Kolkata Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Municipal Corporation - KMC Tender

Works
Automobiles and Auto Parts
Eprocure
Opening Date28 Jul 2023
Closing Date11 Aug 2023
Tender Amount₹ 2,53,494 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
TO & FRO TRANSPORTATION OF COMPLETE SHAFT - IMPELLER ASSEMBLY FROM PUMP-HOUSE WORK SITE TO THE CONTRACTORS WORKSHOP AND VICE- VERSA INCLUDING LOADING AND UNLOADING WITH PROPER CARE AS PER DIRECTION OF EIC.RATE ANNALYSIS APPROVED BY DG(WS) ON DATED15/06/2018

412

3914

9.5

... More
REMOVAL OF HALF COUPLING USING THE HYDRAULIC PULLER & FIXTURES ETC. VERY CAUTIOUSLY FROM THE SHAFT AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018

2831.14

1557

0.55

... More
SURFACE PREPARATION OF THE KEY SLOT AND KEY WAY CUTTING AND INSERTION OF KEY & COMPLETE IN ALL RESPECT AS PER DIRECTION  OF EIC RATE ANALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018

50

1500

30

... More
FITTING & FIXING OF THE HALF COUPLING BY HYDRAULIC JACK & SPECILIZED FIXTURE ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018.

2831.14

1415

0.5

... More
TAKING OUT THE BEARINGS ( HAVING ID.75MM TO 200MM) WITH PROPER CARE & CAUTION BY PROVIDING ALL RELEVANT TOOLS & FIXTURES AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018.

217.3

10865

50

... More
TRUENESS AND ECCENTRICITY CHECKING OF THE SHAFT IMPELLER ASSEMBLY, TRUENESS CHECKING OF THE COUPLING AND DYNAMIC BALANCING THE COMPLETE ASSEMBLY BY ADDING OR REMOVING THE UNBALANCED MASS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. THE BALANCING CERTIFICATE MUST BE FURNISHED TO THE DEPARTMENT. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018

412

11124

27

... More
POSITIONING, FITTING & FIXING THE COMPLETE ROTATING ASSEMBLY ON THE PUMP BOTTOM VOLUTE WITH ALL SEQUENTIAL PROCEEDINGS AND KEEPING UTMOST CARE & CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018.

412

10300

25

... More
MAKING ALIGNMENT OF THE SHAFTS OF PUMP & MOTOR BY USING DIAL GAUGE ETC, INCLUDING INSERTION OF REQUISITE DIMENTIONED BRASS SHEETS & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018

2831.14

6370

2.25

... More
SEQUENTIAL INSERTION OF PACKINGS ( PTFE HYDRAULIC PACKING-STYLE-374 (SIZE-15.5 TO 25MM) AT BOTH END (DE & NDE SIDES ) & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018.

3.6

12060

3350

... More
MAKING COUPLING THE HT PUMP WITH THE DRIVE MOTOR BY INSERTING THE COUPLING PINS ETC WITH CARE & CAUTION & COMPLETE AS PER DIRECTION OF EIC. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018

2831.14

1415

0.5

... More
COMMISSIONING THE HT PUMP WITH THE DRIVE MOTOR WITH SEQUENTIAL PROCESS WITH PROPER CARE & CAUTION & DO NEEDFUL OBSERVATION FOR TRIAL RUN TO ACHIEVE THE SATISFACTORY OPERATION OF THE PUMP & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANNALYSIS APPROVED BY DG(WS) ON DATED 15/06/2018.

1

7500

7500

... More
CHAPTER - VII MISCELLANEOUS ITEMS Coating of 'Food Gr. Epoxy' Resin of thickness not less than 240 micron with a low-viscosity, crystallization-resistant food grade epoxy resin base with a reactive diluents combined with high build epoxy amine adducts as per BS 5493 standard and a polyamide or amido polyamine or any other suitable hardener. It shall react with epoxy resin at normal ambient temperature, suitable for solvent-free coatings as per recommended proportion for use on metal, concrete and wood surface to protect from corrosion, give anti-fungal properties ,as per guide line of FDA and USDA as well as damage from chemical reaction after making the surface free from dust, oil and moisture etc. all complete as per instruction and to the satisfaction of ElC. [ This item will be operated on prior permission from the concerned SE/Dy Chief Engineer]

12

9624

802

... More
FITTING FIXING OF THE BALL/ROLLER BEARING (HAVING ID- 75 MM TO 200 MM) BY APPLYING THE METHOD OF EXPANSION OF INNER RACE IN HOT OIL DIPPING OR OTHER SUITABLE METHOD OF EXPANSION WITH PROPER CARE & CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG WS DATED 15.06.2018

217.3

18470

85

... More
Supply and delivery of the following bearing (Make: SKF):22312E/C3

1

25420

25420

... More
REMOVAL OF SLEEVES BUSHES/STUFFING BOX BUSH/JAM NUTS ETC. COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. MODE OF MEASUREMENT - WEIGHT OF SLEEVES/JAM NUTS/STUFFING BOX BUSH ETC. WITH SHAFT. RATE ANALYSIS APPROVED BY DG WS DATED 25.06.2018

12

432

36

... More
MANUFACTURING, FITTING & FIXING OF STUFFING BOX BUSH (MOC- SS 304) AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG WS DATED 25.06.2018

12

29400

2450

... More
MANUFACTURING, FITTING & FIXING OF COUPLING PIN BUSH (MOC- NEOPRENE RUBBER MOULDED HAVING GUN METAL LINER ON INNER SIDE) COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG WS DATED 25.06.2018

1

2550

2550

... More
MANUFACTURING, FITTING & FIXING OF COUPLING PIN(MOC-EN-24) WITH BOLTS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. RATE ANALYSIS APPROVED BY DG WS DATED 25.06.2018

3

6780

2260

... More
SUPPLY AND DELIVERY AT SITE OF PRESSURE GAUGE HAVING DIAL SIZE 150 MM, RANGE OF PRESSURE 0 TO 7 KG/SQCM AND 0 TO 1 KG/SQCM. MODEL 6PSSSWA2 AND MADE OF DIE CAST ALUMINIUM. WEATHERPROOF, PAINTED STOVE ENAMELED BLACK FINISH INNER BEZEL OF ABS PLASTIC. RATE ANALYSIS APPROVED BY DG WS DATED 25.06.2018

4

33082

8270.54

... More
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS  Supply of Chlorinated Polyvinyl  Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007Q) Ball Valve (b) 20mm

4

608

152

... More
PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS (A)-(III) CPVC PIPE WORKS AND FITTINGS Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories,specials viz. socket,bend,tee,union,cross,elbo,nipple,longscrew, reducing socket,reducing tee, short piece etc.fitted with holder bats clamps, including cutting pipes,fitting, fixing etc.complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (a) For Exposed Work (i) CPVC Pipes Class-1, SDR-11 (Dia) 20 mm

60

8580

143

... More
Sub Total

-

-

-

... More
GST 18%

1

38286

38286

... More
CESS 1%

1

2509

2509.85



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.