Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date30 Dec 2024
Closing Date11 Jan 2025
Tender Amount₹ 3,21,655
Costs
EMD
₹ 6,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_792222_1Bid Award Id
ViewTender No
KMC/WS/TPS/96/2024-2025Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
(BASIC COST OF MATERIALS TABLE NO I-1BASIC RATES OF CEMENT & STEEL MATERIALS - 2V STEEL PLATES:(E250CONFORMS TO IS:2062-2006)(A) 6-10 MM. NOTE THE ABOVERATES ARE EXCLUSIVE OF GST OVERHEAD CHARG ES &CONTRACTORS PROFITREFERENCE SCHEDULE: VOLUME IIIROADS & BRIDGE WOTKS,PWD (WB), SCHEDULE OF
RATES: 2018,PAGE 218
0.78
51150
39897
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 2A. M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual
weight of such items with weight of finished structural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. i) For roof truss works a) Span up to 12 Mt
0.63
58832
37064.16
... More
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(8)Cleaning old painted surface and oiling with linseed oil with admixture of paint (25% of linseed oil by volume.)
250
11
2750
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 18)Fitter Mechanic (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
5
270
1350
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be
admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
5
326
1630
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (a) Tack weld
350
9
3150
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (b) Continuous weld.
420
9
3780
... More
BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 19) Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution
will be necessary). (Payment to be made on area cleared)
360
11
3960
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc 10?. Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety
4.9
4482
21961.8
... More
Sub Total
-
-
-
... More
GST 18%
1
48580
48580
... More
L.W.Cess @1%
1
3184
3184.71