Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Eprocure
Opening Date3 Jan 2025
Closing Date13 Jan 2025
Tender Amount₹ 4,91,526 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SEQUENTIAL DISCONNECTION OF SLIP RINGS OF HT MOTOR AND TAKE OUT THE SAME FROM ROTOR SHAFT WITH CARE AND CAUTION AND COMPLIANCE OF RELEVAT SAFETY NORMS AND KEEP IN THE IDENTILIED AT WORK SITE AS PER DIRECTION OF EIC. ( MODE OF MEASUREMENT - DRIVE MOTOR WATT X NO OF POLES / RPM)

4004.04

-

3003.03

... More
TAKING OUT THE BEARINGS HAVING ID (70 MM -200MM) WITH PROPER CARE AND CAUTION BY PROVIDING ALL RELEVANT TOOLS AND FIXTURES AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. MODE OF MEASUREMENT ? THICKNESS OF BEARING X (ID + OD) OF BEARINGS.

115.5

50

5775

... More
PREPARATION OF THE ERODED SURFACE OF THE SLIP RINGS WITH STANDARD ENGINEERING PRACTICE AND DO NEEDFUL FOR SURFACE DEVELOPMENT BY METAL (METERIAL SHOULD BE AS PER THE EXISTING SLIP RINGS) DEPOSITION/MACHINEABLE ELECTRODE ON THE PITTED/ ERODED PORTION AND MACHINING AND FINISHING THE SLIP RINGS FOR FURTHER USE AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT- AREA IN CM? OF THE ERODED SURFACE MAXIUM ERODED DEPTH) SLIP RING DIA -320MM, AXIAL ERODED LENGTH- 10MM, ERODED DEPTH- 2 MM = PI X 32 X 1 X .2 = 20.1 CM3

20.1

3250

65325

... More
TAKING OUT THE ROTOR (HAVING BALL AND ROLLER BEARINGS) FROM THE STATOR AFTER NECESSARY DEMARCATION AND MEASUREMENT AND PLACING THE ROTOR ON A PEDESTAL AT THE SUITABLE WORKING FLOOR BY USING DEPARTMENTAL OVER HEAD CRANE ETC VERY CAUTIOUSLY COMPLYING SAFETY NORMS AND COMPLETE ETC AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT-DRIVE MOTOR WATT X NO OF POLES / RPM )

4004.04

2

8408.49

... More
TO AND FRO TRANSPORTATION OF ROTOR ASSEMBLY FROM WORK SITE TO THE ROTOR REPAIRING /SERVICING WORK SHOP AND VICE VERSA INCLUDING LOADING AND UNLOADING WITH PROPER CARE AND CAUTION OF ROTOR ASSEMBLY AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT- WT OF ROTOR WITH HALF COUPLING.

1.8

3780

6804

... More
TO AND FRO TRANSPORTATION OF STATOR ASSEMBLY FROM WORK SITE TO THE ROTOR REPAIRING /SERVICING WORK SHOP AND VICE VERSA INCLUDING LOADING AND UNLOADING WITH PROPER CARE AND CAUTION OF ROTOR ASSEMBLY AS PER DIRECTION OF EIC..(MODE OF MEASUREMENT- WT OF ROTOR WITH HALF COUPLING.

3.9

3780

14742

... More
REMOVAL OF HALF COUPLING USING HYDRAULIC PULLER AND FIXTURES ETC VERY CAUTIOUSLY WITHOUT DAMAGING THE SHAFT AND COMPLETE AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT-DRIVE MOTOR WATT X NO OF POLES / RPM )

4004.04

-

2202.22

... More
DUSTING OFF THE HT STATOR WINDING BY SUITABLE BRUSH AND MOIST FREE GAS(OXYGEN/CLEAN DRY AIR JETTING ARRANGEMENT (PRESSURE IS NOT SO HIGH TO DAMAGE THE INSULATION) AND FOLLOWING SUBSEQUENT HEATING AND CLEANING PETROLEUM BASED SUITABLE ORGANIC COMPOUND THOROUGHLY ETC COMPLETE AS PER DIRECTION OF EIC(MODE OF MEASUREMENT-MEASURED SURFACE INNER AREA I.E. STATOR CORE INNER DIA. X ? X LENGTH OF CORE ) + (2 X OVERHANG LENGTH OF THE COIL) OF THE CORE OF THE COMPLETE STATOR.

