Kolkata Metropolitan Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Metropolitan Development Authority - KMDA Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date6 Dec 2024
Closing Soon28 Dec 2024
Tender Amount₹ 3,35,13,245 
Notes
Download

Costs

Summary

19/se(prog)/sdandswm/kmda Of 2024-2025(sl No -02)(2nd Call)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling all types of masonary excepting cement concrete, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof.

181.4

447

81085.8

... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. a) upto 150 mm. thick

58.31

939

54753.09

... More
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof. [Considering 20% of length of the drain]

37.58

1956

73496.7

... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc.) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Engineer in charge). (a) Depth up to 1.5 m.

1890

386

729540

... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc.) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Engineer in charge). (b) For additional depth beyond 1.5 m. and up to 3.00 m [Considering 70% of 1320 mtr. length of the drain]

645.75

439

283484.25

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation.

1254.53

7754

97275.87

... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

460.8

71181

328002.05

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. for road restoration

4594.5

357

1640236.5

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. a) Pakur Variety. For PCC bace

230.4

5094

1173814.76

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety for Footing bace and wall, hunch, slab, interconnectiong beam

1291.1

5594

7223191.93

... More
Hire and labour charges for shuttering with centering and necessary staging up to 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof of ground floor). (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

1623

334

542082

... More
Hire and labour charges for shuttering with centering and necessary staging up to 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof of ground floor). (f) 25 mm to 30 mm shuttering without staging in foundation.

6418.54

209

1341474.86

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and up to roof of ground floor/up to 4 m . (i) Tor steel/Mild Steel (SAIL/TATA/RINL)

121.62

54841

6669945.08

... More
Brick work with 1st class bricks in cement mortar (1:4). (a) In foundation and plinth

498.75

5491

2738955.45

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar. (a) 20 mm thick plaster.

1710

180

307885.5

... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement. (ii) 25 mm. thick

570

254

144854.1

... More
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.

1710

32

55985.4

... More
Bailing out water including all leads and lifts and including making arrangement for disposal. (2HP 8HR FOR 60 DAYS)

2240

23

51520

... More
Supply of silver sand and stacking at site.

85.56

571

48854.76

... More
Supplying to the site empty cement bags(Capacity 50 kg) in good condition including stacking , incidental charges etc all complete. (a) Polythene bags.

2852

6

17112

... More
Labour for Filling empty cement gunny bags/polythene bag( capacity 50 kg) with all kinds of earth (wet or dry) including sewing (as done in case of cement bags, tying with knob after filling will not be accepted) and stacking in position within 150 m. with all lifts excluding the cost of earth (volume of earth filled Polybags should be considered as 0.028 cum)

2852

7

19964

... More
Dumping of earth/sand filled polybags inclusive of all leads and lift.

2852

3

8556

... More
Removing earth filled Poly bags/ Gunny bags from the channel bed/ slop initially depositing the same near channel bank at a place as directed by the E.I.C. for measurement and then disposing off the same at a distance not less than 150 m from the channel site.

2852

6

17112

... More
Bamboo pile walling made of 65 mm to 75 mm dia. Bamboo (in single line) driven about half length into the ground at very close spacing side by side including necessary bamboo stays, ties, runners etc and lining the exposed portion with sheets made form cut-drums fitted and fixed complete as per direction. (a) With bamboos of length between 1.20 m. and 1.80 m. each.

170

837

142290

... More
Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S- 12592(M.D) (ii) 25 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover: 680 mm X 90 mm Frame: 800 mm X 165 mm opening: 500mm Weight: 196 kg (approx)

104

3382

351728

... More
Constructing catch pit to a depth of 1.0m (Inside) with 250mm th. 1st class Brick Work (1:4) in all sides over a layer of jhama brick soling & 100mm th. jhama cement concrete (1:4:8) including necessary earth work, providing approved type C.I. Syphone (150mm dia) with topping RCPC gully grid (5MT load bearing capacity) constructing invert with brick-on-edge, including 20mm th. inside cement plaster (1:4) finished with neat cement punning, at the top 100mm th. R.C.C. slab (1:1.5:3) with stone chips including necessary reinforcement, shuttering as per standard drawing and as directed by E-I-C complete in all respect and removal of surplus earth with all costs of labour and materials. Inside measurement of catch pit, 600mm × 525mm

154

12175

1874950

... More
Supplying & laying Double Wall Corrugated (with external annular corrugation and smooth internal walls) High Density Polyethelene Pipes conforming to IS 16098 (Part-II):2013 having Stiffness Class of SN 8 with Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR value not more than 10% including necessary jointing materials for nonpressure underground Drainage, Sewerage & Cross drainage application. (ii) 200mm internal dia.

170.8

604

103163.2

... More
Supplying, fitting and fixing yard gully with approved H.C.I. grating complete. (i) 225 mm X 150 mm with 230 mm gratings

135

508

68580

... More
Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I) (A) PVC Pipes. 80 mm

115

578

66470

... More
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. By Fine Sand.

304.5

1006

306503.61

... More
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40)

228.38

1980

452310.39

... More
Removal of rubbish , earth etc from the working site and disposal of the same beyond the compound , in confirmity with the municipal / corporation rules for such disposal loading into truck and cleaning the site in all respect as per direction of engineer in charge .

1873.29

166

310965.31

... More
GST @ 18 % on Sl No 1 TO 35

1

5061574

5061574.28

... More
Cess @ 1 % On Sl No 1 to 36

1

331814

331814.31



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.