Kolkata Metropolitan Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Metropolitan Development Authority - KMDA Tender

Works
Machinery and Tools
Eprocure
Opening Date21 Mar 2024
Closing Date5 Apr 2024
Tender Amount₹ 63,61,913 
Notes
Download

Costs

Summary

Kmda/em/ee/md-iii/nit-29 Of 2023-24 (sl.-3)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For the period of Third year

72

1436832

19956

... More
Checking of all the Mechanical parts and preventive maintenance of all pump machinary as per technical specification and scope of work and direction of the EIC. (Twice in week)

-

-

-

... More
For the period of First year

104

95680

920

... More
For the period of Second year

104

99424

956

... More
For the period of Third year

104

103272

993

... More
Checking of all the Electrical parts including Battery Bank and preventive maintenance of all electrical machinary as per technical specification and scope of work and direction of the EIC . (Twice in a week)

-

-

-

... More
For the period of First year

104

95680

920

... More
For the period of Second year

104

99424

956

... More
For the period of Third year

104

103272

993

... More
Supervision of all the staffs & look-after the entire pumping station to ascertain the overall condition of all the electro-mechnical equipments and conveying the same to the EIC or his authorized representative and to carry out the instructions given by them within the stipulated time frame. (Twice in a week)

-

-

-

... More
For the period of First year

104

57616

554

... More
For the period of Second year

104

59800

575

... More
For the period of Third year

104

62088

597

... More
Supplying of the following consumable materials for maintenance of all the Electro-mechanical equipments:

-

-

-

... More
Gland Packing [6 mm]

30

19230

641

... More
Gland Packing [12/20 mm]

90

53820

598

... More
Supply of Grease

60

16980

283

... More
Indicating Lamp for Panel only.

20

4480

224

... More
HRC fuse link (2-16) Amp

36

3240

90

... More
HRC Fuse 32 Amp HF type

12

2028

169

... More
Fuse Holder 20 Amp

10

1020

102

... More
Fuse holder 63 Amp (both side cable)

10

1690

169

... More
Supply of MCB

15

3110

207.36

... More
Supply of LED Tube Light Essential LED tube 1200 MM 20W865 T8 IND[2100lm] (Make: Philips or Equivalent)

30

9180

306

... More
Supply & delivery of Flood lighting luminaire with single die ceramic base high power LED . [(Type:- BVP192 LED 82 CW HO NB FG GR PSU), (Make: Philips or Equivalent)]

3

20832

6944

... More
Single core copper conductor 2.5 sq mm

3

10089

3363

... More
Rotary Handle

3

2328

776

... More
Cleaning of the Pump House & the equipment including supply of consumable like soap, phenyl Duster , mop etc.

-

-

-

... More
For the period of First year

52

48516

933

... More
For the period of Second year

52

50388

969

... More
For the period of Third year

52

52364

1007

... More
Alignment of the pump motor after necessary adjustment for required matching of faces to the flexible coupling within allowable tolerance.

9

45000

5000

... More
Cleaning compound premises of shrubs , plants ,jungles etc. by cutting and removing as directed (Specific permission of Engineer-In-Charge prior to execution will be necessary)

6000

66000

11

... More
Add GST @ 18%

1

960852

960852.85

... More
Add LWC @ 1%

1

62989

62989.24



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.