2.49

5345

13325.62

... More
HEAT VARNISHING THE HT RATED STATOR WINDING WITH TWO COATS OF DR BECK HTF-50 VARNISH AND SUBSEQUENT HEATING TO SUITABLE TEMPERATURE TILL REQUISITE RESULT IS OBTAINED TO GET THE SATISFACTORY IR VALUE, PI VALUE, INDUCTANCE/RESISTANCE MEASUREMENT , HIGH VOLTAGE TEST AND COMPLETE IN ALL RESPECT WITH PROPER CARE AND CAUTION AS PER DIRECTION OF EIC. ALL TEST CERTIFICATES TO BE FURNISHED.(MODE OF MEASUREMENT- MEASURED SURFACE INNER AREA I.E. STATOR CORE INNER DIA X ? X LENGTH OF CORE ) + (2 X OVERHANG LENTH OF THE COIL) OF THE CORE OF THE COMPLETE STATOR.

2.49

10530

26252.34

... More
DUSTING OFF THE HT ROTOR BY SUITABLE BRUSH AND MOIST FREE GAS(OXYGEN/CLEAN DRY AIR JETTING ARRANGEMENT (PRESSURE IS NOT SO HIGH TO DAMAGE THE INSULATION) AND FOLLOWING SUBSEQUENT HEATING AND CLEANING PETROLEUM BASED SUITABLE ORGANIC COMPOUND THOROUGHLY ETC COMPLETE AS PER DIRECTION OF EIC(MODE OF MEASUREMENT-MEASURED SURFACE INNER AREA I.E. STATOR CORE INNER DIA. X ? X LENGTH OF CORE ) + (2 X OVERHANG LENGTH OF THE COIL) OF THE CORE OF THE COMPLETE STATOR.

2.49

4000

9972.4

... More
HEAT VARNISHING THE HT RATED ROTOR WITH TWO COATS OF DR BECK HTF-50 VARNISH AND SUBSEQUENT HEATING TO SUITABLE TEMPERATURE TILL REQUISITE RESULT IS OBTAINED TO GET THE SATISFACTORY IR VALUE, PI VALUE, INDUCTANCE /RESISTANCE MEASUREMENT , HIGH VOLTAGE TEST AND COMPLETE IN ALL RESPECT WITH PROPER CARE AND CAUTION AS PER DIRECTION OF EIC. ALL TEST CERTIFICATES TO BE FURNISHED. (MODE OF MEASUREMENTMEASURED SURFACE INNER AREA I.E. STATOR CORE INNER DIA X ? X LENGTH OF CORE ) + (2 X OVERHANG LENTH OF THE COIL) OF THE CORE OF THE COMPLETE STATOR.

2.49

9830

24507.17

... More
TRUENESS AND ECCENTRICITY CHECKING OF THE ROTOR ASSEMBLY OF 6KV RATED MOTOR AND DYNAMIC BALANCING OF THE COMPLETE ASSEMBLY AT RATED SPEED BY ADDING OR REMOVING THE UNBALANCED MASS AT A REPUTED WORKSHOP AND COMPLETE IN ALL RESPECT WITH PROPER CARE AND CAUTION AS PER DIRECTION OF EIC.(DYNAMIC BALANCING CERTIFICATES TO BE FURNISHED) MODE OF MEASUREMENT- WT OF THE COMPLETE ROTOR .

1620

27

43740

... More
ASSEMBLING THE HT MOTOR STATOR AND ROTOR (HAVING BALL& ROLLER BEARING / BUSH BEARING IN TO STATOR WITH REQUIRED UNIFORM AIR GAP CAREFULLY WITHOUT ANY DAMAGE TO THE ROTOR SURFACE COMPLYING RELEVANT SAFETY NORMS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT ? GROSS WEIGHT OF MOTOR)

5.4

4860

26244

... More
FITTING FIXING OF BALL/ROLLER BEARING(HAVING MONIMUM ID-75 MM TO 200MM) BY APPLING THE METHOD OF EXPANSION WITH PROPER CARE AND CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.[ MODE OF MEASUREMENT- { NO.OF BEARING*(THICKNESS OF BEARING BULTIPLIED BY SUM OF ID & OD OF THE BEARINGS]

115.5

85

9817.5

... More
PLACING THE COMPLETE ASSEMBLED MOTOR ON THE SOLE PLATE USING DEPARTMENTAL OVER HEAD CRANE, TIGHTENING THE FOUNDATION BOLTS, FIXING THE DOWEL PINS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT- GROSS WEIGHT OF MOTOR)

5.4

950

5130

... More
SEQUENTIAL RE-ASSEMBLING OF THE REPAIRED SLIP RING WITH THE INSERSION OF INSULATION ON THE ROTOR SHAFT AND REMAKE THE TERMINATIONS WITH THE ROTOR COIL & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. ( MODE OF MEASUREMENT- DRIVE MOTOR WATT X NO. OF POLES / RPM )

4004.04

-

3403.44

... More
ALIGNMENT OF MOTOR WITH THE PUMP SHAFT USING DIAL GAUGE ETC BOTH FOR AXIAL AND RADIAL INCLUDING INSERTION OF REQUIRED BRASS SHEET ON SOLE PLATE ETC COMPLETE AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT- WATTAGE OF THE DRIVE MOTOR X NO OF POLES / RPM )

4004.04

1

7207.28

... More
MAKING COUPLING THE HT PUMP WITH THE DRIVE MOTOR BY INSERTING THE COUPLING PINS ETC WITH CARE & CAUTION & COMPLETE AS PER DIRECTION OF EIC. ( MODE OF MEASUREMENT- DRIVE MOTOR WATT X NO OF POLES / RPM )

4004.04

-

2002.02

... More
HT CONNECTIONS OF MOTOR TERMINALS WITH ALL EXISTING CABLES CONNECTED WITH THE FEEDER BREAKER/ CAPACITOR/ SOFT STARTER & EXISTING LT CONNECTIONS SUCH AS MOTOR SPACE HEATER/MOTOR TEMPERATURE SCANNER& EARTH TERMINALS, COUPLING THE HT PUMP WITH THE DRIVE MOTOR WITH COUPLING PINS, NUTS BOLTS ETC COMPLETE AS PER DIRECTION OF EIC.

2

4375

8750

... More
COMMISSIONING THE HT MOTOR WITH LOAD AND DO NEEDFUL OBSERVATION UNDER TRIAL RUN TO ACHIEVE SATISFACTORY OPERATION OF THE HT MOTOR AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT ? PER DAY BASIS)

1

7500

7500

... More
STATUTORY REQUISITE PRE-COMMISSIONING HIGH VOLTAGE TESTS OF THE HT MOTOR TO BE DONE BY ENGAGING THE AUTHORIZED AGENCY OF DIRECTORATE OF ELECTRICITY, HAVING ALL RELEVANT CALIBRATED HIGH VOLTAGE TESTING SET WITH ITSALLIED ACCESSORIES AND DO NEEDFULFOR A NO LOAD TRIAL RUN OF THE HT MOTOR AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC AND THE RELEVANT PRE-COMMISSION HV TEST RESULTS TO BE FURNISHED TO THE EIC.

1

22500

22500

... More
SUPPLY OF FAG IMPORTED BEARING NO.- NU1026-XL-M1-C3

1

28243

28243.22

... More
SUPPLY OF FAG IMPORTED BEARING NO.- NU1028-XL-M1-C3

1

30886

30886.59

... More
UNIFIED SCHEDULE OF RATE (M & E) IRRIGATION & WATERWAYS DEPERTMENT W.E.F MAY 10, 2022 CHAPTER: 4.2 PAGE NO: 69, 70 HIRE CHARGES OF MACHINERY SL NO: 16, HYDRAULIC TRUCK CRANE 12 T ( HOURLY BASIS) ( HIRE CHARGE : 267.60 PER HOUR + HOURLY FULE / ENERGY CHARGE: 749.49 + MACHINE OPERATORS CHARGES PER HOUR: 215.70 ) ( 10% CONTRACTORS PROFIT AND 8% OVERHEAD CHARGES WILL BE ADDED)

16

1454

23275.04

... More
Sub Total

-

-

-

... More
GST 18%

1

74236

74236

... More
L.W.Cess @1%

1

4866

4866.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.