Kolkata Municipal Corporation Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date7 Feb 2025
Closing Date6 Mar 2025
Tender Amount₹ 78,32,469 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(A). ORIGINAL WORKS?..(2)Strong bamboo posts, posts plates, rafters, ties etc. fitted and fixed complete with coir rope or nails as directed. (Embedded portion of posts shall also be paid for against this item cost of digging hole and repacking being paid forseperately) :(a) 75 mm. dia bamboo

853.8

50

42690

... More
BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(A). ORIGINAL WORKS?.(10)Bamboo walling made of crushed bamboo or split bamboo or bamboo twigs(kanchis) as directed and tied with necessary stiffners of split bamboo (in pairs) made of 100mm dia. Bamboo fitted and fixed complete (but excluding the cost of supporting frame work)

781.82

127

99290.63

... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for excavation works (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charg(e).With 5.0 cm. thick timber planks. For depth upto 6.00 M below G.L. a) Beyond 1.0 M. upto 2.0 M trench width .

2275.58

727

1654345.93

... More
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018)

1077.44

361

388955.88

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018)

99.79

4761

475096.86

... More
COST OF SPIGOT / SOCKET TYPE OF PIPE WITH RUBBER GASKET bore dia in mm 450 thickness in mm 75 standard length in m. 2.5

176

5022

883872

... More
Laying of R.C.C. pipe with spigot ... socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe line). A) Class NP-3 Pipe o) 450 mm dia

387.1

237

91742.7

... More
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(ii) 225 mm

96.4

528

50899.2

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS  7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth.  ( 3rd Corrigenda & addenda dated 04.06.2018)

9.16

5682

52025.81

... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018)

40.73

194

7900.65

... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

40.73

34

1384.65

... More
Construction of manhole with chamber of size as given below as per requirement  and 600mm X 600mm. (inside measurement) square shaft, with cement brick work (1:4) over 150 mm. thick jhama cement concrete (1:4:8) bed, over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary concrete (mix 1:1.5:3) with reinforcement as per standard drawing  over the chamber, brick-on-edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing R.C.P.C. cover and frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 Kg. each) including cutting hard crust, excavation, de-watering, back filling and removal of spoils but excluding shoring complete as per standard drawing. (Depth of invert shall not be less than 1.80M below G.L.)  Average depth of invert 2.5m. below G.L.i) With 250mm. thick brick work b) Above 400 mm to 600 mm dia having internal size (1500mmx1100mm)

15

43548

653220

... More
Construction of manhole with chamber of size as given below as per requirement  and 600mm X 600mm. (inside measurement) square shaft, with cement brick work (1:4) over 150 mm. thick jhama cement concrete (1:4:8) bed, over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary concrete (mix 1:1.5:3) with reinforcement as per standard drawing  over the chamber, brick-on-edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing R.C.P.C. cover and frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 Kg. each) including cutting hard crust, excavation, de-watering, back filling and removal of spoils but excluding shoring complete as per standard drawing. (Depth of invert shall not be less than 1.80M below G.L.)Average depth of invert 2.5m. below G.L.iii) Average depth of invert 2.5m. below G.L   With 375 mm. thick brick work b) Above 400 mm to 600 mm dia having internal size (1500mmx1100mm)

15

57264

858960

... More
Construction of manhole with chamber of size as given below as per requirement  and 600mm X 600mm. (inside measurement) square shaft, with cement brick work (1:4) over 150 mm. thick jhama cement concrete (1:4:8) bed, over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary concrete (mix 1:1.5:3) with reinforcement as per standard drawing  over the chamber, brick-on-edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing R.C.P.C. cover and frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 Kg. each) including cutting hard crust, excavation, de-watering, back filling and removal of spoils but excluding shoring complete as per standard drawing. (Depth of invert shall not be less than 1.80M below G.L.)Average depth of invert 2.5m. below G.L. iv) Addition or reduction to rate of manhole as per above item for each addition or reduction in depth of 150 mm. or part thereof. With 375 mm. thick brick work     (Depth of invert should not exceed 3.00M.) b) Above 400 mm to 600 mm dia having internal size (1500mmx1100mm)

34

1664

56576

... More
Constructing gully pit to a depth of 1.50m (Insid(e) with 250mm th. 1st class Brick Work (1:4) in all sides over a layer of jhama brick soling & 100mm th. jhama cement concrete (1:4:8) including necessary earth work, providing approved type C.I. Syphone (225mm dia) with topping RCPC gully grid (15MT load bearing capacity) constructing invert with brick -on-edge, including 20mm th. inside cement plaster (1:4) finished with neat cement punning, at the top 150mm th. R.C.C. slab (1:1.5:3)  with stone chips including necessary reinforcement , shuttering as per standard drawing  and as directed by E-I-C complete in all respect and removal of surplus earth with all costs of labour and materials. Inside measurement of gully pit,  1100mm X 600mm

3

19342

58026

... More
Manhole connection (upto 300mm. dia) including mending good all complete with (1:2:4) cement concrete as per specification and direction of Engineer-in-charge.

1

350

350

... More
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.

633.24

14

9118.66

... More
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.(b) For each additional Depth of 150mm and part thereof. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16 Page No.240)

1752.36

19

33294.84

... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.

492.28

77

38171.56

... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4.   Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand(5th Corrigenda & addenda dated 16.04.2019)

176.21

1317

232094.56

... More
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal  / Laterite (63 mm to 45 mm) (Moorum replaced with course sand)  (For compacted thickness 75mm)

1174.74

188

221121.31

... More
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.)

587.37

11

6502.19

... More
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.)

229.95

10

2340.89

... More
Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time

817.32

41

33510.12

... More
35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry paste@2.75kg cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath.

49.12

244

11985.28

... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.

1349.62

166

224037.09

... More
Estimated amount

-

-

-

... More
Add: 9%SGST

1

13091

591476.96

... More
Add: 9%CGST

1

13091

591476.96

... More
1% LWC

1

2443

77549.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.