Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date18 Feb 2025
Closing Date11 Mar 2025
Tender Amount₹ 7,99,557
Costs
EMD
₹ 16,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KMC_817025_1Tender No
KMC/DGC/V/043/07/2024-2025Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm
19
334
6346
... More
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018)
90.94
361
32829.34
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018)
30.6
4761
145686.6
... More
DE-WATERING BY 3" DIA PUMP
176
70
12320
... More
Manhole connection (upto 450 mm. dia.) including mending good all complete with (1:2:4) cement concrete as per specification and direction of Engineer-in-charge..
1
388
388
... More
Constructing Special Inspection chamber pit (size 900 mmX600 mm) to a depth of 1.15 metre (insid(e), 250 mm thick 1st class brick work (1:4) in all sides over a layer of jhama brick soling and 150 mm thick Jhama cement concrete (1:4:8) including necessary earth work, invert with ordinary cement concrete (1:2:4) with stone chips over brick-on-edge flooring, plastering inside with 20 mm thick cement plastering (1:4) and neat cement punning, including supplying,fitting and fixing one 450 mm. dia (15 MT) heavy duty RCPC manhole cover of approved make with R.C.C. slab of 100 mm thick with cement concrete (1:1.5:3) with stone chips including necessary reinforcement, shuttering and CI foot steps (4 kg each) (Depth of invert between 1.15 m to 1.80 m below G.L.)
10
18392
183920
... More
Constructing Special Inspection chamber pit (size 900 mmX600 mm) to a depth of 1.15 metre (insid(e), 250 mm thick 1st class brick work (1:4) in all sides over a layer of jhama brick soling and 150 mm thick Jhama cement concrete (1:4:8) including necessary earth work, invert with ordinary cement concrete (1:2:4) with stone chips over brick-on-edge flooring, plastering inside with 20 mm thick cement plastering (1:4) and neat cement punning, including supplying,fitting and fixing one 450 mm. dia (15 MT) heavy duty RCPC manhole cover of approved make with R.C.C. slab of 100 mm thick with cement concrete (1:1.5:3) with stone chips including necessary reinforcement, shuttering and CI foot steps (4 kg each) (Depth of invert between 1.15 m to 1.80 m below G.L.) ii) Addition and deduction of rate of special inspection chamber pit as per above item for each addition or reduction in depth of 150 mm. or part thereof.
34
1053
35802
... More
23.Construction of Catch pit 600mmX525mm. (inside measurement) and depth of invert 1000mm. below G.L. with 250mm. thick cement brick work (1:4) over 100mm. thick jhama cement concrete (1:4:8) bed over a layer of brick flat soling including providing 100mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing, brickon- edge flooring with 20 mm. thick cement plaster (1:4) finished fine with 1.5 mm. thick neat cement in the inside walls and invert including supplying and fixing R.C.P.C. gully grid (5 M.T.load bearing capacity) and 150 mm. dia. C.I. Syphone including cutting hard crust, excavation, dewatering, back filling and removal of spoils as per standard drawing
7
10159
71113
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.
145.36
166
24129.76
... More
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand(5th Corrigenda & addenda dated 16.04.2019)
0.28
131714
36584.42
... More
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm)
140.56
188
26457.61
... More
Estimated amount
-
-
-
... More
Add: 9%SGST
1
13091
60379.41
... More
Add: 9%CGST
1
13091
60379.41
... More
1% LWC
1
2443
7916.41
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%