Kolkata Metropolitan Development Authority Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Metropolitan Development Authority - KMDA Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date18 Jun 2024
Closing Date12 Jul 2024
Tender Amount₹ 1,18,48,948
Costs
EMD
₹ 2,36,979Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
01/se(nc)/sdandswm/kmda Of 2024-2025, Dated-11/06/2024 (sl. No.-01)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMDA_695395_1Bid Award Id
ViewTender No
01/SE(NC)/SDandSWM/KMDA of 2024-2025, Dated-11/06/2024Tender Authority
Kolkata Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity).
258.99
242469
93621
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc.) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Engineer in charge).
(a) Depth up to 1.5 m.
480.32
185403
386
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
1384.68
229856
166
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
1726.58
623295
361
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes.
a) Pakur Variety
258.99
1415919
5467.08
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety
53.06
319244
6016.67
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(a) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
367.81
135721
369
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel
II. Other than manufacturers not specified
5.21
287130
55111.4
Brick work with 1st class bricks in cement mortar (1:4)
(a) In foundation and plinth
574.09
3261979
5682
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(i) With 1:4 cement mortar
(a) 20 mm thick plaster
2059.8
383122
186
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
2059.8
70033
34
Constructing gully pit to a depth of 1.50m (Inside) with 250mm th. 1st class Brick Work (1:4) in all sides over a layer of jhama brick soling & 100mm th. jhama cement concrete (1:4:8) including necessary earth work, providing approved type C.I. Syphone (225mm dia) with topping RCPC gully grid (15MT load bearing capacity) constructing invert with brick-on-edge, including 20mm th. inside cement plaster (1:4) finished with neat cement punning, at the top 150mm th. R.C.C. slab (1:1.5:3) with stone chips including necessary reinforcement, shuttering as per standard drawing and as directed by E-I-C complete in all respect and removal of surplus earth with all costs of labour and materials. Inside measurement of gully pit, 1100mm × 600mm
20
460100
23005
Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S- 12592(M.D)
iv) 15 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size
Cover: 460 mm X 75 mm
Frame: 620 mm X 150 mm
opening: 360mm
Weight: 100 kg (approx)
120
304320
2536
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thick
22
20658
939
Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge.
5500
126500
23
Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C
20
37340
1867
Utility line shifting.
a) Electrical pole(one pole @500m).
11
261481
23771
b) HT Line (1m @ 200m).
6
10800
1800
c) Water Line (1m @ 150m avg. dia 400).
7
32060
4580
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed.
(iii) 150mm diameter
3010.4
653256
217
Supplying Eucalyptus Bullah piles at work site, inclunding dressing and making one end pointed.
ii)100 mm diameter(Runner)
170
16320
96
Labour for driving sal bullah Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position protection the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (iii) 150mm diameter
1704
178920
105
Labour charge for fitting & fixing 10cm to 13cm diameter sal bullah as ties and runners including cost of nuts & bolts required complete as per direction of EIC
170
3502
20.6
Coal tarring on wooden surfaces including cost of materials single coat.
a)Double coat
1471.28
52966
36
Supply empty cement bags in good condition.
5464
18031
330
Filling empty cement bags with dry earth or sand stitching the bag (cost of thread included and carrying and placing them in position and all incidental charge complete but excluding cost of sand and gunnybags)
5464
19124
350
Cost of Silver Sand as per approved specification stacked at site.
153
122400
800
Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them outside Government land including all leads and lifts to stack in a nearby available space complete.
345
2415
7
Clearing and removal of debris (including floating debris) including sludge & slush mixed with all sorts of industrial waste, solid/semi-solid compact mass formed due to water hyacinth in combination with industrial wastes, carcasses, municipal garbage sludge, polypacks, thick and thorny jungles and long grass etc. and depositing, spreading the same on the canal bank and later burnt to ashes when dry including all leads and lifts complete.
547.5
16425
30
Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc.
(Measurement : Pre-work and Post-work level section. Pre- work section to be taken after removal of water hyacinth and all other floating
materials etc.)
(a) By manual means within lead of 510 M and beyond initial lift of 1.50 M.
783
221589
283
Goods and Services Tax (GST) @ 18 % on Sl No. - 01 to 30.00
1
1789570
1789570.88
Cess @ 1 % on Sl No. - 01 to 31.00
1
117316
117316.31
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements