Kolkata Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Municipal Corporation - KMC Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date5 Nov 2024
Closing Date3 Dec 2024
Tender Amount₹ 51,79,445.95 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,04,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Kmc/ws/igwtp/011/24-25, Dt-25/10/2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMC_766844_1Tender No
KMC/WS/IGWTP/011/24-25, DT-25/10/2024Tender Authority
Kolkata Municipal Corporation ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Hire & labour charges for diesel generating set for lighting including fuel, 300M wire, 11 points with 200 Watt bulb with post for hanging & maintaining the same for day & night for the period.
60
1650
99000
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete, a) Up to 1.50 m below G.L.
2.48
11927
29519.33
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring
1.71
19238
32935.46
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required completec) (c) Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary
4.95
23470
116176.5
Extra over the corresponding item of earth work for removing semi liquid mud or slushy earth by iron pans, buckets etc.
9.14
2658
24294.12
Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge). (a) Depth upto 1.5 m
0.8
386
308.8
Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge). (b) For additional depth beyond 1.5 m. and upto 3.00 m
156
439
68484
Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(c) For additional depth beyond 3.00 m.
312
498
155376
Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor
14050
33
463650
Supply, including Carrige, Loading unloading at site of Steel Plates : ( E 250 conforms to IS : 2062- 2006 )
16422.7
73
1198857.1
Fabricating M.S. pipes of different diameter in shop out of 8mm to 12mm thick M.S plates supplied departmentally, cutting the plates to exact size & shape by gas cutting device and/or by adopting any other approved type of mechanical means, bending the same in true curvature by template and rolling machine of approved design including proper marking, levelling joints followed by electric arc welding as per relevant I.S. specification longitudinal and circumferential, as necessary, usiug standard electrodes including edge preparation, electricity charges and hydraulic testing of the fabricated piece all complete as per specification and direction of the Engineer-in-Charge. [The Engin
12.95
9448
122342.15
LowerIng M.S pipes & specials in trench up to a depth of 3.00 metre below G.L, laying and jointing the same inside the trench / over ground by means of electric arc welding using standard electrodes as per l.S. specification, all complete as per direction of the Engineer-in-Charge. [The Engineer-in-Charge shall approve the electrodes for arc welding before use. (For laying over ground. the rates shall be reduced by 10% and that is inclusive of holding arrangements) ] Diameter in mm : 1500mm dia.
0.25
120014
30003.5
Gas Cutting of ms pipes and/or ms plate of different thickness all complete as per specification and direction of the Engineering in charge. 8 mm thk plate
442.75
213
94305.75
Field welding of machined ends of pieces of M.S pipes and specials for laying the same inside trench/over ground by means of electric arc welding as per relevant IS specification using standard electrodes including edge preparation and charges of deployment of electric generator set with fuel, lubricant, and all other tools and plants all complete as per specification and direction of Engineer-in-Charge. [ Engineer-in-Charge shall approve the electrodes for arc welding before use ] Throat thickness in mm :08 mm
460.5
1806
831663
Coating of 'Epoxy' Resin of thickness not less than 160 micron with a lowviscosity, crystallization-resistant epoxy resin base with a reactive diluents combined with high build epoxy amine adducts as per BS 5493 standard and a polyamide or amido polyamine or any other suitable hardener. It shall react with epoxy resin at normal ambient temperature, suitable for solvent-free coatings as per recommended proportion for use on metal, concrete and wood surface to protect from corrosion as well as damage from chemical reaction after making the surface free from dust, oil and moisture etc. all complete as per instruction and to the satisfaction of ElC. [ This item will be operated on prior permission from the concerned SE/Dy Chief Engineer]
169.67
449
76180.93
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes: a) Pakur Variety
14.98
4651
69653.38
Brick work with 1st class brick in cement mortar (4:1). For chair.
(a) in foundation and plinth
70.01
5428
379987.14
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.
42
358
15036
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
221.4
186
41180.4
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m
221.4
34
7527.6
Filling in foundation or plinth by silver sand in layers not exceeding 150mm. as directed and consolidating same as by thorough saturation with water ramming complete, including the cost of supply of sand.
(payment to be made on measurement of finish quantity)
0.5
93621
46810.5
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work.
a) With Earth obtained from excavation of trenches.
8.64
7754
66971.3
Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.
50
166
8300
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal
arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled
steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of
structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for
each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m (3rd Corrigenda & addenda dated 04.06.2018)
1
72603
72603
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Compressor machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, Tools and plants all complete for cutting Road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of EIC . a) With Pneumatic hammers For minimum engagement of 8 hrs. In a day
20
6000
120000
HIRE CHAHIRE CHARGES OF MOVEABLE CRANE WITH FUEL & MANPOWER, HAVING LOADING CAPACITY OF RANGE FROM 2.0 MT TO 14.0 MT WITH THE 45 DEGREE MOVABLE ARRANGEMENT & THE BOOMLENGTH OF 40 FEETS FOR LOADING & UNLOADING OF VARIOUS MATERIALS/ ASSCESSORIES OF WATER SUPPLY WORKS UNDER WATER SUPPLY DEPARTMENT, KMC.
20
7936
158720
Sum of Basic Prices (Sl No-1 to 28)
-
-
-
GST @ 18% on the Sum of Sl. No-29
1
782262
782262.35
LWC @ 1% on the Sum of Sl. No.29 and 30
1
51281
51281.64
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%