Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Civil And Construction
Eprocure
Opening Date18 Mar 2024
Closing Date9 Apr 2024
Tender Amount₹ 8,33,068 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(B). MAINTENANCE WORKS?(11)Bamboo pile walling made of 65 mm to 75 mm dia. Bamboo (in single line) driven about half length into the ground at very close spacing side by side including necessary bamboo stays, ties, runners etc and lining the exposed portion with sheets made form cut-drums fitted and fixed complete as per direction. (Payment to be made on length of wall(a) With bamboos of length between 1.20 m. and 1.80 m. each.

20

16740

837

... More
SUPPLING AT SITE GEOTEXTILE BAGS OF SIZE 1.00 M X 0.70M USING UV STABILIZED NEEDLE PUNCHED POLYPROPYENE NON-WOVEN GEOTEXTILE OF 300GSM AS PER SPECIFICATION , DOUBLE STITCHED AT TWO ENDS WITH POLYPROPYLENE OR EQUIVALENT YARN INCLUDING COAST OF TRANSPORTATION BY ALL MEANS AND OTHER INCIDENTAL CHARGES COMPLETE. NOTE:PAYMENT WILL BE MADE SUBJACT TO THE RESULT OF 3RD PARTY TESTING , TO BE DONE BY THE ENGINEER -IN-CHARGE DEPARTMENTALLY.[I & W SCH-2018-C-26,SL NO-2.86]

270

36180

134

... More
LABOUR CHARGES FOR FILLINGGEO-TEXTILE BAGS WITH FILLER MATERIALS(EARTH/SAND),MACHINE STITCHING THE OPEN END OF THE BAG WITH THREAD AS PER DESIGN AND PLACING THE SAME ON SLOPE OR DUMPING FROM BANK WITHIN INITIAL LEAD OF 150M AND ALL LIFTS INCLUDING CARRIAGE AND HIRE CHARGES OF ALL MATERIALS AND EQUIPMENTS BUT EXCLUDING THE COST OF FILLER MATERIALS AS DIRECTED BY THE EIC ) BAG SIZE 1.00MX0.70M OF CAPACITY 0.1325CUM/BAG.[I & W SCH-2018-C-26,SL NO-2.88]

270

15390

57

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 4. Brick-on-edge floor or pavement with 1st class brick set close in cement mortar (1:6) and laid with cushion of sand below (including cost thereof) including ruled or flush pointing with cement mortar (1:4) on top.

41

34276

836

... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.

1.65

127

77.54

... More
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10 (ii) Page No.247  & page-222 sl. No-5 (f))

122

237277

1944.9

... More
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(i) For Construction of Sub Base by consolidating Jhama metal  / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & page-222 sl. No- 1 & 5 (e))

122

316813

2596.83

... More
SUPPLYING, SPREADING AND CONSOLIDATING STONE DUST TO A DEPTH OF 100MM AND ABOVE AT DESIRED DENSITY AND C.B.R. AS PER SPECIFICATION WITH POWER ROLLER TO PROPER GRADIENT AND CAMBER INCLUDING WATERING AS NECESSARY, AND LIGHTING, GUARADING, BARRICADING AND MAKING ADEQUATE EARTHEN BUNDH WHERE NECESSARY TO PROTECT THE EDGES AND CURING WITH WATER FOR 2 TO 3 DAYS, MENDING CRACKS AND DEPRESSIONS BY ROLLING WHERE NECESSARY INCLUDING ALL INCIDENTAL CHARGES OF ROLLER, COST OF FUEL & LUBRICANTS COMPLETE AS PER SPECIFICATION.[PAGE-245, ITEM NO-4.06 FROM PWD(WB),SCHEDULE OF ROADS & BRIDGE WORKS-2018, VOLUME-III]

81

16767

207

... More
Sum of Basic Prices (Sl No-1 to 10)

-

-

-

... More
GST @ 18% on the Sum of Sl. No-1 to 10

1

125820

125820.02

... More
LWC @ 1% on the Sum of Sl. No.11 & 12

1

8248

8248.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.