Depth of invert should not exceed 3.00M.) b) Above 400 mm to 600 mm dia having internal size (1500mmx1100mm)

6

1664

9984

... More
Construction of manhole with chamber of size as given below as per requirement and 600mm X 600mm. (inside measurement) square shaft, with cement brick work (1:4) over 150 mm. thick jhama cement concrete (1:4:8) bed, over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick-on-edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing R.C.P.C. cover and frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 Kg. each) including cutting hard crust, excavation, de-watering, back filling and removal of spoils but excluding shoring complete as per standard drawing. (Depth of invert shall not be less than 1.80M below G.L.)Average depth of invert 2.5m. below G.L.iii) Average depth of invert 2.5m. below G.L With 375 mm. thick brick work c) Above 600 mm to 900 mm dia having internal size (1500mmx1500mm)

9

63841

574569

... More
Construction of manhole with chamber of size as given below as per requirement and 600mm X 600mm. (inside measurement) square shaft, with cement brick work (1:4) over 150 mm. thick jhama cement concrete (1:4:8) bed, over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick-on-edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing R.C.P.C. cover and frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 Kg. each) including cutting hard crust, excavation, de-watering, back filling and removal of spoils but excluding shoring complete as per standard drawing. (Depth of invert shall not be less than 1.80M below G.L.)Average depth of invert 2.5m. below G.L. iv) Addition or reduction to rate of manhole as per above item for each addition or reduction in depth of 150 mm. or part thereof. With 375 mm. thick brick work (Depth of invert should not exceed 3.00M.) c) Above 600 mm to 900 mm dia having internal size (1500mmx1500mm)

27

1813

48951

... More
Constructing Special Inspection chamber pit (size 900 mmX600 mm) to a depth of 1.15 metre (insid(e), 250 mm thick 1st class brick work (1:4) in all sides over a layer of jhama brick soling and 150 mm thick Jhama cement concrete (1:4:8) including necessary earth work, invert with ordinary cement concrete (1:2:4) with stone chips over brick-on-edge flooring, plastering inside with 20 mm thick cement plastering (1:4) and neat cement punning, including supplying,fitting and fixing one 450 mm. dia (15 MT) heavy duty RCPC manhole cover of approved make with R.C.C. slab of 100 mm thick with cement concrete (1:1.5:3) with stone chips including necessary reinforcement, shuttering and CI foot steps (4 kg each) (Depth of invert between 1.15 m to 1.80 m below G.L.)

24

18392

441408

... More
Constructing Special Inspection chamber pit (size 900 mmX600 mm) to a depth of 1.15 metre (insid(e), 250 mm thick 1st class brick work (1:4) in all sides over a layer of jhama brick soling and 150 mm thick Jhama cement concrete (1:4:8) including necessary earth work, invert with ordinary cement concrete (1:2:4) with stone chips over brick-on-edge flooring, plastering inside with 20 mm thick cement plastering (1:4) and neat cement punning, including supplying,fitting and fixing one 450 mm. dia (15 MT) heavy duty RCPC manhole cover of approved make with R.C.C. slab of 100 mm thick with cement concrete (1:1.5:3) with stone chips including necessary reinforcement, shuttering and CI foot steps (4 kg each) (Depth of invert between 1.15 m to 1.80 m below G.L.) ii) Addition and deduction of rate of special inspection chamber pit as per above item for each addition or reduction in depth of 150 mm. or part thereof.

