Kolkata Metropolitan Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Metropolitan Development Authority - KMDA Tender

Works
Machinery and Tools
Eprocure
Opening Date11 Mar 2024
Closing Date1 Apr 2024
Tender Amount₹ 64,88,758 
Notes
Download

Costs

Summary

Kmda/em/ee/md-iii/nit-28 (2nd Call) Of 2023-24

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For the period of Third year

72

1435032

19931

... More
Checking of all the Mechanical parts and preventive maintenance of all pump machinary as per technical specification and scope of work and direction of the EIC. (Twice a week)

-

-

-

... More
For the period of First year

104

90376

869

... More
For the period of Second year

104

94120

905

... More
For the period of Third year

104

97968

942

... More
Checking of all the Electrical parts including Battery Bank and preventive maintenance of all pump machinary as per technical specification and scope of work and direction of the EIC. (Twice a week)

-

-

-

... More
For the period of First year

104

90376

869

... More
For the period of Second year

104

94120

905

... More
For the period of Third year

104

97968

942

... More
Supervision of all the staffs & visit to the entire pum phouse to ascertain the overall condition of all the electro-mechnical equipments and conveying the same to the EIC or his authorized representative and to carry out the instructions given by them within the stipulated time frame. (Twice a week)

-

-

-

... More
For the period of First year

104

57304

551

... More
For the period of Second year

104

59696

574

... More
For the period of Third year

104

62192

598

... More
Supplying of the following consumable materials for minor maintenance of all the Electro-mechanical equipments.

-

-

-

... More
Gland Packing [12/20 mm]

60

35880

598

... More
Transformer Oil

627

82137

131

... More
Supply of Grease

90

25470

283

... More
Single core Cu Conductor 2.5 mm

1

4710

4710

... More
Indicating Lamp for Panel Only

15

3360

224

... More
HRC fuse link ( 2-16 ) Amp.

45

4050

90

... More
HRC fuse 32 Amp HF type

45

7605

169

... More
Fuse Holder 20 Amp

30

3060

102

... More
Fuse Holder 63 Amp ( both side cable)

12

2028

169

... More
Supply of MCB

30

6220

207.36

... More
Dehydration of Transformer Oil

4080

36720

9

... More
Supply of LED Tube Light Essential LED tube 1200 MM 20W865 T8 IND[2100lm] (Make: Philips or Equivalent)

45

12870

286

... More
Supply & delivery of Flood lighting luminaire with single die ceramic base high power LED . [(Type:- BVP192 LED 82 CW HO NB FG GR PSU), (Make: Philips or Equivalent)]

9

62496

6944

... More
Alignment of the pump motor after necessary adjustment for required matching of faces to the flexible coupling within allowable tolerance.

12

60000

5000

... More
Cleaning of the Pump House & the equipment including supply of consumable like Soap ,Phenyl, Duster , Mop etc. (Once in a week )

-

-

-

... More
For the period of First year

52

48256

928

... More
For the period of Second year

52

50232

966

... More
For the period of Third year

52

52312

1006

... More
Cleaning compound premises of shrubs , plants ,jungles etc. by cutting and removing as directed (Specific permission of Engineer-In-Charge prior to ececution will be necessary)

6000

66000

11

... More
Add GST @ 18%

1

980010

980010.5

... More
Add LWC @ 1%

1

64245

64245.13



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.