Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Metropolitan Development Authority - KMDA Tender
Civil And Construction
Building Construction
Eprocure
Opening Date7 Jan 2025
Closing Date15 Jan 2025
Tender Amount₹ 4,31,894
Costs
EMD
₹ 8,640Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Kmda/housing / Ee/div-iii/circle I /nit-48/2024-2025 For T2
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KMDA_795557_1Tender No
KMDA/HOUSING / EE/DIV-III/Circle I /NIT-48/2024-2025 FOR T2Tender Authority
Kolkata Metropolitan Development Authority ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course,where necessary G.F to 3rd floor roof including scaffolding
(i) With 1:4 cement mortar
a) 10 mm thick plaster
253
133
33649
... More
(b )15 mm thick plaster
55
167
9185
... More
(c ) On external surface: 20 mm thick plaster
57
194
11058
... More
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or concrete surface old or new surface to receive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface thoroughly , complete as per manufacturer's specification and as per direction of the EIC. GF to 3rd floor (Two Coats)
57
45
2570.7
... More
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. Gf to 3rd floor (Two Coats)
a) Premium 100% Acrylic Emulsion
57
84
4788
... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sectionsconforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in-charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labor required for the work including all incidental changes such as electricity charges, labor insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. [GF to 3rd Floor] (I) For structural members of specified sections weighing less than 22.5 Kg./m
1.65
72603
119794.95
... More
White washing including cleaning and smoothening surface thoroughly. All floors :(b) Two coats (to be done on specific instruction).
253
18
4589.42
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
11
166
1826
... More
Add GST @ 18% on Total amount over item No. 1 to 9
362388
-
65229.84
... More
Add Labour Welfare Cess @ 1% on Total amount over item No. 1 to 10
427618
-
4276.18