72

1053

75816

... More
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(ii) 225 mm

330

528

174240

... More
Constructing gully pit to a depth of 1.50m (Insid(e) with 250mm th. 1st class Brick Work (1:4) in all sides over a layer of jhama brick soling & 100mm th. jhama cement concrete (1:4:8) including necessary earth work, providing approved type C.I. Syphone (225mm dia) with topping RCPC gully grid (15MT load bearing capacity) constructing invert with brick -on-edge, including 20mm th. inside cement plaster (1:4) finished with neat cement punning, at the top 150mm th. R.C.C. slab (1:1.5:3) with stone chips including necessary reinforcement , shuttering as per standard drawing and as directed by E-I-C complete in all respect and removal of surplus earth with all costs of labour and materials. Inside measurement of gully pit, 1100mm X 600mm

75

23005

1725375

... More
Constructing catch pit to a depth of 1.0m (Insid(e) with 250mm th. 1st class Brick Work (1:4) in all sides over a layer of jhama brick soling & 100mm th. jhama cement concrete (1:4:8) including necessary earth work, providing approved type C.I. Syphone (150mm dia) with topping RCPC gully grid (5MT load bearing capacity) constructing invert with brick -on-edge, including 20mm th. inside cement plaster (1:4) finished with neat cement punning, at the top 100mm th. R.C.C. slab (1:1.5:3) with stone chips including necessary reinforcement, shuttering as per standard drawing and as directed by E-I-C complete in all respect and removal of surplus earth with all costs of labour and materials. Inside measurement of catch pit, 600mm X 525mm

15

12175

182625

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth

2.36

5575

13170.94

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.

7

335

2345

... More
ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES

1.98

6047

11994.29

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.II. Other than SAIL/ TATA/RINL

0.28

55776

15762.3

... More
Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe excluding excavation of earth work, refilling and concreting at bottom and sides). ii) 450 mm dia

20

3491

69820

... More
COST OF SPIGOT / SOCKET TYPE OF PIPE WITH RUBBER GASKET BORE DIA IN MM 400 THICKNESS IN MM 75 STANDARD LENGTH IN M. 2.5

132

4604

607728

... More
COST OF SPIGOT / SOCKET TYPE OF PIPE WITH RUBBER GASKET BORE DIA IN MM 450 THICKNESS IN MM 75 STANDARD LENGTH IN M. 2.5

83

5022

416826

... More
COST OF SPIGOT / SOCKET TYPE OF PIPE WITH RUBBER GASKET BORE DIA IN MM 600 THICKNESS IN MM 85 STANDARD LENGTH IN M. 2.5

59

7896

465864

... More
COST OF SPIGOT / SOCKET TYPE OF PIPE WITH RUBBER GASKET BORE DIA IN MM 700 THICKNESS IN MM 85 STANDARD LENGTH IN M. 2.5

34

9584

325856

... More
Laying of R.C.C. pipe with spigot ... socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe lin(e) A) Class NP-3 Pipe p) 400 mm dia

327

229

74883

... More
Laying of R.C.C. pipe with spigot ... socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe lin(e). A) Class NP-3 Pipe o) 450 mm dia

169

237

40053

... More
Laying of R.C.C. pipe with spigot ... socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe lin(e) A) Class NP-3 Pipe m) 600 mm. dia.

180

333

59940

... More
Laying of R.C.C. pipe with spigot ... socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe lin(e). A) Class NP-3 Pipe l) 700 mm dia

84.5

509

43010.5

... More
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (ii) 20 mm dia. medium quality

36.04

240

8648.74

... More
SUPPLYING PORTABLE PUMPING UNIT (DIESEL DRIVEN) FROM 3 INCH TO 4 INCH ON HIRE BASIS FOR REMOVAL OF STAGNENT WATER FROM SEWER WATER LOGGING AND FLOOD WATER IN DIFFERENT BOROUGHS-- 4 INCH DIA PORTABLE PUMP

1840

75

138000

... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.

16.2

7754

125614.8

... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

6.4

93621

599299.85

... More
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

640.13

166

106262.24

... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 13)Santras. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages

50

326

16300

... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages

60

245

14700

... More
Estimated amount

-

-

-

... More
Add: 9%SGST

1

1

1445068

... More
Add: 9%CGST

1

1

1445068

... More
1% LWC

1

1

189464.45



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.