Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Building Construction
Eprocure
Opening Date3 Jul 2024
Closing Date16 Jul 2024
Tender Amount₹ 4,95,516
Costs
EMD
₹ 9,910Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_705951_1Bid Award Id
ViewTender No
KMC/ASPH/P.B/BNG-01/2024-25Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,
GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with
gas or electric: (b) Continuous weld.
15917.2
143254
9
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,
GATES ETC. A. ORIGINAL WORKS 3. Cutting to requisite length or
shape departmental R.S. joists,channels, angles, tees, plates etc.
(Payment to be made on area of cut surface)
4765.68
38125
8
... More
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,
GATES ETC. A. ORIGINAL WORKS 5. Labour for hoisting and
placing in proper position (up to 1st floor level) departmental R.S.
joists, channels, angles. Tees, plates etc. including fitting and fixing
same with bolts and nuts, if necessary (but excluding cost of such
bolts and nuts)
27.2
11206
412
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING,
VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on
steel or other metal surface with synthetic oil bound primer of
approved quality including smoothening surfaces by sand papering
etc (This item is applicable to new work or old work when the original
surface has been exposed by removal of old paint.
246.38
7144
29
... More
SECTION 1. ------------BUILDING WORKS (K) PAINTING,
VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best
quality synthetic enamel paint of approved make and brand including
smoothening surface by sand papering etc. including using of
approved putty etc. on the surface, if necessary :(b) On steel or other
metal surface :With super gloss (hi-gloss) -(ii) Two coats (white in
shade)
246.38
18970
77
... More
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES
ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods
and removing rubbish as directed within a lead of 75 m. including
stacking of steel bars.(a) In ground floor including roof.
0.98
1912
1956
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc
7....Controlled Cement concrete with well graded stone chips (20 mm
nominal size) excluding shuttering and reinforcement with complete
design of concrete as per IS : 456 and relevant special publications,
submission of job mix formula after preliminary mix design after
testing of concrete cubes as per direction of Engineer-in charge.
Consumption of cement will not be less than 320 Kg of cement with
super plasticiser per cubic meter of controlled concrete but actual
consumption will be determined on the basis of preliminary test and
job mix foumula. In ground floor and foundation. [using concrete
mixture]M 30 Grade (i) Pakur Variety
0.98
4985
5098
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36..Hire
and labour charges for shuttering with centering and necessary
staging upto 4 m using approved stout props and thick hard wood
planks of approved thickness with required bracing for concrete slabs,
beams and columns, lintels curved or straight including fitting, fixing
and striking out after completion of works (upto roof of ground
floor).(When the height of a particular floor is more than 4 m the
equivalent floor height shall be taken as 4 m and extra for works
beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m
or part thereof).(b) Above 30 mm & upto 37 mm thick wooden
shuttering as per decision & direction of Engineer-In-Charge.Notes:-
For shuttering in shell roof, grid roof with vertical faces folded plate,
arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to
be increased by 100 % . For grid roof with splayed faces, rate is to be
increased by 150%.Notes:- For shuttering in shell roof, grid roof with
vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37
(c ) of subhead B above to be increased by 100 % . For grid roof with
splayed faces, rate is to be increased by 150%.
7.82
2722
348
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works
etc.40..Reinforcement for reinforced concrete work in all sorts of
structures including distribution bars, stirrups, binders etc initial
straightening and removal of loose rust (if necessary), cutting to
requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at
every intersection, complete as per drawing and direction.(a) For
works in foundation and upto roof of ground floor/upto 4 m.(i) Tor
steel/Mild Steel.II. Other than SAIL/ TATA/RINL
0.15
8564
55776
... More
Sub Total
-
-
-
... More
GST 9%
1
37419
37419
... More
GST 9%
1
37419
37419
... More
CESS 1%
1
4906
4906.1