Kolkata Metropolitan Development Authority Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Metropolitan Development Authority - KMDA Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date17 Feb 2025
Closing Soon25 Feb 2025
Tender Amount₹ 1,86,034 
Notes
Download

Costs

Summary

Kmda/housing /ee/div-i/circle Vi/nit-24/2024-2025

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (i) Tor steel/Mild Steel (I) JSW/JSPL/SHYAM/SRMB/ELECTROSTEEL/SSL/BMASL b) At Ground floor.

0.1

53239

5323.97

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) (i) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work,in 3rd floor.

15

369

5535

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary. (i) 15 mm thick with 1:4 cement mortar At Ground floor.

80

167

13360

... More
(i) 10 mm thick with 1:4 cement mortar At Ground floor.

100

133

13300

... More
Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification.

80

88

7040

... More
Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment].

2

782

1564

... More
Supplying and application of chemical for post Installed rebar connection by using ETA approved for seismic criteria In rebar connection, Including drill/ng hole to the required depth by rotary hammer drill, cleonlng with brush & jet of clean air, /ill/ng chemical usIng serrated noule to eliminate mIxIng error and in a voldless manner IncludIng charges for all tools & plants. Application to be designed for post· Installed rebars as per ECZ/TR023 or relevant tested of rebar fixing whIch should be furnished by manufacturer. The installation and Injection process should and the setting instructions should be strIctly followed as per manufacturer's specl/icatlons as approved by EICprior to drlll/ng along with post· Installed rebar embedment design report. The existing concrete member should be scanned using rebar scanner to avoid hitting existing reinforcement in concrete during drilling. Notes: 1)This rate is excluding the cost of scaffolding. 2)This work should not be excuted without specific permission of Superintending Engineerof the respective circle and Injection process should be executed in the presence of officer not below the rank of Assistant Engineer to supervise the work minutely. 3) Rebar grouting Is specifically required for extension and strengthening purpose of old or existing RCCstructural members with new RCCstructural members through rebar fixing chemical Item without breaking beam, coloumn, roof slab, lintel, celling etc. i) Cost of rebar with rebar chemical for 8 mm dia per cm of depth

200

10

2000

... More
Supplying preparing and placement of ready mix non shrink cementious micro concrete having no metalic aggregate or chlorides for repairing and jackting of damaged R.C.C.members. The micro concrete should achieve a compressive strength not less than 10 MP aafter 24 hours. 40Mpa after 7 days and 50Mpa aftre 28 days at 300C.It should have unrestrained expansion in between 1 to 4%. flexural strength shall not be less than 5MPa after 28 days. Micro concrete should have a co-efficient of thermal expansion similar to that of the host concrete.

1

50546

50546

... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

5

166

830

... More
Add GST @ 18% on Total amount over item No. 1 to 11

156095

-

28097.1

... More
Add LWC @ 1% on Total amount over item No. 1 to 12

184192

-

1841.92



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.