Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Road Construction
Eprocure
Opening Date17 Jan 2025
Closing Date28 Jan 2025
Tender Amount₹ 2,69,344.95 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 6,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Kmc/ee(c )/br-xv/134/075/2024-2025/r
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KMC_802932_1Bid Award Id
ViewTender No
KMC/EE(C )/BR-XV/134/075/2024-2025/RTender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete
282.42
124
35020.08
... More
SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF INTERLOCKING CONCRETE BLOCK PAVEMENT (ICBP) WITH CONCRETE BLOCK (WITH CONCRETE GRADE AS SPECIFIED AS PER TABLE 1 OF IS 15658 :2006) MANUFACTURED FROM BIS LICENSEE MANUFACTURER ,WITH SPACER NIB (SMALL PROTRUDING PROFILES ON THE VERTICAL FACE OF PAVER BLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP IN BETWEEN THE PAVING BLOCK ,AS PER CI NO3.26 OF IS 15658) AND SPECIFIED SIZE AND SHAPE WITH ASPECT RATIO (THE RATIO OF LENGTH TO THICKNESS OF A PAVER BLOCK ,AS PER CI NO3.3 OF IS:15658)AS PER TABLE 2 OF IS:15658 WITH FLEXURAL STRENGTH /BREAKING LOAD AS PER ANNEXURE G OF IS:15658 AND COMPLETING THE EDGE WITH CUT BLOCKS AS PER CI NO 8.7 OF IRC SP -63(2018) WITH PROPER CONFINEMENT OF BEDDING AND JOINT FILLING SAND ,COMPACTION ,LEVELLING AND FILLING UP OF THE EDGE GAPE 50MM THICK (II) COLOURED DECORATIVE
24.56
875
21490
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
21.11
724
15284.11
... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
21.1
186
3924.6
... More
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
21.1
34
717.4
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
40
245
9800
... More
Estimated amount
-
-
-
... More
Add: 9%SGST
1
13091
22001.31
... More
Add: 9%CGST
1
13091
22001.31
... More
1% LWC
1
2443
2884.62
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements