Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date30 Dec 2024
Closing Date9 Jan 2025
Tender Amount₹ 2,72,204 
Notes
Download

Costs

Summary

Kmc/ws/ee/ssu/w -119/02/24-25/17

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 upto 5km

2.04

261

531.14

... More
CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 per km beyond 5km to 10km

10.18

19

193.33

... More
CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 per km beyond 10km to 20km

20.35

16

325.6

... More
CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 per km beyond 20km

61.05

13

793.65

... More
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.12 Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made separately. (i) 600 mm. x 450 mm. size of board.

2

427

854

... More
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge.

20.51

636

13044.36

... More
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick

2.31

939

2169.09

... More
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.4 Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C

3

1867

5601

... More
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1  Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.

1.56

11927

18600.16

... More
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS (b) Repair Works 18. Drilling and tapping C.I. main. (i) Upto 15 mm

3

160

480

... More
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS (b) Repair Works 18. Drilling and tapping C.I. main. (ii) Above 15 mm upto 25 mm

3

200

600

... More
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials  2.1 C.I. / D.I. Pipe & Specials 2.1.3 Lead jointing to C.I pipes and specials with supply of lead and spun yarn all complete to make the joint water tight at required hydraulic pressure as per specification & direction of the Engineer-in-charge. (Lead shall be supplied departmentally to the Agency at specified Issuerates and cost thereof shall be recovered from the. works Bill of the Agency] Diameter in mm 200mm dia

6

1759

10554

... More
CHAPTER - VIII SUPPLYING OF MATERIALS 8.8 Ductile iron double flanged manually operated sluice valve generally conforming to IS : 14846, having body, door, dome, gland in graded ductile iron to IS 1865, four faces and spindle nut of gun metal to IS : 318, inside screw non- rising stainless steel AISI-410 spindle valves suitable formaximum working pressure of 10 kg/cm... and body tested 15 kg/cm..., flanges flat faced and drilled to IS: 1538 :1993. Valves tested by closed end method only. 350mm and above valves are complete with enclosed gear box with anti friction device.Diameter in mm 100

2

10794

21588

... More
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials  2.1 C.I. / D.I. Pipe & Specials 2.4Valves 2.4.1 Lowering, fitting and fixing of all types of valves in proper position and alignment using chain pully block or crane(for diameter above 250 mm) by providing temporary support,as required,gaskets,nuts& bolts etc.all cornplete as per specification and direction of the Engineer-in-Charge.[The rate Includes cost of flange joints]50mm dia.

2

986

1972

... More
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.5.Open jointed stone ware pipe 100 mm dia. supplied, laid and fitted in position duly encircled all round by 150 mm thick layer jhama metal (38 mm to 50 mm size) including excavation of earth in any soil upto required depth including refilling trench,watering and ramming complete. (Cost of Jhama Metal to be paid seperately).

4

273

1092

... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS  8. Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth

0.07

5306

358.16

... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (c) 15 mm thick plaster

0.54

145

78.3

... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

0.54

34

18.36

... More
CHAPTER - VIII SUPPLYING OF MATERIALS 8.5 Supply of Single/Double bit SBR gasket suitable for jointing CI/DI pressure pipes, conforming to IS : 5382 : 1985 [Popularly known as `Tyton Gasket...] 100mm dia

61

39

2379

... More
BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. III. EVENT MANAGEMENT : 7) Hire and labour charges for coir rope fencing 25 mm dia rope single on 120 m dia bamboo posts 1.40 m above G.L and 600 mm below G.L 1.50 m apart including digging holes complete.

261.5

17

4445.5

... More
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.2 Lowering any type of Ductile Iron (DI) pipes & specials and laying along trench at any depth as per speclfication and direction of the Engineer-incharge, ( laying over ground. the rates shall be, reduced by 10% and the rates so reduced shall be inclusive of cost of all sorts of holding arrangements]Diameter in mm 100mm dia.

2.04

1400

2849

... More
CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor]

400

33

13200

... More
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.28Hire charges of lighting generator of capacity 5KVA including fuel, mobil, operator, carriage etc. including all complete for water supply works. For minimum engagement of 8 hrs. In a day

2

1650

3300

... More
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials  2.1 C.I. / D.I. Pipe & Specials 2.1.7 Cutting of C.l/D.I pipes for fitting with pipes and-or specials of similar or dissimilar materials at the time of laying without damaging any part of the required length including taking out of the broken pieces from the trench and restacking the same at the specified location as per direction of the Engineer-in-Charge.D iameter in mm 100mm dia.

19

91

1729

... More
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials  2.1 C.I. / D.I. Pipe & Specials 2.1.8 Chamfering the spigot end of C.l./D,l. pipes for fitting with the socket of C.I./D.I pipes and/or specials in tyton jointed water mains or other wise using electric grinder as per specification and direction of the Engineer-in-Charge.Diameter in mm  200mm dia.

2

148

296

... More
CHAPTER - V HYDRAULIC TESTING Hydraulically testing of C.l./D.I/A.C pipe lines in sections, under a head of water not less than 60m{6Kg/Cm....pressure) or above as per specific requirements by filling the main with supply of water including supply of all specials and equipments like pump sets, gauges, end caps blank flange etc.all complete as per specification and direction of the Engineer-in-Charge.[After successful completion of test. removal of ancillary specials.equipments. plugging arrangements and disposal of water sholl be made at no extra cost] Diameter in mm 80

2.04

2173

4422.06

... More
CHAPTER - III TAKING OUT PIPES AND SPECIALS Cast Iron / Ductile Iron Pipes and Specials  M.S. Pipes and Specials Shifting house connection or stand post connection from existing main to new main after excavation through any kind of soil and road materials up to required depth. dismantling existing ferrule with all fittings. plugging hole of old main with G.I. plug. drilling and tapping the new main. refixing the ferrule on the new main with serviceable old G.I pipes and other specials (New G.l. pipes and other specials. if required to be installed shall be paid extra) and back filling the trench with excavated materials all complete as per specification and direction of the Engineer- in-Charge.

24

1427

34248

... More
PLUMBING WORKS (A)-(I) FERRULE AND FERRULE CONNECTION (a) Original Works 2. Supplying, fitting and fixing brass ferrule including connection with P.V.C. pipe of approved make upto 450 mm long with plumbing joint,brass over C.P. coupling at both ends, with cap and lining complete in all respect, including cutting trenches in all sorts of soil and filling up trenches as per direction of the Engineer-in-charge. (iv) 10 mm dia.

3

922

2766

... More
PLUMBING WORKS (A)-(I) FERRULE AND FERRULE CONNECTION (a) Original Works 1. Supplying,fitting and fixing brass ferrule including connection with G.I. pipes of TATA make of following dia. and upto 450 mm long with screw,jamnut,sockets etc.,complete in all respect, including cutting trenches in all sorts of soil and filling up the trenches as per direction of the Engineer - in - Charge. (iii) 15 mm dia.

2

981

1962

... More
PLUMBING WORKS (A)-(I) FERRULE AND FERRULE CONNECTION (a) Original Works 1. Supplying,fitting and fixing brass ferrule including connection with G.I. pipes of TATA make of following dia. and upto 450 mm long with screw,jamnut,sockets etc.,complete in all respect, including cutting trenches in all sorts of soil and filling up the trenches as per direction of the Engineer - in - Charge. (ii) 20 mm dia.

4

1338

5352

... More
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (i) 15 mm dia. medium quality

10.5

214

2247

... More
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (ii) 20 mm dia. medium quality

5.4

240

1296

... More
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (iii) 25 mm dia. medium quality

5.8

319

1850.68

... More
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Compressor machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, Tools and plants all complete for cutting Road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of EIC . a) With Pneumatic hammers For minimum engagement of 8 hrs. In a day

1

6000

6000

... More
MATERIALS AND LABOUR  1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.

17

245

4165

... More
CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.2 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work.(a) With earth obtained from excavation of foundation

1.72

7754

13341.54

... More
Sub Total

-

-

-

... More
GST 18%

1

41111

41111.52

... More
CESS 1%

1

2695

2695.09



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.