Kolkata Municipal Corporation Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date4 Feb 2025
Closing Date13 Feb 2025
Tender Amount₹ 1,99,309
Costs
EMD
₹ 4,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KMC_810688_1Tender No
EEWS/KMC/GRWW/24-25/172Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Hire and labour charges for shoring work (including necessary
close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting
etc) complete as per direction of the Engineer-in charge for
foundation excavation (vertical surface are in contact with supported
earth is to be measured.) (This item should be executed on specific
direction of the Enginner in charge).(a) Depth upto 1.5 m.
47.1
386
18180.6
... More
Hire and labour charges for shoring work (including necessary
close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting
etc) complete as per direction of the Engineer-in charge for
foundation excavation (vertical surface are in contact with supported
earth is to be measured.) (This item should be executed on specific
direction of the Enginner in charge). (b) For additional depth beyond
1.5 m. and upto 3.00 m
41.94
439
18412.76
... More
Hire and labour charges for shoring work (including necessary
close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting
etc) complete as per direction of the Engineer-in charge for
foundation excavation (vertical surface are in contact with supported
earth is to be measured.) (This item should be executed on specific
direction of the Enginner in charge) (c) For additional depth beyond
3.00 m.
26.83
498
13361.34
... More
Hire and labour charges for
100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other
approved timber posts each 2.0 m in length, tied 2 number post
strongly with coir ropes in the fashion of a scissor with a spacing of
1.8 m over pacca road without damaging the surface and tying
strongly 3 (three) rows of bamboo railing on each leg and 1 (one)
railing connecting all the pivot junctions including cost of loading
unloading, stacking & carriage of all materials and labour complete,
and maintaining barricading for a period beyond 5 (five) days after the
reported & recorded time of completion of the entire work to the
satisfaction of Engineer-in-charge. (Note: This work should not be
executed without specific permission of Superintending Engineer).
(100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other
approved timber post @ 1.80m apart). (ii) Railing 3 row on each leg
and 1 at pivot point.
46
178
8188
... More
Sealing of uneven gap in
PSC Socket/spigot joint by insertion of 19 mm thick asbestos graphite
packing (AMP-32) including supplying. fitting and fixing all complete.
46.63
870
40567.23
... More
Supplying including cost
of installation of M.S. Patch Clamps suitable for instantaneous repairof horizontal cracks in C.I. Spun Pipes (as per IS: 1536) and D.I.
Pipes (as per IS: 8329). The Clamp constitutes of two semicircular
halves made out of 5/6 mm thick Steel Plate duly contoured to match
the circumference of the pipes. The Clamp should be with suitable
rubber lining/ trey so that on fixing over the damaged pipe, it instantly
repairs longitudinal cracks or hole in the pipe body. The length of the
Clamp should be 300 mm up to 300 mm nominal dia. and 500 mm in
case of pipes of larger nominal diameter of pipe. Sealing Rubber
Gasket should be of EPDM quality and Nut Bolts should be Zinc
coated. Fitting and fixing should be in proper position with proper care
of main pipe line for leak proof condition. Diameter in mm 600
1
21226
21226
... More
Earth work in filling in foundation trenches or plinth with good earth,
in layers not exceeding 150 mm. including watering and ramming etc.
layer by layer complete. (Payment to be made on the basis of
measurement of finished quantity of work) (a) With earth obtained
from excavation of foundation
107.79
77
8357.65
... More
Dewatering by pumps
including all leads, lifts and making all arrangements of disposal.
where continuous flow of water from a source other than natural or
ground water is encountered in case of emergency maintenance
works related to leakage. breakage and making wet connections.
[Note ;- In case of any other situation demanding such emergency
dewatering. use of this item is to be approved by the Superintending
Engineer/Tender Accepting Authority. This item shall be executed on
the specific direction duly supported by proper clarification of the
E.I.C. who will be satisfied in absolute discretion that such work has
not been necessitated due to any natural source of water or any fault
of the Contractor]
620
33
20460
... More
Sub Total
-
-
-
... More
GST 9%
1
15051
15051
... More
GST 9%
1
15051
15051
... More
CESS 1%
1
1973
1973.36
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements