Kolkata Metropolitan Development Authority Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Metropolitan Development Authority - KMDA Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date15 Mar 2024
Closing Date3 Apr 2024
Tender Amount₹ 72,80,428
Costs
EMD
₹ 1,45,609Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
23/ee(e/m)/ Ebsd /em/kmda/et-23 Of 2023-24
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMDA_685496_1Bid Award Id
ViewTender No
23/EE(E/M)/ EBSD /EM/KMDA/eT-23 of 2023-24Tender Authority
Kolkata Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
For the period of third year
12
1689072
140756
Checking of all the Mechanical parts and preventive maintenance of all pump machinary as per technical specification and scope of work and direction of the EIC.(twice a week)
-
-
-
For the period of first year
104
95160
915
For the period of second year
104
99424
956
For the period of third year
104
104000
1000
Checking of all the Electrical parts including Battery Bank and preventive maintenance of all electrical machinary as per technical specification and scope of work and direction of the EIC .(Twice a week)
-
-
-
For the period of first year
104
95160
915
For the period of second year
104
99424
956
For the period of third year
104
104000
1000
Supervision of all the staffs & look -after the entire pumping station to ascertain the overall condition of all the electro-mechanical equipments and conveying the same to the EIC or his authorized representative and to carry out the instructions given by them within the stipulated time frame.(Twice in a week)
-
-
-
For the period of first year
104
57304
551
For the period of second year
104
59904
576
For the period of third year
104
62608
602
Supplying of the following consumable materials for minor maintenance of all the Electro-mechanical equipments
-
-
-
Gland Packing[6 mm]
80
51280
641
Gland Packing[12/20 mm]
60
35880
598
Transformer Oil
500
65500
131
Supply of Grease
120
33960
283
Indicating Lamp for Panel only
30
6720
224
HRC fuse link (2-16) Amp
60
5400
90
HRC Fuse 32 Amp HF type
30
5070
169
Fuse Holder 20 Amp
10
1020
102
Fuse holder 63 Amp (both side cable)
10
1690
169
Rotary Handle
6
4656
776
Single core Cu Conductor 2.5 mm
6
20178
3363
Supply of MCB
30
6220
207.36
Supply of Champion Brand 40 WT/L (PHE Schedule)
40
2172
54.3
S,F& replacement of 40 watt choke for florescent tube light including removing and refixing of luminaries as required.
30
5010
167
S&F, replacement of starter for florescent tube light.
30
630
21
Dehydration of transformer Oil
500
4500
9
Cleaning of Pump House & the equipment including supply of consumables like soap, phenyl, duster, mop etc.
-
-
-
For the period of First year
52
48256
928
For the period of Second year
52
50232
966
For the period of Third year
52
52260
1005
Clearing compound premises of shrubs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared)
7500
82500
11
Added:- @ 18% as GST
1
1099578
1099578.02
Added:- @ 1% as labour cess
1
72083
72083.45
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements