Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Metropolitan Development Authority - KMDA Tender
Machinery and Tools
Eprocure
Opening Date11 Jan 2024
Closing Date22 Jan 2024
Tender Amount₹ 2,19,216
Costs
EMD
₹ 4,384Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Ee(e/m)/jnnurm-ii/t- 10 Of 2023-24
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KMDA_639213_1Bid Award Id
ViewTender No
EE(E/M)/JNNURM-II/KMDA /2W-11/23-24/241Tender Authority
Kolkata Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
S&F SKF bearing as per sample and direction of EIC (bearing no.6311-2Z).
2
3610
1805.42
... More
S& D shaft sleeve as per sample and direction of EIC.
2
6775
3387.86
... More
Supply and delivery of impeller nut as per sample and as per direction of EIC.
1
4495
4495.29
... More
Supply and delivery of impeller casing ring of pump.
2
1853
926.5
... More
S&D of GKW studs nuts, bolts and washer etc. for the above work.
3
69
23.33
... More
Transportation charges for taking the pump entire shaft assemply from workshop to pump house as per direction of EIC.
2
2156
1078
... More
Installation of the pump including fitting and fixing of sleeve to pump shaft & impeller casing ring on both side of impeller etc.and other pump assembly part with proper care as per TS and direction of EIC.
1
4000
4000
... More
PART: B: Repairing of stator coil of 90 KW, 415 V, 3ph induction motor (Marathon make)
-
-
-
... More
Dismantling motor from electrical connection and decoupling and dismantling of 360 m3/hr capacity pump from motor at Garpha BPS with tools and tackles as per direction of EIC.
1
1244
1244
... More
Opening the foundation bolt of motor, lifting the same using overhead crane and placing the same in the repairing bay on wooden sleeper with proper care as per Ts and direction of EIC.
1
6460
6460
... More
Transportation charges for taking the motor to the workshop, where rectification work will be done after keeping the stool to its position as per direction of EIC.
1
1078
1078
... More
Replaing the damaged motor terminal insulator with new porcelain/resin coated glass bonded insulator etc flexible shorting as per TS and direction of EIC.
2
7983
3991.9
... More
Preliminary checking the whole motor (LT motor) and testing of IR value, load current, leakage factor of stator & rotor, terminal lead joint of stator connection end insulation of glass fibre terminal bar, double cage rotor end ring and all of motor bars and bar joint, housing of DE and NDE shield bearing housing etc. before work to detect fault
housing etc. before work to detect fault.
1
4204
4204
... More
Complete rewinding the stator coil with electrolytic coat enamel copper and H-Class insulation identical to existing one after taking out the burnt coil as per TS and direction of EIC.
1
124200
124200
... More
Transportation charges for taking the motor to the pump house from workshop as per direction of EIC.
1
1078
1078
... More
Reassembling the motor and placing the same on the motor stool using O/H crane, fixing the foundation bolt of the motor and necessary electrical connection and recoupling with 360 m3/hr pump as per TS and direction of EIC.
1
8619
8619
... More
Added GST @ 18 %
1
33108
33108.67
... More
Added cess @ 1 %
1
2170
2170.46
... More
Note: 1. Item no. 4, 5, 6, 7, 8, 15, 17 scrap value deduction has been already made. Hence no scrap value deduction are needed for those items.
-
-
-