Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Solid Waste Management
Eprocure
Opening Date23 Jun 2023
Closing Date1 Jul 2023
Tender Amount₹ 4,52,786 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.24.Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).

1952.68

11716

6

... More
MATERIALS AND LABOUR 1. Building (A) Materials delivered and stacked at site: 6)d ) Silver Sand. Note: 1. The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage and 10% Contractor?s Profit but exclusive of GST 2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at site and no other costs need to be considered. For other items, necessary loading-unloading & carriage charges are admissible. 3. Laterrite Boulder &Moorum are available in the districts as mentioned in Sl. No. ? 23 & 24 respectively, remaining districts may add necessary carriage cost as applicable.

54.68

36468

667

... More
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.27.Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates (stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/bag

1952.68

13668

7

... More
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.26 Hire charges of moveable crane with fuel & manpower having load handling capacity upto 14MT with the 45 deg. moveable arrangement & the boom length of 40 feets for loading & unloading of various materials / accessories of water supply works. For minimum engagement of 8 hrs. In a day

5

39680

7936

... More
WEAVING WIRE MATTRESS AS DIRECTED WITH WIRE OF 4MM DIA. AND MAKING SAUSAGE CRATE OF REQUIRED SHAPE AFTER TYING ALL INTERSECTIONS INCLUDING JOINING LONGITUDINAL ENDS, CLOSING ENDS OF SAUSAGE, CARRIAGE OF WIRE TO SITE OF WORK COMPLETE IN ALL RESPECT AS PERDIRECTION OF THE ENGINEER-IN-CHARGE INCLUDING COST OF SUPPLY OF G.I. WIRE. (WITH 100MM X 100MM MESH.)

467.28

93923

201

... More
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.29.Dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts.

1952.68

5858

3

... More
PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.32.Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site.

1952.68

11716

6

... More
CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor]

1280

42240

33

... More
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

188.14

31231

166

... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3) Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.

50

13475

269.5

... More
Sub Total

-

-

-

... More
GST 0%

1

-

-

... More
CESS 1%

1

4483

4483.03



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.