Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Road Construction
Eprocure
Opening Date18 Jul 2024
Closing Date27 Jul 2024
Tender Amount₹ 9,98,365
Costs
EMD
₹ 20,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_716463_1Bid Award Id
ViewTender No
KMC/DGC/XII/101/01/24-25Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])
5
91
18.3
... More
Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 300mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )
16
4248
265.54
... More
Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )
10
2146
214.63
... More
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
0.08
207
2596.83
... More
Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post work
65.86
5262
79.9
... More
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion
32.82
143521
4373
... More
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
651.9
15645
24
... More
PWD ( BLDG )_12_TH_CORRIGENDA_ADDENDA_16 _ DT_14-10-2020_PAGE 2, SL.NO(2)(B) SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF INTERLOCKING CONCRETE BLOCK PAVEMENTS
(ICBP) WITH CONCRETE BLOCKS (WITH CONCRETE GRADE AS
SPECIFIED AS PER TABLE I OF IS 15658 : 2006)
MANUFACTURED FROM BIS LICENSEE MANUFACTURE, WITH
SPACER NIB (SMALL PROTRUDING PROFILES ON THE
VERTICAL FACE OF A PAVER BLOCK USED AS A DEVICE FOR
KEEPING MINIMUM JOINT GAP IN BETWEEN THE PAVING
BLOCKS, AS PER CI. NO. 3.26 OF IS: 15658)AND OF SPECIFIED
SIZE AND SHAPE WITH ASPECT RATIO(THE RATIO OF LENGTH
TO THICKNESS OF A PAVER BLOCK, AS PER
STRENGTH/BREAKING LOAD AS PER ANNEXURE G OF
IS:15658, ON THE PREPARED BASE COURSE OF SPECIFIED
CBR AS PER TABLE 1 OF IRC SP63(20018) OR ELSE AS
MENTIONED IN DESIGN AND DRAWING WITH A CUSHION OF
COMPACTED BEDDING SAND OF 25 -35MM THICK (GRADING
OF THE BEDDING SAND AS PER CLAUSE 6.5.1 OF IRC SP 63)
AND FILLING UP THE GAPS IN BETWEEN PAVER BLOCKS WITH
JOINT FILLING SAND ( THE GRADING OF THE JOINT FILLING
SAND WILL BE AS PER CLAUSE 6.5.2 OF IRC SP63) AND
COMPLETING THE EDGES WITH CUT BLOCKS AS PER CL.NO.
8.7 OF IRC SP63(2018) WITH PROPER CONFINEMENT OF
BEDDING AND JOINT FILLING SAND, COMPACTION LEVELING
AND FILLING UP OF THE EDGE GAP.
50MM THICK,
(II) COLORED DECORATIVE.
651.9
570412
875
... More
Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)
2
3517
1758.9
... More
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
125
30625
245
... More
Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete
457.4
56717
124
... More
LOADING, UNLOADING AND STACKING BY MANUAL MEANS
27.44
1701
62
... More
CARRIAGE
27.44
3402
124
... More
Sub Total
-
-
-
... More
GST 18%
1
150774
150774.08
... More
CESS 1%
1
9884
9884.81
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements